Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD18-01806
StatusIssued
Name NICK EPLER
Site Address 746 W MAIN ST
Project NameJekyll & Hyde Bagel Co
Customer Number 
ePlanReviewNo
Description
(JEKYLL & HYDE BAGEL CO) Permit is to remodel an existing 1,011 sq. ft. business space with less than 60 lineal feet of work. Approval is contingent upon adhering to the approved plans on file and plan review report. Work to include: removal and replacement of select wall gypsum board, millwork, electrical work, plumbing work and interior finishes in compliance with Ch. 8 of the current IBC. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection7/8/20207/9/20207/9/2020APASS
DetailsTroy Cobbley
Life safety passed.

SCREENED // Nick Phone #: ###-####
FIRE-Final Inspection2/26/20202/27/20202/27/2020AFAIL
DetailsJim Page
Speaker strobes in space are hanging by wires out of box. Provide 2 fire extinguishers with current inspection tags, one for the main level and one for the mezz. No fire sprinkler modifications are required.

Call for access- Nick Phone #: ###-####
Print Occupancy Form  2/26/2020 DONE
Print Occupancy Form  2/26/2020 DONE
BLD-Final8/8/20198/8/20198/8/2019PNR
DetailsDave Hannah
Nick- please call for access door is lock Phone #: ###-####
Issue PAID IN FULL permit  5/31/2018 DONE
Print Occupancy Form  5/31/2018 DONE
Route to Impact Fee Review5/23/20185/26/20185/24/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Telephone call  5/24/2018 DONE
DetailsChristina Prado
Called Nick to advise permit is ready, went over additional requiremetns for issuance
Plan assigned to (JG)5/22/20185/22/20185/23/2018 PASS
DetailsJavier Guzman
Routing - PLAN CHECK5/22/2018 5/23/2018 PASS
DetailsJavier Guzman
1st review completed  5/23/2018 DONE
DetailsJavier Guzman
Case Summary (BLD)  5/23/2018 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  5/23/2018 DONE
Case Summary (BLD)  5/23/2018 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  5/23/2018 DONE
Permit Ready to Issue  5/23/2018 DONE
Need:
GC form
Revised value (if tenant is not GC)
Print Occupancy Form  5/23/2018 DONE
Plans ACCEPTED BY PLAN TECH  5/21/2018 DONE
DetailsTisha Gallop
Intake Approval  5/21/2018 PASS
DetailsJavier Guzman
Recd Pcfee & Taken To Pln CK  5/21/2018 DONE
Application received 5/21/2018