Permit Information
Permit NumberBLD18-02428
StatusFinaled
Name WESTMINSTER II
Site Address 4424 W EMERALD ST
Project Name 
Customer Number 
ePlanReviewNo
Description
**PRESCRIPTIVE ENERGY REQUIREMENTS** Permit for the construction of a new 2450 sq. ft., two story (first story 1360 sq. ft., second story 1090 sq. ft.) single family dwelling with 4 bedrooms, 3 bathrooms, approximately 78 sq. ft. of covered patio/porch and a 576 sq. ft. detached garage per the approved plans and any notations. C-2D zoning and setbacks per planning. JJN
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Blower Door Test Results11/20/201911/20/201911/20/2019PDONE
DetailsTell Riley
6.1 ACH 50
BLD-Final11/19/201911/20/201911/20/2019APASS
DetailsTell Riley
Gorge Phone #: ###-####//corrections made//
DOC - Permit Finaled11/20/201911/20/201911/20/2019PPASS
DetailsTell Riley
BLD-Final11/14/201911/15/201911/15/2019PCANC
DetailsTell Riley
Charlie Phone #: ###-####//still needs fireplace final//
BLD-Final11/12/201911/13/201911/13/2019ACANC
DetailsTell Riley
George Phone #: ###-####//spoke with George--still needs mechanical final for the gas fireplace//
BLD-Final10/21/201910/22/201910/22/2019AFAIL
DetailsTell Riley
George Phone #: ###-####//need blower door test results posted//
BLD-Final10/10/201910/11/201910/11/2019AFAIL
DetailsTell Riley
George Phone #: ###-####//still need final for mechanical and gas fireplace prior to final inspection//left correction notice with owner onsite//
BLD-Final9/5/20199/6/20199/6/2019ANH
DetailsTell Riley
Gorge Phone #: ###-####//no access to house//all doors are locked//
BLD-Final8/5/20198/5/20198/5/2019PNR
DetailsTell Riley
Charlie Phone #: ###-####//need plumbing, mechanical, electrical finals//left message with contact and sent text message//
BLD-Framing/Rough-in6/3/20196/3/20196/3/2019PDONE
DetailsDave Hannah
george Phone #: ###-####
BLD-Framing/Rough-in5/28/20195/28/20195/29/2019PPASS
DetailsDave Hannah
garage // george Phone #: ###-####
BLD-Footing3/25/20193/25/20193/25/2019PPASS
DetailsJim Sly
JR Phone #: ###-####
BLD-Footing3/18/20193/18/20193/18/2019PNR
DetailsMike Jordan
JR Phone #: ###-####
BLD-Framing/Rough-in12/26/201812/27/201812/27/2018APASS
DetailsBrandon Shaw
Charley Phone #: ###-####
BLD-Energy code compliance12/21/201812/24/201812/24/2018ANR
DetailsJim Sly
Charlie Phone #: ###-####
Complete stair corrections.
BLD-Framing/Rough-in12/18/201812/19/201812/19/2018APART
DetailsJim Sly
Charlie Phone #: ###-####
C/N Non complying Winder stairs.
Plan Modification Accepted  12/11/2018 DONE
New manual j report
Routing - MECHANICAL12/11/2018 12/11/2018 PASS
DetailsTroy James
Resubmitted manual j report
BLD-Wall Bracing10/9/201810/10/201810/10/2018APASS
DetailsJim Sly
George Phone #: ###-####
BLD-Footing9/14/20189/17/20189/17/2018ANR
DetailsJim Sly
JR Phone #: ###-####
BLD-Footing9/11/20189/13/20189/13/2018PNR
DetailsJim Sly
JR Phone #: ###-####
Issue PAID IN FULL permit  9/11/2018 DONE
Plan assigned to (J_N)7/16/20187/16/20188/29/2018 DONE
DetailsJenny Nelson
07/20 sfd L1 Paper. Sheet A1.1 need to be to scale. 2nd Review completed - update wind speed braced wall plan, braced wall line measurement, 2nd floor window sill height. 1st review completed - structural deficiencies, set back requirement, window fall protection
Routing - MECHANICAL8/29/2018 8/29/2018 PASS
DetailsTroy James
Case Summary (BLD)  8/29/2018 DONE
Details
PLANS/APPL TAKEN TO FRONT DESK  8/29/2018 DONE
Details
Permit Ready to Issue  8/29/2018 DONE
Inspection Record Card- Bld  8/29/2018 DONE
Telephone call  8/29/2018 DONE
Spoke with George to inform him the permit is ready and what fees are due.
Routing - PLAN CHECK7/13/2018 8/29/2018 PASS
DetailsMichael Hanson
Plan resubmittals received  8/23/2018 DONE
two copies of A1.1 stamped and taken to Jenny
Routing - PLANNING8/23/2018 8/23/2018 PASS
DetailsKatelyn Menuge
Plan resubmittals received  8/10/2018 DONE
Two copies of sheets A0.0, A1.0, A1.1, A2.0, E1.0, S1.0, S2.0 taken to Michael
Plan resubmittals received  8/6/2018 DONE
Two copies of sheets A0.0, A1.0, A1.1, A2.0, E1.0, S1.0 and S2.0 Taken to Jenny
1st review completed  7/19/2018 FAIL
DetailsJenny Nelson
structural deficiencies, set backs, code year
Routing - MECHANICAL  7/13/2018 FAIL
DetailsTroy James
Report submitted does not the submitted plans. Talked to designer on the phone.
Route to Impact Fee Review7/9/20187/12/20187/10/2018 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - PLANNING7/9/2018 7/10/2018 FAIL
DetailsKatelyn Menuge
Front Setback to be 11 feet
Rear Setback to be 6 feet
Provide a landscape plan
Provide fencing locations
Provide written approval from Idaho Power
Show eaves in relation to property lines.
Routing - Addressing7/9/2018 7/9/2018 PASS
DetailsDoug Chausow
Parcel and address are correct - but point to the wrong parcel on the drawing, it is parcel A on the drawing, not C
Routing - PUBLIC WORKS7/9/2018 7/9/2018 PASS
DetailsMorgan Webb
Plans ACCEPTED BY PLAN TECH  7/9/2018 DONE
Intake Approval  7/9/2018 PASS
Recd Pcfee & Taken To Pln CK  7/9/2018 DONE
Plan assigned to (M_H)7/9/2018 7/9/2018 DEFR
DetailsMichael Hanson
07/20 sfd L1 Paper
Application received 7/9/2018