INSP-Final | 4/23/2020 | 4/24/2020 | 4/24/2020 | A | DONE |
Troy Cobbley
|
|
|
Permit finaled. Call Alicia when heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
DOC - Permit Finaled | | | 4/24/2020 | | DONE |
|
|
|
|
INSP-Sprinkler Rough-in | 9/15/2019 | 9/16/2019 | 9/16/2019 | P | PASS |
Troy Cobbley
|
|
|
**Tenting passed*MAS**
Tenting only, hydro and rough passed last week. Phone #: ###-#### >> Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in/Hydro | 9/12/2019 | 9/13/2019 | 9/13/2019 | P | PART |
Jim Page
|
|
|
Previously noted items have been corrected. Rough in inspection for overhead fire sprinkler piping complete, sprinkler piping between conditioned spaces approved for cover, not all tenting in place at time of inspection, piping requiring tenting not approved for cover. Hydrostatic test has been witnessed, no pressure loss observed.
Call Anthony before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in/Hydro | 9/11/2019 | 9/12/2019 | 9/12/2019 | P | FAIL |
Jim Page
|
|
|
Sprinkler head/heads at top of stairs do not extend past wall as shown on approved drawings.
Call Anthony before heading out Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|