INSP-Final Inspection | 7/15/2019 | 7/16/2019 | 7/16/2019 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection complete.
Phone #: ###-#### Inspection requested via web by Lonnie Greenfield
|
INSP-Final Inspection | 7/9/2019 | 7/10/2019 | 7/10/2019 | A | CANC |
Jim Page
|
|
|
Phone #: ###-#### >> Inspection requested via web by Lonnie Greenfield Inspection cancelled from web by: Lonnie Greenfield
|
INSP-Supply line flush | 7/8/2019 | 7/8/2019 | 7/8/2019 | A | DONE |
Jim Page
|
|
|
Underground main line flush complete.
Phone #: ###-#### Inspection requested via web by Lonnie Greenfield
|
INSP-Sprinkler Rough-in/Hydro | 7/2/2019 | 7/3/2019 | 7/3/2019 | A | DONE |
Jim Page
|
|
|
Hydrostatic test for overhead fire sprinkler piping witnessed, np pressure loss observed.
Phone #: ###-#### Inspection requested via web by Lonnie Greenfield
|
INSP-Sprinkler Rough-in | 6/21/2019 | 6/21/2019 | 6/21/2019 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for underground supply complete, approved for cover.
Phone #: ###-#### Inspection requested via web by Lonnie Greenfield
|
INSP-Sprinkler Rough-in | 6/17/2019 | 6/17/2019 | 6/17/2019 | P | CANC |
Jim Page
|
|
|
Inspection request was cancelled per conversation with point of contact due to ACHD permiting issues, inspection will be rescheduled for a later date.
U.G. rough in Phone #: ###-#### Inspection requested via web by Lonnie Greenfield
|
INSP-Sprinkler Rough-in | 6/12/2019 | 6/12/2019 | 6/12/2019 | P | PART |
Jim Page
|
|
|
Rough to cover inspection for underground stub in complete, approved for cover.
UG rough in. Phone #: ###-#### Inspection requested via web by Lonnie Greenfield
|
INSP-Sprinkler Rough-in | 5/1/2019 | 5/2/2019 | 5/2/2019 | P | PASS |
Troy Cobbley
|
|
|
*** UG between main house and garage only. OK to cover. Trace wire to be added and left exposed on the interior to be inspected later. MAS***
Cover inspection for UG feed to garage. Please call Lonnie with time frame. Phone #: ###-#### >> Inspection requested via web by Jeff Packham
|