Final | 12/20/2018 | 12/21/2018 | 12/21/2018 | A | PASS |
Brian Scoles
|
|
|
Request for re inspection on Final. Partial pass 12/17. Please contact Chris ###-#### Inspection requested via web by Heather Gransbery- final ok- card signed
|
Final | 12/14/2018 | 12/17/2018 | 12/17/2018 | P | PART |
Brian Scoles
|
|
|
Request for Final inspection. Please contact Chris, ###-####, with any questions or concerns. Inspection requested via web by Heather Gransbery- temp occupancy ok- still need engineers approval on cassette ductless minisplit that was installed instead of FCU that was ommitted from engineer- rest is good
|
Rough-in | 12/3/2018 | 12/4/2018 | 12/4/2018 | A | PASS |
Brian Scoles
|
|
|
Request for Cover inspection. Please contact job lead, Chris ###-#### with any questions or concerns. Inspection requested via web by Heather Gransbery- insulation ok- flex to registers ok- ok for ceiling tiles- need verification that conference room fan coil unit that was replaced with cassette unit is approved by engineer please provide documentation
|
Rough-in | 10/16/2018 | 10/17/2018 | 10/16/2018 | A | CANC |
Brian Scoles
|
|
|
Request for insulation inspection. Please contact Chris with any questions or concerns ###-#### >> Inspection requested via web by Heather Gransbery Inspection cancelled from web by: Heather Gransbery
|
Rough-in | 10/16/2018 | 10/16/2018 | 10/16/2018 | A | CANC |
Brian Scoles
|
|
|
request for insulation inspection. Please contact job lead Chris with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery- wrong address- need to change address and attach to building permit at this location-
|