Information based on query as of Thursday, May 16, 2024.
Permit Information
Permit NumberFIR19-00906
StatusIssued
Name THORPE FIRE SPRINKLER SYSTEMS
Site Address 2393 W AIRPORT WAY
Project NameWILDLAND FIREFIGHTER FOUNDATIO
Customer Number 
ePlanReviewYes
Description
**INSPECTOR SEE NOTE ON PLAN **MAS** TFSS TO INSTALL A NEW NFPA 13 DRY FIRE SPRINKLER SYSTEM IN THIS EXISTING MEMORIAL BUILDING
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Sprinkler Rough-in8/11/20208/11/20208/11/2020AFAIL
DetailsJim Page
Provide auxiliary drain for head under rool up door. Add two uprights in discussed locations due top block head from duct work. Provide correct size fittings for exterior pipe per NFPA13 6.4.7. Add sway braing in areas marked on city approved drawings.

Call James before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
INSP-Supply line flush7/14/20207/16/20207/16/2020ADONE
DetailsJim Page
Main line flush is complete.

Scheduled for 8:30am with Jim Page and Stacy with SUEZ. Call James if anything comes up. Phone #: ###-#### Inspection requested via web by Anthony Minichiello
INSP-Supply line flush6/23/20206/24/20206/24/2020ANR
DetailsJim Page
Flush was not performed due too the amount of wash-out that would happen from the jobsite to the public way, will area cleaned up for no wash out or provide means too flush without wash-out.

Coordinated with SUEZ and Jim for 10:30am, Gary or James will be on site ready to flush. Phone #: ###-#### Inspection requested via web by Anthony Minichiello
INSP-Sprinkler Rough-in1/15/20201/16/20201/16/2020APASS
DetailsJim Page
Remaining pipe for tie in inspection complete, approved for cover.

Call James before heading out, he will make sure the blanket is off and pipe is visible. Phone #: ###-#### Inspection requested via web by Anthony Minichiello
INSP-Sprinkler Rough-in1/14/20201/15/20201/15/2020ACANC
DetailsJim Page
Piping was covered in snow and concrete blanket, piping/fitting could not be seen in the trench, inspection will need to be rescheduled when pipe is visible, this request is cancelled.

Underground rough to cover. Call James before heading out. Phone #: ###-#### Inspection requested via web by Anthony Minichiello
INSP-Sprinkler Rough-in/Hydro12/26/201912/27/201912/27/2019PPASS
DetailsJim Page
Rough to cover inspection for underground supply complete, approved for cover.

Underground fire line. Call James before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello