First Notice | 5/12/2015 | 5/12/2015 | 6/10/2015 | | DONE |
Dave Hannah
|
|
|
Mailed out 6-10-15
|
BLD-Final | 5/11/2015 | 5/12/2015 | 5/12/2015 | A | PASS |
Dave Hannah
|
|
|
Tyler Phone #: ###-####
|
DOC - Permit Finaled | 5/12/2015 | 5/12/2015 | 5/12/2015 | P | PASS |
Dave Hannah
|
|
|
|
FIRE-Final Inspection | 5/11/2015 | 5/11/2015 | 5/11/2015 | P | PASS |
Katie Marron
|
|
|
Fire Life Safety pasms. Previous correction items completed satisfactory.
|
FIRE-Final Inspection | 4/17/2015 | 4/20/2015 | 4/20/2015 | A | FAIL |
Katie Marron
|
|
|
Emergency Exits signs not functioning. One exit sign to be relocated on non secure cipher door that leads into storage/warehouse. Three fire Extinguishers need to be hung.
|
BLD-Final | 4/17/2015 | 4/17/2015 | 4/17/2015 | P | NR |
Jim Sly
|
|
|
Tyler Phone #: ###-#### Need fire/life and fire sprinkler finals.
|
Issue PAID IN FULL permit | | | 4/16/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/16/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/13/2015 | | DONE |
|
|
|
need GC-all other requirements have been met-owner is GC and form has been received 4-15-15 so all requirements have been recieved cAN
|
Plan assigned to (CJW) | 4/1/2015 | 4/1/2015 | 4/10/2015 | | PASS |
Carl Westfall
|
|
|
Level 2 TI - ePlanReview - Racking (7 days - April 8)
|
Routing - FIRE | 4/1/2015 | 4/1/2015 | 4/10/2015 | | PASS |
Scott Arellano
|
|
|
Attached comments to plans.
|
1st review completed | | | 4/10/2015 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/10/2015 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 4/1/2015 | | 4/10/2015 | | PASS |
Carl Westfall
|
|
|
|
Pending Assignment by JCB | 4/1/2015 | | 4/1/2015 | | DONE |
Jason Blais
|
|
|
|
Intake Approval | | | 3/31/2015 | | PASS |
Jason Blais
|
|
|
|
Intake Approval | | | 2/17/2015 | | FAIL |
|
|
|
Sent the following email for additional information.
During the prescreen intake review I have found several items missing that are required to be submitted before your project can be taken in for review.
Please, complete and review the following forms. (The forms can be found on the City of Boise website)
• #516 – Commercial Racking/Shelving Submittal Checklist
• #302 – Contractor Registration Declaration
• #306 - Certificate of Value
• #606 – High-Piled Combustible Storage Form
• Please, have a complete fire sprinkler analysis performed by a licensed fire protection contractor.
I also need the following information. Please, respond in writing
• Provide a table of contents drawing. (See #516 checklist for further information)
• Are there any hazardous materials?
• Does the existing racking contain the same commodity as the new racking?
• Provide Code Analysis/Building Data on the front sheet of the drawings. (See #516 checklist for further information)
• Indicate on the drawing if the building has smoke and heat vents. (See #516 checklist for further information)
• Show the fire extinguisher locations on the drawing. (See #516 checklist for further information)
• List any deferred submittal (i.e. fire sprinklers, fire alarms, etc) (See #516 checklist for further information)
• Provide the required note on the drawing in regards to RMI specification. (See #516 checklist for further information. Second item from the bottom on page 3.)
Please, take your time and provide all of the above required information. Your permit cannot be taken in for reviewing until ALL necessary information is provided. Please, feel free to contact me with any question.
Cordially,
Tim Frost, S.E.T.
Fire Sprinkler Plans Examiner
Fire Code Plans Examiner
Fire Inspector
City of Boise
tfrost@cityofboise.org
###-####
|
Application received | | | 2/4/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 4 2015 1:43PM
|