Information based on query as of Friday, May 10, 2024.
Permit Information
Permit NumberMEC18-02215
StatusFinaled
Name KMD MECHANICAL
Site Address 980 N MILWAUKEE ST
Project NameMag. Gardens
Customer Number 
ePlanReviewNo
Description
Alteration: Demo existing HVAC equipment and provide and install new HVAC equipment,Provide and install new controls,grilles,registers,insulation,ducting.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final6/20/20196/21/20196/21/2019APASS
DetailsChad Schwendiman
Mechanical Final inspection needed for AM please call Karl with any questions at ###-#### thank you Phone #: ###-#### Inspection requested via web by Karl Hestekin
Final6/14/20196/17/20196/17/2019AFAIL
DetailsBrian Scoles
Mechanical Final Inspection needed for AM Monday please contact Karl with any questions thank you. Phone #: ###-#### Inspection requested via web by Karl Hestekin- correction not made in kitchen- roof ok
Final6/13/20196/14/20196/14/2019AFAIL
DetailsChad Schwendiman
Final inspection needed for AM I will have the air balance report in the morning as soon as I get it I will send to Brian Scoles and Chad Schwendiman please contact Karl with any questions at ###-#### thank you Phone #: ###-#### Inspection requested via web by Karl Hestekin - Need out air filters installed an SF-1 & 2, Class 1 hoods need to over hang the appliances by 6" on all open sides
Rough-in4/22/20194/23/20194/23/2019ACANC
DetailsBrian Scoles
Rough-in inspection for Milwaukee Nail Salon Please contact Karl before going to project to ensure that door is unlocked thank you Phone #: ###-#### Inspection requested via web by Karl Hestekin
Conference2/7/20192/7/20192/7/2019ADONE
DetailsChad Schwendiman
Met onsite to discuss the existing class 1 hoods. The existing hoods are not being altered, and are being left as they were originally installed and approved for the previouse tenant. Because of this I agreed to let them remain as, but that they need to install stainless steel on all the wall sufaces within 18" of the hoods, and use noncombustable panels in the grid ceiling with in 18" of the hoods. I also advised that we will need an air balance report for the existing hoods using ther CFM's shown on the drawings
Conference2/6/20192/7/20192/7/2019ADONE
DetailsBrian Scoles
Conference AM for Magnificent Garden Please contact Karl with any questions thank you Phone #: ###-#### Inspection requested via web by Karl Hestekin- met with chad karl GC and went over kitchen area for clearance to combusibles issues with class 1 hoods- will install ss sheetmetal in all locations to bring to code
Conference2/6/20192/6/20192/6/2019PDONE
DetailsBrian Scoles
Need a conference for Magnificent Garden by phone today at 1:00pm if possible can contact Karl at ###-#### thank you Phone #: ###-#### Inspection requested via web by Karl Hestekin- looked at existing hoods in kitchen where walls and ceiling were replaced- wasnt on prints of any work done to kitchen area- clearance to combustibles might not be met- all labeling is gone or not ledgeable- will meet tomorrow with chad and karl at 930ish
Rough-in1/11/20191/14/20191/14/2019APART
DetailsBrian Scoles
2nd layer fire wrap needed for Magnificent Garden contact Rob with any questions ###-#### thank you. Phone #: ###-#### Inspection requested via web by Karl Hestekin- 2nd layer fire wrap ok- still need access door framing for all grease duct installed before cover can be issued- need installation instructions on owner provided equipment being installed
Rough-in1/4/20191/7/20191/7/2019APART
DetailsBrian Scoles
Mechanical 2nd Layer Fire wrap needed for Magnificent Garden if you have questions call Karl at ###-#### thank you Phone #: ###-#### Inspection requested via web by Karl Hestekin- missing a couple access doors still- need to add insulation straps on all 90s in throat to heal of 90s and a few places are farther than 12" apart- still need installation instruction on owner provided equipment to verify access doors need to have gasket/sealing meeting 1500 degrees
Rough-in11/12/201811/13/201811/13/2018APART
DetailsBrian Scoles
Mechanical 1st layer fire wrap inspection am preferred please contact Rob at ###-#### thank you. Phone #: ###-#### Inspection requested via web by Karl Hestekin- 1st layer firewrap ok- ok for 2nd layer- middle exhaust west side missing 1 access door on order- still need installation instruction manual on owner provided equipment
Rough-in11/6/201811/7/201811/7/2018APART
DetailsBrian Scoles
Mechanical Grease Duct Inspection needed for Magnificent Garden Am preferred if you have any questions contact Rob at ###-####167 thank you. Phone #: ###-#### Inspection requested via web by Karl Hestekin- Grease duct light test all custom made ducts ok for 1st layer of fire wrap- need installation instruction on grease boxes provide by owner
Rough-in11/2/201811/5/201811/5/2018APART
DetailsBrian Scoles
Mechanical Grease Duct Inspection Needed For Monday AM Please Contact Rob At ###-####. Phone #: ###-#### Inspection requested via web by Karl Hestekin- still have at least 10 holes that need addressed
Rough-in10/26/201810/29/201810/29/2018AFAIL
DetailsBrian Scoles
A.M. Mechanical Grease duct inspection needed contact Rob with any questions. thank you. Phone #: ###-#### Inspection requested via web by Karl Hestekin- checked all square grease duct to many holes-
Rough-in10/24/201810/26/201810/26/2018APART
DetailsBrian Scoles
Am Mechanical grease duct inspection for Magnificent Garden, if you have questions contact Rob at ###-####, thank you:) Phone #: ###-#### Inspection requested via web by Karl Hestekin- checked a couple runs and found some pin holes- Rob will build a shelter to do rest of light test to bright in room- will reschedule for monday
Rough-in9/4/20189/5/20189/5/2018APASS
DetailsBrian Scoles
Mechanical Partial Grease Duct Inspection needed for Magnificent Garden please contact Rob with any questions at ###-#### Thank you:) Phone #: ###-#### Inspection requested via web by Karl Hestekin- missing few bands to complete horizontal mains- ok to insulate horizontal lines excluding tap locations-
Rough-in8/24/20188/24/20188/24/2018PCANC
DetailsBrian Scoles
Rough-In inspection needed for Magnificent Garden please contact Mike with any questions.###-#### Phone #: ###-#### >> Inspection requested via web by Karl Hestekin Inspection cancelled from web by: Karl Hestekin
Rough-in8/22/20188/23/20188/23/2018APART
DetailsBrian Scoles
Rough in needed for AM at Magnificent Garden Also need a partial grease duct inspection contact Rob at ###-#### before you go to job site thanks Phone #: ###-#### Inspection requested via web by Karl Hestekin- 7 grease duct drops ok to firewrap- ok to cover registers- seal on duct ok- need to install clean out access doors and finish grease duct- no cover on horizontal chases a this time
Conference7/23/20187/24/20187/24/2018ADONE
DetailsBrian Scoles
Conference needed at 11:00 am please call Karl with any questions at 208 401 5600 thank you. Phone #: ###-#### Inspection requested via web by Karl Hestekin- discussed mock up and gas piping and fire protection location on duct or ansl system-
Conference7/19/20187/19/20187/19/2018PDONE
DetailsTroy James
Meeting with architects and contractors at 2:00pm
mechanical contractor will do a mockup at table where two grease ducts come together
Conference7/19/20187/19/20187/19/2018PCANC
DetailsBrian Scoles
at 200pm meet with Troy- Discussed issues forgrease duct serving 2 tables- Karl will make mock up and meet again-
Conference5/17/20185/21/20185/21/2018ADONE
DetailsBrian Scoles
Can you please schedule a conference for 10 A.M. Monday for the Magnificent Garden in Boise. Meeting will be held at the following. Thanks If you need to speak to Karl prior to the conference please call ###-####.

Monday May 21, 2018 @ 10am
Musgrove Engineering
234 S. Whisperwood Way
Boise, Idaho Phone #: ###-#### Inspection requested via web by Karl Hestekin-- discussion of location on reserviors on ducting and height issues- will have grease reservior in middle of duct with pitch each way back to reservior
Conference5/17/20185/21/20185/21/2018ADONE
DetailsChad Schwendiman
Meet to discuss clean out locations and reservoir locations for greas duct
Conference5/17/20185/17/20185/17/2018ACANC
DetailsChad Schwendiman
10 am