Permit Information
Permit NumberBLD18-03767
StatusIssued
Name ST LUKES HEALTH SYSTEM LTD
Site Address 2619 W FAIRVIEW AVE
Project NameSt. Lukes Parking Garage
Customer Number 
ePlanReviewYes
Description
(ST. LUKES PARKING GARAGE) **PROJECT MANAGEMENT - Angie Brosious** Permit for the construction of a 170,050 sq. ft., 5 tier parking garage to be type IB (noncombustible) construction with garage construction, general site grading, and utilities per the approved plans, engineering, and any notations. The primary structural frame, interior bearing/non-bearing walls and floor/ceiling assembly are required to have a 2-hour fire resistance rating and the roof/ceiling assembly are required to have a 1-hour fire resistance rating. Only non-combustible construction is permitted with this construction type, except for materials allowed in IBC section 603. This parking garage will serve the medical office building on hospital located on the parcel under permit: BLD17-04285 and BLD18-01027. This building is not fire sprinklered. Special inspections required per attached Form 310 and includes: steel fabrication, structural steel, concrete construction, masonry construction, soils, and intumescent coatings. **JHB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Foundation7/30/20207/30/20207/31/2020PPEND
DetailsDave Hannah
SCREENED Rebar // Keith Phone #: ###-#### ok after spec inspection siign off
BLD-Concrete7/15/20207/15/20207/15/2020PPASS
DetailsMike Jordan
screened // Keith Phone #: ###-####. Exterior slab on grade for main ramp from ground level to 1st. level elvated slab.
BLD-Foundation6/24/20206/25/20206/25/2020APASS
DetailsMike Jordan
rebar // Rocky ... could not answer about anyone being out of state in last 14 days Phone #: ###-####. exterior slab on grade.
BLD-Other6/9/20206/10/20206/10/2020ADONE
DetailsDave Hannah
Screened-slab on grade inspection- Rocky Phone #: ###-####
BLD-Concrete5/28/20205/29/20205/29/2020APEND
DetailsMike Jordan
rebar wall- Rocky *screened* Phone #: ###-####. Ok pendind special inspection.
BLD-Footing5/7/20205/7/20205/11/2020PPEND
DetailsDave Hannah
Screened- rebar inspection- Rockie Phone #: ###-#### ok after spec inspection sign offs
BLD-Footing4/22/20204/23/20204/23/2020APART
DetailsMike Jordan
Screened- rebar inspections-Rocky Phone #: ###-####. 1st level columns and elevator pit walls, work in progress. Ok to place concrete pending special inspection. Areas inspected marked on city approved plans.
BLD-Footing4/15/20204/16/20204/16/2020PPART
DetailsDave Hannah
Rocky - Screened for COVID 19 symptoms Phone #: ###-####
BLD-Footing4/7/20204/8/20204/8/2020PPASS
DetailsMike Jordan
*screened* - rebar / stem bar / spread footing - Rocky Phone #: ###-####. Footings and column pad footings on grid C between grids 1 to 15.
BLD-Concrete4/1/20204/2/20204/6/2020ADONE
DetailsDave Hannah
rebar for mechanical pad - Rocky Phone #: ###-####
BLD-Aging Inspection2/19/20202/19/20202/19/2020 PASS
DetailsDave Hannah
Print Occupancy Form  4/5/2019 DONE
Issue PAID IN FULL permit  4/5/2019 DONE
Meeting  4/1/2019 DONE
sent email to curtis informing him that this permit is going to expire in 10 days and is welcome to send in a request for an extension.
Expiration Notice3/14/20194/4/20193/14/2019 DONE
DetailsBrittany Hill
Plan assigned to (JHB)10/25/201810/25/20181/15/2019 PASS
DetailsJoe Bruce
*(3rd Rev Comp) 11/26 (502) - St Luke's Parking Garage (Bldg, Fire, Struc)
Routing - PLAN CHECK1/11/2019 1/15/2019 PASS
DetailsJoe Bruce
PLANS/APPL TAKEN TO FRONT DESK  1/15/2019 DONE
Permit Ready to Issue  1/15/2019 DONE
MET
NEED
ACHD

MET
GC FORM
REVISED VALUE
Plan resubmittals received  1/11/2019 DONE
DetailsJoe Bruce
Routing - FIRE12/19/201812/19/20181/4/2019 PASS
DetailsErika Akin
Attached comments to case
Plan resubmittals requested  1/4/2019 DONE
DetailsJoe Bruce
Routing Off Site - STRUCTURAL12/19/2018 12/27/2018 PASS
DetailsJoe Bruce
Stapley - Spoke with Chris on the phone regarding approval. **JHB**
Routing - PLAN CHECK12/19/2018 12/26/2018 FAIL
DetailsJoe Bruce
Emailed Plan Review report to Architect. **JHB**
Routing - Design Review12/19/2018 12/20/2018 PASS
DetailsAndrea Tuning
Plan resubmittals received  12/19/2018 DONE
DetailsJoe Bruce
Route to Impact Fee Review12/5/201812/8/201812/6/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Routing - FIRE10/25/201810/25/201812/5/2018 FAIL
DetailsErika Akin
Attached comments to case and emailed architect
1st review completed  12/5/2018 FAIL
DetailsJoe Bruce
Plan resubmittals requested  12/5/2018 DONE
DetailsJoe Bruce
Sent ePlan task back to applicant for resubmittal. **JHB**
Routing - PLAN CHECK10/25/2018 11/21/2018 FAIL
DetailsJoe Bruce
Routing - Addressing10/25/2018 11/20/2018 PASS
DetailsDoug Chausow
Routing Off Site - STRUCTURAL10/25/2018 11/8/2018 FAIL
DetailsJoe Bruce
Stapley
Routing - Erosion and Sediment10/25/2018 11/5/2018 PASS
DetailsAndy J. Long
No review required. SWPPP reviewed and approved under ESC17-01632
Routing PW Drainage10/25/2018 11/2/2018 PASS
DetailsBrian Murphy
Routing - PLANNING10/25/2018 10/29/2018 PASS
DetailsCody Riddle
Conditions/requirements of CUP17-00057 met. As noted in DR review, final design does not match approved DR approval.
Routing - Design Review10/25/2018 10/26/2018 FAIL
DetailsAndrea Tuning
The site and elevations are substantially different from the approved drawings. The applicant should obtain an administrative Design Review Modification for the new design.

Called Scott with Hummel and left a message.
Routing PW Street Lights10/25/2018 10/26/2018 PASS
DetailsTom Marshall
Routing PW Sewer Design10/25/2018 10/26/2018 PASS
DetailsDeAnn Brown
Sewer connections detailed in another grading permit or building permit associated.
Routing PW Solid Waste10/25/2018 10/25/2018 PASS
DetailsEvan Carpenter
Routing - PUBLIC WORKS10/25/2018 10/25/2018 PASS
DetailsMorgan Webb
Intake Approval  10/23/2018 PASS
Application received  10/12/2018 DONE
Application submitted via PDS Online on Oct 12 2018 12:58PM