BLD-Blower Door Test Results | 11/20/2019 | 11/20/2019 | 11/20/2019 | P | DONE |
Tell Riley
|
|
|
6.1 ACH 50
|
BLD-Final | 11/19/2019 | 11/20/2019 | 11/20/2019 | A | PASS |
Tell Riley
|
|
|
Gorge Phone #: ###-####//corrections made//
|
DOC - Permit Finaled | 11/20/2019 | 11/20/2019 | 11/20/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD-Final | 11/14/2019 | 11/15/2019 | 11/15/2019 | P | CANC |
Tell Riley
|
|
|
Charlie Phone #: ###-####//still needs fireplace final//
|
BLD-Final | 11/12/2019 | 11/13/2019 | 11/13/2019 | A | CANC |
Tell Riley
|
|
|
George Phone #: ###-####//spoke with George--still needs mechanical final for the gas fireplace//
|
BLD-Final | 10/21/2019 | 10/22/2019 | 10/22/2019 | A | FAIL |
Tell Riley
|
|
|
George Phone #: ###-####//need blower door test results posted//
|
BLD-Final | 10/10/2019 | 10/11/2019 | 10/11/2019 | A | FAIL |
Tell Riley
|
|
|
George Phone #: ###-####//still need final for mechanical and gas fireplace prior to final inspection//left correction notice with owner onsite//
|
BLD-Final | 9/5/2019 | 9/6/2019 | 9/6/2019 | A | NH |
Tell Riley
|
|
|
Gorge Phone #: ###-####//no access to house//all doors are locked//
|
BLD-Final | 8/5/2019 | 8/5/2019 | 8/5/2019 | P | NR |
Tell Riley
|
|
|
Charlie Phone #: ###-####//need plumbing, mechanical, electrical finals//left message with contact and sent text message//
|
BLD-Framing/Rough-in | 6/3/2019 | 6/3/2019 | 6/3/2019 | P | DONE |
Dave Hannah
|
|
|
george Phone #: ###-####
|
BLD-Framing/Rough-in | 5/28/2019 | 5/28/2019 | 5/29/2019 | P | PASS |
Dave Hannah
|
|
|
garage // george Phone #: ###-####
|
BLD-Footing | 3/25/2019 | 3/25/2019 | 3/25/2019 | P | PASS |
Jim Sly
|
|
|
JR Phone #: ###-####
|
BLD-Footing | 3/18/2019 | 3/18/2019 | 3/18/2019 | P | NR |
Mike Jordan
|
|
|
JR Phone #: ###-####
|
BLD-Framing/Rough-in | 12/26/2018 | 12/27/2018 | 12/27/2018 | A | PASS |
Brandon Shaw
|
|
|
Charley Phone #: ###-####
|
BLD-Energy code compliance | 12/21/2018 | 12/24/2018 | 12/24/2018 | A | NR |
Jim Sly
|
|
|
Charlie Phone #: ###-#### Complete stair corrections.
|
BLD-Framing/Rough-in | 12/18/2018 | 12/19/2018 | 12/19/2018 | A | PART |
Jim Sly
|
|
|
Charlie Phone #: ###-#### C/N Non complying Winder stairs.
|
Plan Modification Accepted | | | 12/11/2018 | | DONE |
|
|
|
New manual j report
|
Routing - MECHANICAL | 12/11/2018 | | 12/11/2018 | | PASS |
Troy James
|
|
|
Resubmitted manual j report
|
BLD-Wall Bracing | 10/9/2018 | 10/10/2018 | 10/10/2018 | A | PASS |
Jim Sly
|
|
|
George Phone #: ###-####
|
BLD-Footing | 9/14/2018 | 9/17/2018 | 9/17/2018 | A | NR |
Jim Sly
|
|
|
JR Phone #: ###-####
|
BLD-Footing | 9/11/2018 | 9/13/2018 | 9/13/2018 | P | NR |
Jim Sly
|
|
|
JR Phone #: ###-####
|
Issue PAID IN FULL permit | | | 9/11/2018 | | DONE |
|
|
|
|
Plan assigned to (J_N) | 7/16/2018 | 7/16/2018 | 8/29/2018 | | DONE |
Jenny Nelson
|
|
|
07/20 sfd L1 Paper. Sheet A1.1 need to be to scale. 2nd Review completed - update wind speed braced wall plan, braced wall line measurement, 2nd floor window sill height. 1st review completed - structural deficiencies, set back requirement, window fall protection
|
Routing - MECHANICAL | 8/29/2018 | | 8/29/2018 | | PASS |
Troy James
|
|
|
|
Case Summary (BLD) | | | 8/29/2018 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/29/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/29/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/29/2018 | | DONE |
|
|
|
|
Telephone call | | | 8/29/2018 | | DONE |
|
|
|
Spoke with George to inform him the permit is ready and what fees are due.
|
Routing - PLAN CHECK | 7/13/2018 | | 8/29/2018 | | PASS |
Michael Hanson
|
|
|
|
Plan resubmittals received | | | 8/23/2018 | | DONE |
|
|
|
two copies of A1.1 stamped and taken to Jenny
|
Routing - PLANNING | 8/23/2018 | | 8/23/2018 | | PASS |
Katelyn Menuge
|
|
|
|
Plan resubmittals received | | | 8/10/2018 | | DONE |
|
|
|
Two copies of sheets A0.0, A1.0, A1.1, A2.0, E1.0, S1.0, S2.0 taken to Michael
|
Plan resubmittals received | | | 8/6/2018 | | DONE |
|
|
|
Two copies of sheets A0.0, A1.0, A1.1, A2.0, E1.0, S1.0 and S2.0 Taken to Jenny
|
1st review completed | | | 7/19/2018 | | FAIL |
Jenny Nelson
|
|
|
structural deficiencies, set backs, code year
|
Routing - MECHANICAL | | | 7/13/2018 | | FAIL |
Troy James
|
|
|
Report submitted does not the submitted plans. Talked to designer on the phone.
|
Route to Impact Fee Review | 7/9/2018 | 7/12/2018 | 7/10/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PLANNING | 7/9/2018 | | 7/10/2018 | | FAIL |
Katelyn Menuge
|
|
|
Front Setback to be 11 feet
Rear Setback to be 6 feet
Provide a landscape plan
Provide fencing locations
Provide written approval from Idaho Power
Show eaves in relation to property lines.
|
Routing - Addressing | 7/9/2018 | | 7/9/2018 | | PASS |
Doug Chausow
|
|
|
Parcel and address are correct - but point to the wrong parcel on the drawing, it is parcel A on the drawing, not C
|
Routing - PUBLIC WORKS | 7/9/2018 | | 7/9/2018 | | PASS |
Morgan Webb
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/9/2018 | | DONE |
|
|
|
|
Intake Approval | | | 7/9/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/9/2018 | | DONE |
|
|
|
|
Plan assigned to (M_H) | 7/9/2018 | | 7/9/2018 | | DEFR |
Michael Hanson
|
|
|
07/20 sfd L1 Paper
|
Application received | | 7/9/2018 | | | |
|
|
|
|