BLD-Energy code compliance | 7/2/2020 | 7/6/2020 | 7/6/2020 | A | PASS |
Mike Jordan
|
|
|
Katherine Phone #: ###-####
|
BLD-Framing/Rough-in | 7/2/2020 | 7/2/2020 | 7/2/2020 | P | PASS |
Mike Jordan
|
|
|
Kathlan *screened* Phone #: ###-####. Ok to insulate.
|
BLD-Framing/Rough-in | 7/1/2020 | 7/1/2020 | 7/1/2020 | P | NH |
Mike Jordan
|
|
|
Denise *screened* Phone #: ###-####. No one home, no access. Will need to reschedule.
|
BLD-Framing/Rough-in | 6/29/2020 | 6/30/2020 | 6/30/2020 | A | PASS |
Mike Jordan
|
|
|
screened // Mary Phone #: ###-####. New beam ok.
|
CHANGE STATUS TO (ISS) | | | 6/24/2020 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 6/11/2020 | 6/11/2020 | 6/23/2020 | | PASS |
Josh Bogle
|
|
|
Plan Mod - Paper to ePlan
|
Routing - PLAN CHECK | 6/12/2020 | | 6/23/2020 | | PASS |
Josh Bogle
|
|
|
1hour plan mod fee
|
Permit Ready to Issue | | | 6/23/2020 | | DONE |
|
|
|
PLAN MOD
|
Plan Modification Accepted | | | 6/11/2020 | | DONE |
|
|
|
Plan Mod to remove the wall between the addition and existing structure.
Paper to ePlan - Route to JAB, no planning needed as interior wall is only change
|
BLD-Framing/Rough-in | 6/8/2020 | 6/9/2020 | 6/9/2020 | A | CANC |
Mike Jordan
|
|
|
Mary Phone #: ###-####
|
BLD-Wall Bracing | 6/9/2020 | 6/9/2020 | 6/9/2020 | A | PASS |
Mike Jordan
|
|
|
Mary Phone #: ###-####
|
BLD-Foundation | 4/9/2020 | 4/9/2020 | 4/9/2020 | P | PASS |
Mike Jordan
|
|
|
Robert *left voicemail, patio being enclosed** Phone #: ###-####. Verified existing foundation systen, installation of rigid insulation, floor framing and vapor barrier on top of slab. Also R30 insulation in floor. Ok to place floor decking and construct walls. inspection done on line via google duo.
|
BLD-Foundation | 3/26/2020 | 4/2/2020 | 4/2/2020 | A | NR |
Dave Hannah
|
|
|
robert Phone #: ###-####
|
BLD-Conference | 1/10/2020 | 1/13/2020 | 1/13/2020 | A | DONE |
Mike Jordan
|
|
|
Robert Phone #: ###-####
|
Routing Walk-In (BLD) | 1/10/2020 | 1/10/2020 | 1/10/2020 | P | PASS |
Josh Bogle
|
|
|
|
BLD - Request for Extension | 1/11/2019 | 1/17/2019 | 1/17/2019 | A | PASS |
Mike Jordan
|
|
|
Bob Phone #: ###-####
|
BLD-Conference | 11/15/2018 | 11/15/2018 | 11/15/2018 | P | DONE |
Mike Jordan
|
|
|
call 30 mins ahead for access-Mark Phone #: ###-####. Noted new footings not to frost depth.
|
Routing Walk-In (BLD) | 8/3/2018 | 8/3/2018 | 8/3/2018 | P | PASS |
Michael Hanson
|
|
|
|
1st review completed | | | 8/3/2018 | | DONE |
Michael Hanson
|
|
|
|
Routing - PLAN CHECK | 8/3/2018 | | 8/3/2018 | | PASS |
Michael Hanson
|
|
|
|
Inspection Record Card- Bld | | | 8/3/2018 | | DONE |
Michael Hanson
|
|
|
|
Case Summary (BLD) | | | 8/3/2018 | | DONE |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/3/2018 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 8/3/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 8/3/2018 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 7/23/2018 | 7/23/2018 | 7/23/2018 | P | PASS |
Jeff Lowe
|
|
|
|
Routing Walk-In (BLD) | 7/23/2018 | 7/23/2018 | 7/23/2018 | P | FAIL |
Rob Patrick
|
|
|
Needs to provide more detail.
|
Application received | | 7/23/2018 | | | |
|
|
|
|