Final | 7/12/2019 | 7/15/2019 | 7/15/2019 | A | PASS |
Brian Scoles
|
|
|
Final inspection Contact Cecil McBride with KCI ###-#### Phone #: ###-#### Inspection requested via web by Dan Flaherty- final ok- card signed
|
Final | 6/24/2019 | 6/24/2019 | 6/24/2019 | A | PART |
Ben Livingston
|
|
|
temp occupacny ok- see R/I notes for issues
|
Rough-in | 6/20/2019 | 6/21/2019 | 6/21/2019 | A | PART |
Brian Scoles
|
|
|
Temp occupancy requested. Greg is the contact. Phone #: ###-#### Inspection requested via web by stan lillquist- needs uv protection on linset on roof and supports installed- condensers on roof need secured to roof curbs- need roofing completed on all pentrations on roof and weather tight- need to seal duct and fire caulk ceiling pentrations in furnace/water heater room northeast corners- went over with Greg onsite- signed temp occupany card
|
Rough-in | 5/14/2019 | 5/15/2019 | 5/15/2019 | A | PASS |
Brian Scoles
|
|
|
Rough in exhaust fans, Greg is your contact Phone #: ###-#### Inspection requested via web by stan lillquist- R/I ok on 5 exhaust fans and outside air- ok to cover all areas- need to look at RTUs and furnaces left to install at final
|
Rough-in | 5/8/2019 | 5/9/2019 | 5/9/2019 | A | PART |
Brian Scoles
|
|
|
contact Greg Phone #: ###-#### Inspection requested via web by stan lillquist- crawl space flex and insulation ok- still need to see exhaust fsns and outside air tied in- will need to look at furnaces and condensers too
|
Rough-in | 4/26/2019 | 4/29/2019 | 4/29/2019 | A | PART |
Brian Scoles
|
|
|
meet Greg at 1130 am- ###-####- R/I on insulation on supply, return air and OSA ok in attic ok to cover- still need to see exhaust fan rough in and insulation in crawl space
|
Rough-in | 4/25/2019 | 4/26/2019 | 4/26/2019 | A | CANC |
Brian Scoles
|
|
|
Contact Greg Phone #: ###-#### Inspection requested via web by stan lillquist- per phone call with Greg i rescheduled for monday 4-29-19 in am
|
Rough-in | 4/18/2019 | 4/18/2019 | 4/18/2019 | P | CANC |
Brian Scoles
|
|
|
ROUGH IN. GREG IS YOUR CONTACT Phone #: ###-#### Inspection requested via web by Kim Adams- did this inspection in am today with Greg
|
Rough-in | 4/18/2019 | 4/18/2019 | 4/18/2019 | A | PART |
Brian Scoles
|
|
|
greg ###-####- Seal on all ducts supply and return, registers and flex ok per my initials on contractors prints
|
Conference | 4/4/2019 | 4/5/2019 | 4/5/2019 | A | DONE |
Brian Scoles
|
|
|
Requesting a site meeting to discuss inspection access for this job. Contact Greg ###-#### Phone #: ###-#### Inspection requested via web by Dan Flaherty- discussed access to ducting in ceiling and floor- contractor will get with engineer and write RFI for information- will work with contractor so work goes as smooth as possible
|