BLD-Foundation | 7/30/2020 | 7/30/2020 | 7/31/2020 | P | PEND |
Dave Hannah
|
|
|
SCREENED Rebar // Keith Phone #: ###-#### ok after spec inspection siign off
|
BLD-Concrete | 7/15/2020 | 7/15/2020 | 7/15/2020 | P | PASS |
Mike Jordan
|
|
|
screened // Keith Phone #: ###-####. Exterior slab on grade for main ramp from ground level to 1st. level elvated slab.
|
BLD-Foundation | 6/24/2020 | 6/25/2020 | 6/25/2020 | A | PASS |
Mike Jordan
|
|
|
rebar // Rocky ... could not answer about anyone being out of state in last 14 days Phone #: ###-####. exterior slab on grade.
|
BLD-Other | 6/9/2020 | 6/10/2020 | 6/10/2020 | A | DONE |
Dave Hannah
|
|
|
Screened-slab on grade inspection- Rocky Phone #: ###-####
|
BLD-Concrete | 5/28/2020 | 5/29/2020 | 5/29/2020 | A | PEND |
Mike Jordan
|
|
|
rebar wall- Rocky *screened* Phone #: ###-####. Ok pendind special inspection.
|
BLD-Footing | 5/7/2020 | 5/7/2020 | 5/11/2020 | P | PEND |
Dave Hannah
|
|
|
Screened- rebar inspection- Rockie Phone #: ###-#### ok after spec inspection sign offs
|
BLD-Footing | 4/22/2020 | 4/23/2020 | 4/23/2020 | A | PART |
Mike Jordan
|
|
|
Screened- rebar inspections-Rocky Phone #: ###-####. 1st level columns and elevator pit walls, work in progress. Ok to place concrete pending special inspection. Areas inspected marked on city approved plans.
|
BLD-Footing | 4/15/2020 | 4/16/2020 | 4/16/2020 | P | PART |
Dave Hannah
|
|
|
Rocky - Screened for COVID 19 symptoms Phone #: ###-####
|
BLD-Footing | 4/7/2020 | 4/8/2020 | 4/8/2020 | P | PASS |
Mike Jordan
|
|
|
*screened* - rebar / stem bar / spread footing - Rocky Phone #: ###-####. Footings and column pad footings on grid C between grids 1 to 15.
|
BLD-Concrete | 4/1/2020 | 4/2/2020 | 4/6/2020 | A | DONE |
Dave Hannah
|
|
|
rebar for mechanical pad - Rocky Phone #: ###-####
|
BLD-Aging Inspection | 2/19/2020 | 2/19/2020 | 2/19/2020 | | PASS |
Dave Hannah
|
|
|
|
Print Occupancy Form | | | 4/5/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 4/5/2019 | | DONE |
|
|
|
|
Meeting | | | 4/1/2019 | | DONE |
|
|
|
sent email to curtis informing him that this permit is going to expire in 10 days and is welcome to send in a request for an extension.
|
Expiration Notice | 3/14/2019 | 4/4/2019 | 3/14/2019 | | DONE |
Brittany Hill
|
|
|
|
Plan assigned to (JHB) | 10/25/2018 | 10/25/2018 | 1/15/2019 | | PASS |
Joe Bruce
|
|
|
*(3rd Rev Comp) 11/26 (502) - St Luke's Parking Garage (Bldg, Fire, Struc)
|
Routing - PLAN CHECK | 1/11/2019 | | 1/15/2019 | | PASS |
Joe Bruce
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/15/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/15/2019 | | DONE |
|
|
|
MET
NEED
ACHD
MET
GC FORM
REVISED VALUE
|
Plan resubmittals received | | | 1/11/2019 | | DONE |
Joe Bruce
|
|
|
|
Routing - FIRE | 12/19/2018 | 12/19/2018 | 1/4/2019 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Plan resubmittals requested | | | 1/4/2019 | | DONE |
Joe Bruce
|
|
|
|
Routing Off Site - STRUCTURAL | 12/19/2018 | | 12/27/2018 | | PASS |
Joe Bruce
|
|
|
Stapley - Spoke with Chris on the phone regarding approval. **JHB**
|
Routing - PLAN CHECK | 12/19/2018 | | 12/26/2018 | | FAIL |
Joe Bruce
|
|
|
Emailed Plan Review report to Architect. **JHB**
|
Routing - Design Review | 12/19/2018 | | 12/20/2018 | | PASS |
Andrea Tuning
|
|
|
|
Plan resubmittals received | | | 12/19/2018 | | DONE |
Joe Bruce
|
|
|
|
Route to Impact Fee Review | 12/5/2018 | 12/8/2018 | 12/6/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | 10/25/2018 | 10/25/2018 | 12/5/2018 | | FAIL |
Erika Akin
|
|
|
Attached comments to case and emailed architect
|
1st review completed | | | 12/5/2018 | | FAIL |
Joe Bruce
|
|
|
|
Plan resubmittals requested | | | 12/5/2018 | | DONE |
Joe Bruce
|
|
|
Sent ePlan task back to applicant for resubmittal. **JHB**
|
Routing - PLAN CHECK | 10/25/2018 | | 11/21/2018 | | FAIL |
Joe Bruce
|
|
|
|
Routing - Addressing | 10/25/2018 | | 11/20/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing Off Site - STRUCTURAL | 10/25/2018 | | 11/8/2018 | | FAIL |
Joe Bruce
|
|
|
Stapley
|
Routing - Erosion and Sediment | 10/25/2018 | | 11/5/2018 | | PASS |
Andy J. Long
|
|
|
No review required. SWPPP reviewed and approved under ESC17-01632
|
Routing PW Drainage | 10/25/2018 | | 11/2/2018 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLANNING | 10/25/2018 | | 10/29/2018 | | PASS |
Cody Riddle
|
|
|
Conditions/requirements of CUP17-00057 met. As noted in DR review, final design does not match approved DR approval.
|
Routing - Design Review | 10/25/2018 | | 10/26/2018 | | FAIL |
Andrea Tuning
|
|
|
The site and elevations are substantially different from the approved drawings. The applicant should obtain an administrative Design Review Modification for the new design.
Called Scott with Hummel and left a message.
|
Routing PW Street Lights | 10/25/2018 | | 10/26/2018 | | PASS |
Tom Marshall
|
|
|
|
Routing PW Sewer Design | 10/25/2018 | | 10/26/2018 | | PASS |
DeAnn Brown
|
|
|
Sewer connections detailed in another grading permit or building permit associated.
|
Routing PW Solid Waste | 10/25/2018 | | 10/25/2018 | | PASS |
Evan Carpenter
|
|
|
|
Routing - PUBLIC WORKS | 10/25/2018 | | 10/25/2018 | | PASS |
Morgan Webb
|
|
|
|
Intake Approval | | | 10/23/2018 | | PASS |
|
|
|
|
Application received | | | 10/12/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 12 2018 12:58PM
|