Second Notice | | 7/19/2020 | 7/28/2020 | | DONE |
|
|
|
This permit finaled on the web by Caloub Huttash
|
First Notice | 5/11/2020 | 5/11/2020 | 7/9/2020 | | DONE |
Mike Jordan
|
|
|
mailed 7-9-2020
|
BLD-Final | 5/11/2020 | 5/11/2020 | 5/11/2020 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Jared Waggoner
|
DOC - Permit Finaled | 5/11/2020 | 5/11/2020 | 5/11/2020 | P | PASS |
Mike Jordan
|
|
|
|
Zoning Approval | 5/11/2020 | 5/11/2020 | 5/11/2020 | | PASS |
Katelyn Menuge
|
|
|
|
BLD-Conference | 5/6/2020 | 5/6/2020 | 5/6/2020 | P | DONE |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Jared Waggoner
|
BLD-Final | 5/4/2020 | 5/4/2020 | 5/4/2020 | P | NR |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Jared Waggoner
|
FIRE-Final Inspection | 5/4/2020 | 5/4/2020 | 5/4/2020 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed.
screeened // Jerrod Phone #: ###-####
|
FIRE-Final Inspection | 4/29/2020 | 4/30/2020 | 4/30/2020 | P | FAIL |
Troy Cobbley
|
|
|
Permit can be finaled when the project related fire alarm permit and the Grading permit have been finaled. Jared Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 3/25/2020 | 3/26/2020 | 3/26/2020 | P | PASS |
Mike Jordan
|
|
|
2nd floor 3 west offices ceilings for cover Phone #: ###-#### Inspection requested via web by Jared Waggoner
|
BLD-Ceiling Grid Inspection | 3/20/2020 | 3/20/2020 | 3/20/2020 | P | PART |
Mike Jordan
|
|
|
2nd floor ceiling grid for cover Phone #: ###-#### Inspection requested via web by Jared Waggoner. Grid ok pending electrical and mech. rough in inspection.
|
BLD-Ceiling Grid Inspection | 3/16/2020 | 3/17/2020 | 3/17/2020 | P | PASS |
Mike Jordan
|
|
|
First floor ceiling grid Phone #: ###-#### Inspection requested via web by Jared Waggoner
|
BLD-Framing/Rough-in | 3/4/2020 | 3/4/2020 | 3/4/2020 | P | PASS |
Mike Jordan
|
|
|
2nd floor cloud ceiling framing for cover Phone #: ###-#### Inspection requested via web by Jared Waggoner
|
BLD-Wall Bracing | 2/17/2020 | 2/18/2020 | 2/18/2020 | A | FAIL |
Mike Jordan
|
|
|
1st floor west exterior interior shear Phone #: ###-#### Inspection requested via web by Jared Waggoner. Engineer of record to provide alternate attachment details for areas that are inaccessable to provide attachments.
|
BLD-Framing/Rough-in | 2/12/2020 | 2/13/2020 | 2/13/2020 | A | PASS |
Mike Jordan
|
|
|
First floor suspended GWB ceiling and 2 exterior canopies for cover Phone #: ###-#### Inspection requested via web by Jared Waggoner
|
BLD-Wall Bracing | 2/10/2020 | 2/11/2020 | 2/11/2020 | A | PASS |
Mike Jordan
|
|
|
2nd floor east interior shear wall for cover. Phone #: ###-#### Inspection requested via web by Jared Waggoner
|
BLD-Energy code compliance | 2/10/2020 | 2/10/2020 | 2/10/2020 | A | PASS |
Mike Jordan
|
|
|
2nd floor E/W/S exterior wall insulation Phone #: ###-#### Inspection requested via web by Jared Waggoner. Remainder of 2nd floor exterior walls ok.
|
BLD-Energy code compliance | 2/7/2020 | 2/7/2020 | 2/7/2020 | P | PASS |
Mike Jordan
|
|
|
Foreman Phone #: ###-####. North exterior wall only ok.
|
Override - Parcel Holds | 2/7/2020 | 1/1/1900 | 2/7/2020 | | |
|
|
|
Per Bob A. Override
|
BLD-Framing/Rough-in | 2/6/2020 | 2/6/2020 | 2/6/2020 | P | PASS |
Mike Jordan
|
|
|
2nd floor walls and ceilings for cover Phone #: ###-#### Inspection requested via web by Jared Waggoner
|
BLD-Framing/Rough-in | 2/3/2020 | 2/3/2020 | 2/3/2020 | P | PART |
Tony Young
|
|
|
Framing inspection for 1 side cover at 2nd floor interior walls. Phone #: ###-#### Inspection requested via web by Jared Waggoner,, interior wall ok to cover one side from 10 foot up to deck pending trades
|
BLD-Energy code compliance | 1/23/2020 | 1/24/2020 | 1/24/2020 | A | PASS |
Jim Storey
|
|
|
First Floor wall insulation Phone #: ###-#### Inspection requested via web by Jared Waggoner
|
BLD-Framing/Rough-in | 1/22/2020 | 1/22/2020 | 1/22/2020 | P | PASS |
Mike Jordan
|
|
|
First floor rough framing for cover Phone #: ###-#### Inspection requested via web by Jared Waggoner. 1st floor interior steel stud walls ok. Hardlids ok pending mech. rough in inspection.
|
BLD-Wall Bracing | 1/13/2020 | 1/13/2020 | 1/13/2020 | P | PASS |
Mike Jordan
|
|
|
90% partial exterior sheet metal shear inspection Phone #: ###-#### Inspection requested via web by Jared Waggoner
|
BLD-Framing/Rough-in | 12/30/2019 | 12/30/2019 | 12/30/2019 | P | PASS |
Mike Jordan
|
|
|
Above roof deck wall framing for cover. Phone #: ###-#### Inspection requested via web by Jared Waggoner. Parapet framing on roof deck at east and west stair towers and pedestal framing for HVAC equipment.
|
CHANGE STATUS TO (ISS) | | | 12/20/2019 | | DONE |
|
|
|
Plan mod is for other permit BLD18-04369
|
BLD-Concrete | 11/14/2019 | 11/15/2019 | 11/15/2019 | A | PART |
Mike Jordan
|
|
|
2nd floor slab on deck reinforcement Phone #: ###-#### Inspection requested via web by Jared Waggoner. 2nd. floor slab on deck. work in progress. Needs to install perimeter #4 bar and splice 15ft. at re-enterant corners. Special inspection to verify.
|
BLD-Other | 11/4/2019 | 11/4/2019 | 11/4/2019 | P | DEFR |
Mike Jordan
|
|
|
8" CMU grout at east patio walls 12''-16'' at 2:30 pm, will have special inspection Phone #: ###-#### Inspection requested via web by Jared Waggoner
|
BLD-Other | 10/31/2019 | 11/1/2019 | 11/1/2019 | P | PEND |
Mike Jordan
|
|
|
CMU grout from 8''-12'' at 1pm, will have special inspection Phone #: ###-#### Inspection requested via web by Jared Waggoner. Pending special inspection.
|
BLD-Other | 10/30/2019 | 10/31/2019 | 10/31/2019 | P | PART |
Mike Jordan
|
|
|
4''-8'' CMU grout at 3pm, will have special inspection Phone #: ###-#### Inspection requested via web by Jared Waggoner. 4ft. to 8ft. elevation for CMU wall at patio.4ft. to 8ft. elevation for CMU wall at patio.
|
BLD-Other | 10/30/2019 | 10/31/2019 | 10/31/2019 | A | DEFR |
Mike Jordan
|
|
|
0''-4'' CMU grout at 10am, will have special inspection Phone #: ###-#### Inspection requested via web by Jared Waggoner
|
Inspection Record Card- Bld | | | 10/21/2019 | | DONE |
|
|
|
|
BLD-Concrete | 10/16/2019 | 10/17/2019 | 10/17/2019 | P | PASS |
Mike Jordan
|
|
|
Slab on Grade Reinforcement Phone #: ###-#### Inspection requested via web by Jared Waggoner
|
BLD-Foundation | 9/27/2019 | 9/27/2019 | 9/27/2019 | P | PASS |
Brandon Shaw
|
|
|
Ok to place concrete pending special inspection.
|
BLD-Footing | 9/18/2019 | 9/18/2019 | 9/18/2019 | P | PART |
Mike Jordan
|
|
|
Call 30 minutes ahead // Jerrod Phone #: ###-####. Perimeter footings, column pad footings, interior footings and elevator and trash enclosure footings. Noted clearance issues in some areas. Special inspection agency to verify clearane issues have been repaired prior to conc. placement. Ok to place concrete pending special inspection.
|
Permit Ready to Issue | | | 9/18/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/18/2019 | | DONE |
|
|
|
|
Plan assigned to (JAR) | 8/13/2019 | 8/13/2019 | 9/17/2019 | | DONE |
Julie Romig
|
|
|
1st Rev Comp - 4th Comp - Amherst Madison Shell/Core
|
Permit Ready to Issue | | | 9/17/2019 | | DONE |
|
|
|
met but please do not issue without BLD18-04369
|
Routing - PLAN CHECK | 9/10/2019 | | 9/17/2019 | | PASS |
Julie Romig
|
|
|
|
Routing - PLUMBING | 9/11/2019 | | 9/11/2019 | | PASS |
Dan Ediger
|
|
|
per plans and ISPC
|
Routing - PLAN CHECK | 8/22/2019 | | 9/9/2019 | | FAIL |
Julie Romig
|
|
|
4th Review
|
Routing Off Site - STRUCTURAL | 8/22/2019 | | 9/4/2019 | | PASS |
Julie Romig
|
|
|
AHJ - 3rd Review
|
Routing - PUBLIC WORKS | 8/22/2019 | | 8/23/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing - PLUMBING | 8/22/2019 | | 8/22/2019 | | FAIL |
Dan Ediger
|
|
|
1. Provide a roof overflow drain
2. See ISPC 407.3
3. Provide floor drain or change backflow assembly to a dc
|
Plan resubmittals received | | | 8/13/2019 | | DONE |
|
|
|
resubmittal per Julie Romig
|
Extend Review Timeline | | | 5/24/2019 | | DONE |
|
|
|
1st approved 180 day extension per adele. see documents
|
Telephone call | | | 5/15/2019 | | DONE |
|
|
|
Marla Carlson requested an extension emailed request was forward to Adele.
|
Meeting | | | 5/9/2019 | | DONE |
|
|
|
sent email to greg (cc'd marla, nick & jeremy) informing permit is going to expire in 11 days.
|
Expiration Notice | 4/25/2019 | 5/16/2019 | 4/25/2019 | | DONE |
Brittany Hill
|
|
|
|
Plan assigned to (JAR) | 11/29/2018 | 12/5/2018 | 4/19/2019 | | DONE |
Julie Romig
|
|
|
1st Rev Comp - 2nd Comp - 502 Amherst Madison Office Bldg Shell/Core
|
Routing - PLAN CHECK | 4/19/2019 | | 4/19/2019 | | PASS |
Julie Romig
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/19/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/19/2019 | | DONE |
|
|
|
NEED ACHD - met
REVISED VALUE-met
GC FORM-met
|
Routing - PLAN CHECK | 4/1/2019 | | 4/18/2019 | | FAIL |
Julie Romig
|
|
|
|
Routing - FIRE | 4/1/2019 | 4/1/2019 | 4/5/2019 | | PASS |
Erika Akin
|
|
|
Attached revised comments to case
|
Routing - MECHANICAL | 4/1/2019 | | 4/3/2019 | | PASS |
Troy James
|
|
|
|
Routing - Design Review | 4/1/2019 | | 4/2/2019 | | PASS |
Katelyn Menuge
|
|
|
Redlined changes.
|
Routing - PLUMBING | 4/1/2019 | | 4/2/2019 | | PASS |
Daryl Spivey
|
|
|
1) Provide tempered water to Lavs as required by ISPC 407.3
2) Secondary roof drainage required.
|
Routing - PUBLIC WORKS | 4/1/2019 | | 4/2/2019 | | PASS |
Angela Hardy
|
|
|
WBSD
|
Routing Off Site - STRUCTURAL | 4/1/2019 | | 4/1/2019 | | PASS |
Julie Romig
|
|
|
|
Route to Impact Fee Review | 1/10/2019 | 1/13/2019 | 1/10/2019 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - PLAN CHECK | 12/5/2018 | | 1/9/2019 | | FAIL |
Julie Romig
|
|
|
|
1st review completed | | | 1/9/2019 | | FAIL |
Julie Romig
|
|
|
|
Routing - FIRE | 11/29/2018 | 12/5/2018 | 1/2/2019 | | FAIL |
Erika Akin
|
|
|
Attached coomments to case and emailed architect
|
Routing Off Site - STRUCTURAL | 12/5/2018 | | 12/17/2018 | | FAIL |
Julie Romig
|
|
|
AHJ
|
Routing - MECHANICAL | 12/5/2018 | | 12/13/2018 | | PASS |
Troy James
|
|
|
|
Routing - Erosion and Sediment | 12/5/2018 | | 12/7/2018 | | PASS |
Andy J. Long
|
|
|
See ESC18-01466. Project already has ESC coverage. VOID
|
Routing - Design Review | 12/5/2018 | | 12/5/2018 | | FAIL |
Katelyn Menuge
|
|
|
Corrections Required
|
Routing PW Drainage | 12/5/2018 | | 12/5/2018 | | PASS |
Brian Murphy
|
|
|
APPROVED PER GRADING PERMIT
|
Routing PW Street Lights | 12/5/2018 | | 12/5/2018 | | PASS |
Tom Marshall
|
|
|
|
Routing PW Solid Waste | 12/5/2018 | | 12/5/2018 | | PASS |
Evan Carpenter
|
|
|
|
Routing - PLUMBING | 12/5/2018 | | 12/5/2018 | | PASS |
Daryl Spivey
|
|
|
1) Provide tempered water to lavs as required. ISPC 407.3
2) Secondary roof drainage required.
|
Routing - PLANNING | 12/5/2018 | | 12/5/2018 | | PASS |
Susan Riggs
|
|
|
|
Routing - Addressing | 12/5/2018 | | 12/5/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 12/5/2018 | | 12/5/2018 | | PASS |
Angela Hardy
|
|
|
PROJECT LOCATED IN WEST BOISE SEWER DISTRICT
|
Intake Approval | | | 11/29/2018 | | PASS |
|
|
|
Intake approval per JG
|
Intake Approval | | | 11/27/2018 | | FAIL |
Javier Guzman
|
|
|
To complete your application, please provide the following and upload:
1. The uploaded engineering calculations stamp is cut off by the initials “OL” and we cannot see the engineers license number
2. All the uploaded structural plan sheets engineering stamp is cut off by the initials “OL” and we cannot see the engineers license number
3. On drawing sheets L100, ESC1, C1, C2, C3, A321, E2.0L, E2.1L, E3.0 and E3.3 on the lower right hand corner, leave a 4"x2" blank space located 3" off the right sheet edge for the city approval stamps.
4. Provide fire extinguisher locations on plan sheet G002 as noted in checklist
City ePlanReview Submittal Standards found here with additional information regarding items 3: https://pds.cityofboise.org/media/464072/pdox86_electronic_standards_full_050718.pdf
|
Application received | | | 11/21/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 21 2018 9:40AM
|