Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD14-02300
StatusFinaled
Name EKC INC
Site Address 401 W IDAHO ST
Project NameHenriksen Butler
Customer Number 
ePlanReviewYes
Description
(HENRIKSEN BUTLER) This tenant improvement project is for the 1st floor of a office building with a separated basement. The existing basement has and will maintain 2 independent exterior stairways. The tenant in the 2st floor with me a mixed M and B occupancy as they sell and display office furniture as well as have their offices for the business located on the same floor. A new open office area and conference room will be created as well as a new ADA compliant restroom. A deferred submittal for the exterior accessible route will be provided. All interior finish shall meet the requirements of IBC chapter 8. This building is not fire sprinklered. **ajs**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  3/4/2015 DONE
DetailsAdele J Schaffeld-Griffin
Third Notice 2/7/20152/17/2015 DONE
This permit finaled on the web by Cecyle Brock
Second Notice 1/12/20152/2/2015 DONE
First Notice 12/20/20141/2/2015 DONE
Permanent Occupancy  12/10/2014 DONE
BLD-Final12/8/201412/8/201412/8/2014PPASS
DetailsDave Hannah
Mark Phone #: ###-####
BLD-Final11/12/201411/12/201411/13/2014PPART
DetailsDave Hannah
Mark Phone #: ###-#### ok for temp occ need elec to go perm and finish ada rest room
FIRE-Final Inspection11/10/201411/12/201411/12/2014APASS
DetailsForrest France
Life safety inspection passed provided approved style hardware is installed at the south exit door- removed keyed lock deadbolt at this location prior to structural final.
BLD-Conference11/5/201411/5/201411/5/2014PDONE
DetailsDave Hannah
Mark Phone #: ###-####
BLD-Framing/Rough-in9/25/20149/26/20149/26/2014PPASS
DetailsDave Hannah
please call 15 min before for access// mark Phone #: ###-####
BLD-Framing/Rough-in9/25/20149/25/20149/25/2014PCANC
DetailsDave Hannah
Mark Phone #: ###-####-please call 15 minutes prior for access
Override - Parcel Holds  9/17/2014  
Permit Ready to Issue  9/17/2014 DONE
DetailsTisha Gallop
Issue PAID IN FULL permit  9/17/2014 DONE
DetailsChristina Prado
Print Occupancy Form  9/17/2014 DONE
DetailsChristina Prado
Plan assigned to (AJS)8/13/20148/13/20149/15/2014 PASS
DetailsAdele J Schaffeld-Griffin
1st review completed Due 9/9 DowntownLevel 3 TI - ePlanReview - Henriksen Butler
Routing - PLAN CHECK9/15/2014 9/15/2014 PASS
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  9/15/2014 DONE
Routing - PLAN CHECK8/13/2014 9/9/2014 PASS
DetailsAdele J Schaffeld-Griffin
1st review completed  9/9/2014 FAIL
DetailsAdele J Schaffeld-Griffin
Routing - FIRE8/13/20148/13/20148/19/2014 PASS
DetailsScott Arellano
Attached comments to plans.
Routing - Addressing8/13/2014 8/14/2014 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS8/13/2014 8/13/2014 PASS
DetailsBeverly Mountain
Routing - Design Review8/13/2014 8/13/2014 PASS
DetailsSarah Schafer
Sarah Schafer - Exterior entry change Applicant has the zoning certificate in progress for exterior changes to the building. Interior TI is good for approval.
Routing PW Sewer Rating8/13/2014 8/13/2014 PASS
DetailsJennifer Bruner
Pending Assignment by JCB8/13/2014 8/13/2014 DONE
DetailsJason Blais
Intake Approval  8/12/2014 PASS
DetailsJason Blais
Prescreen approved by Tim Woodard and plan review fees paid.
Application received  8/11/2014 DONE
Application submitted via PDS Online on Aug 11 2014 2:34PM