INSP-Final | 4/26/2019 | 4/30/2019 | 4/30/2019 | A | PASS |
Mark Scharfen
|
|
|
Passed sprinkler final. Performed foward flush. Flow activated in 30 seconds.
We would like to perform this inspection in conjunction with fire alarm testing. Please call Rick with time frame. Phone #: ###-#### Inspection requested via web by Jeff Packham
|
DOC - Permit Finaled | | | 4/30/2019 | | DONE |
Mark Scharfen
|
|
|
as per Mark Scharfen-doc final permit-final passed but they can't doc final in the field
|
INSP-Sprinkler Rough-in | 2/28/2019 | 2/28/2019 | 2/28/2019 | P | CANC |
Troy Cobbley
|
|
|
Wrong permit number called in.
|
INSP-Supply line flush | 1/30/2019 | 1/31/2019 | 1/31/2019 | A | PASS |
Troy Cobbley
|
|
|
Underground flush passed
|
INSP-Sprinkler Rough-in/Hydro | 1/17/2019 | 1/18/2019 | 1/18/2019 | A | PASS |
Troy Cobbley
|
|
|
Underground hydro test witnessed
|
INSP-Sprinkler Rough-in | 1/11/2019 | 1/14/2019 | 1/14/2019 | A | PASS |
Troy Cobbley
|
|
|
The underground supply piping is ok for cover.
This is cover inspection for Underground. Please call Troy Nelson with Questions. Phone #: ###-#### Inspection requested via web by Jeff Packham
|