INSP-Final Inspection | 3/19/2020 | 3/20/2020 | 3/20/2020 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled.
Contact is Zach Grasmick, this inspection is for Underground as per Jim Page. Phone #: ###-#### Inspection requested via web by Chris Green
|
INSP-Sprinkler Rough-in/Hydro | 1/20/2020 | 1/21/2020 | 1/21/2020 | A | PART |
Jim Page
|
|
|
Was informed that permenant heat was established to building, temporary heat is what is keeping the building at 40 degrees and above. Hydrostatic test is unofficial, no pressure loss observed. Periodic check in will be done, if building is below 40 degrees then a re-hydro will be required.
Contact is Raul Phone #: ###-#### Inspection requested via web by Chris Green
|
INSP-Sprinkler Rough-in/Hydro | 1/16/2020 | 1/17/2020 | 1/17/2020 | A | FAIL |
Jim Page
|
|
|
Hydrostatic test not accepted, plans onsite are not city approved drawings.
Contact is Raul Phone #: ###-#### Inspection requested via web by Chris Green
|
INSP-Sprinkler Rough-in | 1/10/2020 | 1/10/2020 | 1/10/2020 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for underground was requested under wrong permit number, rough to cover inspection for underground supply was completed on 07JAN2020 under the overhead sprinkler permit, FIR19-00845.
|
INSP-Supply line flush | 1/10/2020 | 1/10/2020 | 1/10/2020 | P | DONE |
Jim Page
|
|
|
Underground supply flush complete.
|
INSP-Sprinkler Rough-in | 9/17/2019 | 9/18/2019 | 9/18/2019 | A | PASS |
Troy Cobbley
|
|
|
Rough to cover for underground five foot out is passed and ok for cover. Contact is Robert. Phone #: ###-#### Inspection requested via web by Chris Green
|
INSP-Sprinkler Rough-in | 9/17/2019 | 9/17/2019 | 9/17/2019 | P | CANC |
Troy Cobbley
|
|
|
Could not make it to this inspection due to work load and time constriants. Will need to be rescheduled.
Rough in for underground five foot out. Contact is Robert Mullins Phone #: ###-#### Inspection requested via web by Chris Green
|