INSP-Final Inspection | 9/17/2019 | 9/18/2019 | 9/18/2019 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled. Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Final Inspection | 9/17/2019 | 9/17/2019 | 9/17/2019 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 9/16/2019 | 9/17/2019 | 9/17/2019 | A | CANC |
Troy Cobbley
|
|
|
Plans are on site with Gerome Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
|
INSP-Sprinkler Rough-in | 8/28/2019 | 8/28/2019 | 8/28/2019 | P | PASS |
Troy Cobbley
|
|
|
Second half of TI sprinkler rough-in passed. Piping can be covered. Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Final Inspection | 7/16/2019 | 7/17/2019 | 7/17/2019 | A | PART |
Troy Cobbley
|
|
|
Phase 1 of work complete. (south side)
Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Sprinkler Rough-in | 6/19/2019 | 6/19/2019 | 6/19/2019 | P | PART |
Troy Cobbley
|
|
|
See the city approved plans for heads marked "ok" where piping can be covered.
Looking at the unoccupied half for now. If possible look at it later in the afternoon they are working on it now. Phone #: ###-#### Inspection requested via web by Sam Ball
|