Permit Information
Permit NumberBLD18-01391
StatusFinaled
Name MICRON TECHNOLOGY INC
Site Address 8000 S FEDERAL WAY
Project NameC29427 Micron Site Nitrogen
Customer Number 
ePlanReviewYes
Description
(NITROGEN PLANT) **(PROJECT MANAGEMENT _ RON HILL)** NITROGEN PLANT _The project site is approximately 2 acres and consists of construction of a new Nitrogen manufacturing facility with associated infrastructure.
The Project includes underground utility work including water, power, gas, and storm
sewer lines construction and relocation. Structural fill work, concrete foundation work,
walkway and roadway construction with aggregate base, site landscaping, and stormwater
ditch construction is also anticipated as part of the project. All work per the approved plans. There are no buildings associated with this permit. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/4/20203/5/20203/5/2020APASS
DetailsJim Storey
Nitrogen Plant Phone #: ###-#### Inspection requested via web by Wayne Berry
DOC - Permit Finaled3/5/20203/5/20203/5/2020PPASS
DetailsJim Storey
Print Occupancy Form  3/5/2020 DONE
FIRE-Final Inspection3/3/20203/3/20203/3/2020PPASS
DetailsJim Page
Official letter from a PE has been provided, final life fire safety inspection for scope of work complete.

###-#### is my contact number cell... Per Romeo this should be good to go since we have a stamped certification letter from the project PE. Inspection requested via web by Wayne Berry
FIRE-Final Inspection2/4/20202/5/20202/5/2020AFAIL
DetailsJim Page
Spoke with Ron Johnson with Boise Fire, items noted by Adele on 22MAY2018 have not been completed according to him. Items must be completed before life fire safety can be signed off.

Phone #: ###-#### Inspection requested via web by Wayne Berry
FIRE-Final Inspection2/3/20202/4/20202/4/2020AFAIL
DetailsJim Page
Called point of contact listed at 0945, left message with my contact information and stated that if a return call was not made by 1000 then I was going to proceed to next inspection. Inspection request was left open until 12:30PM with no return call, inspection request will need to be rescheduled.

Life Safety Final Phone #: ###-#### Inspection requested via web by Wayne Berry
BLD-Foundation9/21/20189/24/20189/24/2018PPASS
DetailsJim Storey
Brian Phone #: ###-#### placed w si
BLD-Foundation8/28/20188/29/20188/29/2018APASS
DetailsJim Storey
REBAR- BRIAN Phone #: ###-####
BLD-Foundation8/10/20188/13/20188/13/2018APASS
DetailsJim Storey
Brian Phone #: ###-#### placed w/si
BLD-Foundation8/1/20188/2/20188/2/2018APART
DetailsJim Storey
Brian Phone #: ###-#### placed w/si
BLD-Other7/25/20187/30/20187/30/2018PPART
DetailsJim Storey
slab rebar - Brian Phone #: ###-#### place w/si
BLD-Other7/25/20187/26/20187/26/2018PPASS
DetailsJim Storey
slab rebar - Brian Phone #: ###-####
BLD-Foundation7/18/20187/18/20187/18/2018PPASS
DetailsJim Storey
Brian Phone #: ###-#### top out
BLD-Foundation7/6/20187/9/20187/9/2018APASS
DetailsJim Storey
Brian Phone #: ###-####
BLD-Concrete6/21/20186/21/20186/21/2018PPASS
DetailsJim Storey
column/rebar - brian Phone #: ###-####
BLD-Footing6/20/20186/21/20186/21/2018PPASS
DetailsJim Storey
Brian Phone #: ###-####
BLD-Footing6/13/20186/13/20186/13/2018PPASS
DetailsJim Storey
Brian Phone #: ###-####pending report ok
Fees Due Hold6/6/2018 6/7/2018 DONE
DetailsTisha Gallop
Fees Due Hold6/5/2018 6/5/2018 DONE
DetailsTisha Gallop
OVERRIDE  6/4/2018  
Plan assigned to (CDM)4/27/20184/27/20186/4/2018 PASS
DetailsCarl D Madsen
Micron Nitrogen Plant New due 5/25
Issue & PRINT to be Invoiced  6/4/2018 DONE
Print Occupancy Form  6/4/2018 DONE
Routing - PLAN CHECK6/1/2018 6/4/2018 PASS
DetailsCarl D Madsen
Routing Off Site - STRUCTURAL6/1/2018 6/4/2018 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  6/4/2018 DONE
Permit Ready to Issue  6/4/2018 DONE
Need
RP
Routing - PLAN CHECK5/24/2018 5/30/2018 FAIL
DetailsCarl D Madsen
Pending Structural
Routing Off Site - STRUCTURAL5/24/2018 5/30/2018 FAIL
DetailsCarl D Madsen
Route to Impact Fee Review5/23/20185/26/20185/29/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Routing Off Site - STRUCTURAL4/27/2018 5/23/2018 FAIL
DetailsCarl D Madsen
1st review completed  5/23/2018 DONE
Routing - FIRE4/27/20184/27/20185/22/2018 CANC
DetailsAdele J Schaffeld-Griffin
No items for fire comments at this time, FPE review and approval required prior to testing/operation. Micron to contact Ron Johnson Fire Marshal to arrange expectations of FPE review. Fire will review drawings with deferred submittal items and remainder of drawings that are part of this package.
Routing - PLAN CHECK4/27/2018 5/17/2018 PASS
DetailsCarl D Madsen
Routing PW Environmental4/30/2018 5/4/2018 PASS
DetailsRick Christenson
Routing PW Solid Waste4/30/2018 5/2/2018 PASS
DetailsEvan Carpenter
Routing PW Drainage4/30/2018 5/1/2018 PASS
DetailsBrian Murphy
existing system
Routing - MECHANICAL4/27/2018 5/1/2018 PASS
DetailsTroy James
No mechanical to review
Routing - Erosion and Sediment4/27/2018 5/1/2018 PASS
DetailsMichael Zawacki
Nitrogen plant on Micron campus. SWPPP states that Air Products & Chemicals Inc will have operational controls over the site. Air Product's subs will be responsible for installation amd implementation of BMPs.
Routing - PLANNING4/27/2018 4/30/2018 PASS
DetailsTodd Tucker
Routing - Addressing4/27/2018 4/30/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS4/27/2018 4/30/2018 PASS
DetailsMorgan Webb
Routing - Design Review4/27/2018 4/30/2018 PASS
DetailsSarah Schafer
The design review approval listed on the application is not associated with this project. This project does not require design review approval. It is located on the Micron campus. It meets the height limit of the 45-degree angle from the property line, the project is internal to the site and the use is needed for the running of the business.
Routing - PLUMBING4/27/2018 4/30/2018 PASS
DetailsBill VanDegrift
per plans and ISPC
Routing PW Street Lights4/30/2018 4/30/2018 PASS
DetailsTom Marshall
Routing PW Sewer Design4/30/2018 4/30/2018 PASS
DetailsDeAnn Brown
Intake Approval  4/27/2018 PASS
Application received  4/20/2018 DONE
Application submitted via PDS Online on Apr 20 2018 10:05AM