INSP-Final | 4/23/2020 | 4/24/2020 | 4/24/2020 | A | DONE |
Troy Cobbley
|
|
|
Permit finaled. Call Alicia when heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
DOC - Permit Finaled | | | 4/24/2020 | | DONE |
|
|
|
per troy c
|
INSP-Sprinkler Rough-in/Hydro | 9/15/2019 | 9/16/2019 | 9/16/2019 | P | PASS |
Troy Cobbley
|
|
|
**Rough-in, hydro, and tenting passed *MAS**
Overhead rough, hydro and tenting. Phone #: ###-#### >> Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in/Hydro | 9/12/2019 | 9/13/2019 | 9/13/2019 | P | FAIL |
Jim Page
|
|
|
Level 1 T was dry fit, no hydro performed, cover is not approved.
Call Anthony before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in/Hydro | 9/11/2019 | 9/12/2019 | 9/12/2019 | P | FAIL |
Jim Page
|
|
|
Sprinkler head/heads at top of stairs do not extend past wall as shown on approved drawings.
Call Anthony before heading out Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|