MIS-Aging Inspection | 5/30/2018 | 5/30/2018 | 5/31/2018 | | DONE |
Tony Young
|
|
|
|
DOC - Permit Finaled | 5/31/2018 | 5/31/2018 | 5/31/2018 | P | PASS |
Tony Young
|
|
|
|
ESC-Conference | 2/28/2018 | 3/2/2018 | 3/2/2018 | P | PASS |
Andy J. Long
|
|
|
Tractor moved, log placed across site access as requested. Muddy tracks swept up. No further activity allowed on site without ESC permit. Brown Construction mentioned it should be developed later this year.
|
ESC-Conference | 2/27/2018 | 2/27/2018 | 2/28/2018 | P | PEND |
Andy J. Long
|
|
|
Correction request to Brown Construction to clean up existing trackout, remove equipement, and close entrance to site. Any further work will require an ESC permit.
Matt 208.473.9948
|
ESC-Conference | 11/22/2017 | 11/27/2017 | 11/29/2017 | A | PEND |
Andy J. Long
|
|
|
call SC construction to figure out the deal with the dirt
|
ESC-Conference | 11/21/2017 | 11/21/2017 | 11/22/2017 | P | CANC |
Andy J. Long
|
|
|
rescheduled
|
ESC-Conference | 11/29/2017 | 12/7/2017 | | A | |
Andy J. Long
|
|
|
|