Final | 12/14/2018 | 12/17/2018 | 12/17/2018 | A | PASS |
Brian Scoles
|
|
|
RUSSELL IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER- final ok- card signed
|
Final | 9/27/2018 | 9/28/2018 | 9/28/2018 | A | PART |
Brian Scoles
|
|
|
HENRY IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER- copper condensate piping ok- missing flex connection wrong size ordered- need unions on gas line on roof couple locations- need to hook up piping to unit heater- needs to add drains for mini split in storage area- need condensate drains put on all RTUs
|
Rough-in | 9/27/2018 | 9/27/2018 | 9/27/2018 | A | NR |
Brian Scoles
|
|
|
need to add all condensate piping to permit and pay fees- need inspection called in when ready
|
Pressure Test | 8/16/2018 | 8/17/2018 | 8/17/2018 | A | PASS |
Chad Schwendiman
|
|
|
ANDY IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER - 60LB gas pass for whole piping system. Need to verify that blocks are secured to the piping at final, and gas piping is supported up off the roof at unit heater location
|