BLD-Blower Door Test Results | 11/20/2019 | 11/20/2019 | 11/20/2019 | P | DONE |
Tell Riley
|
|
|
4.01 ACH 50
|
BLD-Final | 11/19/2019 | 11/20/2019 | 11/20/2019 | A | PASS |
Tell Riley
|
|
|
Gorge Phone #: ###-####//corrections made//
|
DOC - Permit Finaled | 11/20/2019 | 11/20/2019 | 11/20/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD-Final | 11/12/2019 | 11/13/2019 | 11/13/2019 | A | FAIL |
Tell Riley
|
|
|
George Phone #: ###-####//still need fall prevention devices on windows in master bedroom//ACH is still not posted//
|
BLD-Final | 10/21/2019 | 10/22/2019 | 10/22/2019 | A | FAIL |
Tell Riley
|
|
|
George Phone #: ###-####//need blower door test results posted// need child fall prevention devices on two windows in master--under 24" sill height//fix vapor barrier in crawl//
|
BLD-Final | 10/10/2019 | 10/11/2019 | 10/11/2019 | A | FAIL |
Tell Riley
|
|
|
George Phone #: ###-####//still needs mechanical final prior to final inspection//left correction notice with owner onsite//
|
BLD-Final | 9/5/2019 | 9/6/2019 | 9/6/2019 | A | NH |
Tell Riley
|
|
|
Gorge Phone #: ###-####//doors are all locked//no access to house for inspection//
|
BLD-Final | 8/5/2019 | 8/5/2019 | 8/5/2019 | P | NR |
Tell Riley
|
|
|
Charlie Phone #: ###-####//needs plumbing, electrical and mechanical finals//left message with contact and sent text message//
|
BLD-Framing/Rough-in | 6/3/2019 | 6/3/2019 | 6/3/2019 | P | DONE |
Dave Hannah
|
|
|
george Phone #: ###-####
|
BLD-Framing/Rough-in | 5/28/2019 | 5/28/2019 | 5/29/2019 | P | PASS |
Dave Hannah
|
|
|
garage // george Phone #: ###-####
|
BLD-Footing | 3/25/2019 | 3/26/2019 | 3/26/2019 | A | PART |
Jim Sly
|
|
|
Charlie Phone #: ###-#### Garage footing...OK.
|
BLD-Energy code compliance | 2/22/2019 | 2/22/2019 | 2/22/2019 | P | PASS |
Jim Sly
|
|
|
George Phone #: ###-####
|
BLD-Framing/Rough-in | 2/21/2019 | 2/21/2019 | 2/21/2019 | P | PASS |
Jim Sly
|
|
|
George Phone #: ###-####
|
BLD-Framing/Rough-in | 2/4/2019 | 2/4/2019 | 2/4/2019 | P | FAIL |
Jim Sly
|
|
|
George Phone #: ###-#### Need approved plans...... install hold downs per approved plan....insulate all piping...........Do Not Insulate.
|
Plan Modification Accepted | | | 1/7/2019 | | DONE |
|
|
|
New manual j report
|
Routing - MECHANICAL | 1/7/2019 | | 1/7/2019 | | PASS |
Troy James
|
|
|
Resubmitted manual j report
|
BLD-Wall Bracing | 12/26/2018 | 12/27/2018 | 12/27/2018 | A | PASS |
Brandon Shaw
|
|
|
All hold downs to be installed before framing rough-in... Work in progress
|
BLD-Footing | 10/8/2018 | 10/8/2018 | 10/8/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
|
Issue PAID IN FULL permit | | | 10/8/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 10/5/2018 | | |
|
|
|
|
Plan assigned to (RDP) | 7/23/2018 | 7/23/2018 | 10/5/2018 | | DONE |
Rob Patrick
|
|
|
08/15 Failed: 9/13 Failed needs corrections
|
Inspection Record Card- Bld | | | 10/5/2018 | | DONE |
|
|
|
|
Telephone call | | | 10/5/2018 | | DONE |
|
|
|
Spoke with George informing him that this permit is ready and the fee amount due
|
Case Summary (BLD) | | | 10/5/2018 | | DONE |
Rob Patrick
|
|
|
|
Routing - PLAN CHECK | 10/5/2018 | | 10/5/2018 | | PASS |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/5/2018 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 10/5/2018 | | DONE |
|
|
|
met
|
Routing - PLANNING | 10/4/2018 | | 10/4/2018 | | PASS |
Katelyn Menuge
|
|
|
|
Routing - PLANNING | 9/28/2018 | | 9/28/2018 | | FAIL |
Katelyn Menuge
|
|
|
Setbacks incorrect. Front setback should be 11 feet. Rear setback should be 6 feet.
|
Routing - PLAN CHECK | 9/28/2018 | | 9/28/2018 | | FAIL |
Rob Patrick
|
|
|
Bldg Plan Review complete, waiting on Planning to pass.
|
Plan resubmittals received | | | 9/28/2018 | | DONE |
|
|
|
Two copies of A0.0. taken to Rob
|
Plan resubmittals received | | | 9/26/2018 | | DONE |
|
|
|
Resubmittal recieved 2 of each sheet B 1-7-took to Rob P
|
Routing - MECHANICAL | | | 9/14/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLAN CHECK | | | 9/13/2018 | | FAIL |
Rob Patrick
|
|
|
Multiple Corrections required
|
Routing - PLANNING | 9/11/2018 | | 9/11/2018 | | FAIL |
Katelyn Menuge
|
|
|
Floor Area and Site Plan okay. Still need to submit updated elevations. Applicant said he will bring them in.
|
Plan resubmittals received | | | 9/10/2018 | | DONE |
|
|
|
Two sheets of A0.0 taken to rob
|
Routing - PLANNING | 9/6/2018 | | 9/7/2018 | | FAIL |
Katelyn Menuge
|
|
|
Comply with DR approval letter. Emailed applicant 9-7-18. Building cannot complete review as DR requirements will require substantial modifications.
|
Plan resubmittals received | | | 9/6/2018 | | DONE |
|
|
|
Correct set of plans turned in. Sheets 1B, 2B, 3B, 4B, 5B, 6B and 7B taken to Rob
|
Routing - PLAN CHECK | | | 8/15/2018 | | FAIL |
Rob Patrick
|
|
|
Applicant lost paper plans and will re-submit.
|
1st review completed | | | 8/15/2018 | | FAIL |
Rob Patrick
|
|
|
Applicant lost paper plans and will re-submit.
|
Plan assigned to (M_H) | 7/9/2018 | | 7/23/2018 | | DEFR |
Michael Hanson
|
|
|
07/20 sfd L1 Paper
|
Route to Impact Fee Review | 7/9/2018 | 7/12/2018 | 7/10/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PLANNING | 7/9/2018 | | 7/10/2018 | | FAIL |
Katelyn Menuge
|
|
|
Emailed Applicant 7-10-18. Drawings do not match what was approved by Design Review. Submit the drawings approved by DR or submit a new substandard lot application.
|
Routing - Addressing | 7/9/2018 | | 7/9/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 7/9/2018 | | 7/9/2018 | | PASS |
Morgan Webb
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/9/2018 | | |
|
|
|
|
Intake Approval | | | 7/9/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/9/2018 | | DONE |
|
|
|
|
Application received | | 7/9/2018 | | | |
|
|
|
|