Information based on query as of Wednesday, July 3, 2024.
Permit Information
Permit NumberBLD18-04243
StatusFinaled
Name THE RUSSELL CORPORATION
Site Address 592 N BENJAMIN LN
Project NameAmherst Madison Bldg Shell/Cor
Customer NumberBLD18-04369
ePlanReviewYes
Description
**TWO PERMITS IN EPLAN UNDER BLD18-04243** (AMHERST MADISON OFFICE BUILDING SHELL/CORE) (CUP18-00014) (DRH18-00061) Permit to construct a new 2-story, 13,504 sq ft office building and related site improvements. Tenant improvement for Amherst Madiston Real Estate Office under BLD18-04369. Work to include: construction of slab on grade concrete foundation, interior non-bearing tenant demising wall, electrical, mechanical, plumbing, and interior finishes to be in compliance with Ch. 8 of the 2015 IBC. Two-way communication is required at the elevator landing in accordance with 2015 IBC 1009.8. All work shall comply with the approved plans, DRH18-00061 and all applicable codes. This building is NOT Fire Sprinklered. Note: Special Inspections Required, see two attached Form 310s. **JAR**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 7/19/20207/28/2020 DONE
This permit finaled on the web by Caloub Huttash
First Notice5/11/20205/11/20207/9/2020 DONE
DetailsMike Jordan
mailed 7-9-2020
BLD-Final5/11/20205/11/20205/11/2020PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Jared Waggoner
DOC - Permit Finaled5/11/20205/11/20205/11/2020PPASS
DetailsMike Jordan
Zoning Approval5/11/20205/11/20205/11/2020 PASS
DetailsKatelyn Menuge
BLD-Conference5/6/20205/6/20205/6/2020PDONE
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Jared Waggoner
BLD-Final5/4/20205/4/20205/4/2020PNR
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Jared Waggoner
FIRE-Final Inspection5/4/20205/4/20205/4/2020PPASS
DetailsTroy Cobbley
Life safety passed.

screeened // Jerrod Phone #: ###-####
FIRE-Final Inspection4/29/20204/30/20204/30/2020PFAIL
DetailsTroy Cobbley
Permit can be finaled when the project related fire alarm permit and the Grading permit have been finaled. Jared Phone #: ###-####
BLD-Ceiling Grid Inspection3/25/20203/26/20203/26/2020PPASS
DetailsMike Jordan
2nd floor 3 west offices ceilings for cover Phone #: ###-#### Inspection requested via web by Jared Waggoner
BLD-Ceiling Grid Inspection3/20/20203/20/20203/20/2020PPART
DetailsMike Jordan
2nd floor ceiling grid for cover Phone #: ###-#### Inspection requested via web by Jared Waggoner. Grid ok pending electrical and mech. rough in inspection.
BLD-Ceiling Grid Inspection3/16/20203/17/20203/17/2020PPASS
DetailsMike Jordan
First floor ceiling grid Phone #: ###-#### Inspection requested via web by Jared Waggoner
BLD-Framing/Rough-in3/4/20203/4/20203/4/2020PPASS
DetailsMike Jordan
2nd floor cloud ceiling framing for cover Phone #: ###-#### Inspection requested via web by Jared Waggoner
BLD-Wall Bracing2/17/20202/18/20202/18/2020AFAIL
DetailsMike Jordan
1st floor west exterior interior shear Phone #: ###-#### Inspection requested via web by Jared Waggoner. Engineer of record to provide alternate attachment details for areas that are inaccessable to provide attachments.
BLD-Framing/Rough-in2/12/20202/13/20202/13/2020APASS
DetailsMike Jordan
First floor suspended GWB ceiling and 2 exterior canopies for cover Phone #: ###-#### Inspection requested via web by Jared Waggoner
BLD-Wall Bracing2/10/20202/11/20202/11/2020APASS
DetailsMike Jordan
2nd floor east interior shear wall for cover. Phone #: ###-#### Inspection requested via web by Jared Waggoner
BLD-Energy code compliance2/10/20202/10/20202/10/2020APASS
DetailsMike Jordan
2nd floor E/W/S exterior wall insulation Phone #: ###-#### Inspection requested via web by Jared Waggoner. Remainder of 2nd floor exterior walls ok.
BLD-Energy code compliance2/7/20202/7/20202/7/2020PPASS
DetailsMike Jordan
Foreman Phone #: ###-####. North exterior wall only ok.
Override - Parcel Holds2/7/20201/1/19002/7/2020  
Per Bob A. Override
BLD-Framing/Rough-in2/6/20202/6/20202/6/2020PPASS
DetailsMike Jordan
2nd floor walls and ceilings for cover Phone #: ###-#### Inspection requested via web by Jared Waggoner
BLD-Framing/Rough-in2/3/20202/3/20202/3/2020PPART
DetailsTony Young
Framing inspection for 1 side cover at 2nd floor interior walls. Phone #: ###-#### Inspection requested via web by Jared Waggoner,, interior wall ok to cover one side from 10 foot up to deck pending trades
BLD-Energy code compliance1/23/20201/24/20201/24/2020APASS
DetailsJim Storey
First Floor wall insulation Phone #: ###-#### Inspection requested via web by Jared Waggoner
BLD-Framing/Rough-in1/22/20201/22/20201/22/2020PPASS
DetailsMike Jordan
First floor rough framing for cover Phone #: ###-#### Inspection requested via web by Jared Waggoner. 1st floor interior steel stud walls ok. Hardlids ok pending mech. rough in inspection.
BLD-Wall Bracing1/13/20201/13/20201/13/2020PPASS
DetailsMike Jordan
90% partial exterior sheet metal shear inspection Phone #: ###-#### Inspection requested via web by Jared Waggoner
BLD-Framing/Rough-in12/30/201912/30/201912/30/2019PPASS
DetailsMike Jordan
Above roof deck wall framing for cover. Phone #: ###-#### Inspection requested via web by Jared Waggoner. Parapet framing on roof deck at east and west stair towers and pedestal framing for HVAC equipment.
CHANGE STATUS TO (ISS)  12/20/2019 DONE
Plan mod is for other permit BLD18-04369
BLD-Concrete11/14/201911/15/201911/15/2019APART
DetailsMike Jordan
2nd floor slab on deck reinforcement Phone #: ###-#### Inspection requested via web by Jared Waggoner. 2nd. floor slab on deck. work in progress. Needs to install perimeter #4 bar and splice 15ft. at re-enterant corners. Special inspection to verify.
BLD-Other11/4/201911/4/201911/4/2019PDEFR
DetailsMike Jordan
8" CMU grout at east patio walls 12''-16'' at 2:30 pm, will have special inspection Phone #: ###-#### Inspection requested via web by Jared Waggoner
BLD-Other10/31/201911/1/201911/1/2019PPEND
DetailsMike Jordan
CMU grout from 8''-12'' at 1pm, will have special inspection Phone #: ###-#### Inspection requested via web by Jared Waggoner. Pending special inspection.
BLD-Other10/30/201910/31/201910/31/2019PPART
DetailsMike Jordan
4''-8'' CMU grout at 3pm, will have special inspection Phone #: ###-#### Inspection requested via web by Jared Waggoner. 4ft. to 8ft. elevation for CMU wall at patio.4ft. to 8ft. elevation for CMU wall at patio.
BLD-Other10/30/201910/31/201910/31/2019ADEFR
DetailsMike Jordan
0''-4'' CMU grout at 10am, will have special inspection Phone #: ###-#### Inspection requested via web by Jared Waggoner
Inspection Record Card- Bld  10/21/2019 DONE
BLD-Concrete10/16/201910/17/201910/17/2019PPASS
DetailsMike Jordan
Slab on Grade Reinforcement Phone #: ###-#### Inspection requested via web by Jared Waggoner
BLD-Foundation9/27/20199/27/20199/27/2019PPASS
DetailsBrandon Shaw
Ok to place concrete pending special inspection.
BLD-Footing9/18/20199/18/20199/18/2019PPART
DetailsMike Jordan
Call 30 minutes ahead // Jerrod Phone #: ###-####. Perimeter footings, column pad footings, interior footings and elevator and trash enclosure footings. Noted clearance issues in some areas. Special inspection agency to verify clearane issues have been repaired prior to conc. placement. Ok to place concrete pending special inspection.
Permit Ready to Issue  9/18/2019 DONE
Issue PAID IN FULL permit  9/18/2019 DONE
Plan assigned to (JAR)8/13/20198/13/20199/17/2019 DONE
DetailsJulie Romig
1st Rev Comp - 4th Comp - Amherst Madison Shell/Core
Permit Ready to Issue  9/17/2019 DONE
met but please do not issue without BLD18-04369
Routing - PLAN CHECK9/10/2019 9/17/2019 PASS
DetailsJulie Romig
Routing - PLUMBING9/11/2019 9/11/2019 PASS
DetailsDan Ediger
per plans and ISPC
Routing - PLAN CHECK8/22/2019 9/9/2019 FAIL
DetailsJulie Romig
4th Review
Routing Off Site - STRUCTURAL8/22/2019 9/4/2019 PASS
DetailsJulie Romig
AHJ - 3rd Review
Routing - PUBLIC WORKS8/22/2019 8/23/2019 PASS
DetailsMorgan Webb
Routing - PLUMBING8/22/2019 8/22/2019 FAIL
DetailsDan Ediger
1. Provide a roof overflow drain
2. See ISPC 407.3
3. Provide floor drain or change backflow assembly to a dc
Plan resubmittals received  8/13/2019 DONE
resubmittal per Julie Romig
Extend Review Timeline  5/24/2019 DONE
1st approved 180 day extension per adele. see documents
Telephone call  5/15/2019 DONE
Marla Carlson requested an extension emailed request was forward to Adele.
Meeting  5/9/2019 DONE
sent email to greg (cc'd marla, nick & jeremy) informing permit is going to expire in 11 days.
Expiration Notice4/25/20195/16/20194/25/2019 DONE
DetailsBrittany Hill
Plan assigned to (JAR)11/29/201812/5/20184/19/2019 DONE
DetailsJulie Romig
1st Rev Comp - 2nd Comp - 502 Amherst Madison Office Bldg Shell/Core
Routing - PLAN CHECK4/19/2019 4/19/2019 PASS
DetailsJulie Romig
PLANS/APPL TAKEN TO FRONT DESK  4/19/2019 DONE
Permit Ready to Issue  4/19/2019 DONE
NEED ACHD - met
REVISED VALUE-met
GC FORM-met
Routing - PLAN CHECK4/1/2019 4/18/2019 FAIL
DetailsJulie Romig
Routing - FIRE4/1/20194/1/20194/5/2019 PASS
DetailsErika Akin
Attached revised comments to case
Routing - MECHANICAL4/1/2019 4/3/2019 PASS
DetailsTroy James
Routing - Design Review4/1/2019 4/2/2019 PASS
DetailsKatelyn Menuge
Redlined changes.
Routing - PLUMBING4/1/2019 4/2/2019 PASS
DetailsDaryl Spivey
1) Provide tempered water to Lavs as required by ISPC 407.3
2) Secondary roof drainage required.
Routing - PUBLIC WORKS4/1/2019 4/2/2019 PASS
DetailsAngela Hardy
WBSD
Routing Off Site - STRUCTURAL4/1/2019 4/1/2019 PASS
DetailsJulie Romig
Route to Impact Fee Review1/10/20191/13/20191/10/2019 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Routing - PLAN CHECK12/5/2018 1/9/2019 FAIL
DetailsJulie Romig
1st review completed  1/9/2019 FAIL
DetailsJulie Romig
Routing - FIRE11/29/201812/5/20181/2/2019 FAIL
DetailsErika Akin
Attached coomments to case and emailed architect
Routing Off Site - STRUCTURAL12/5/2018 12/17/2018 FAIL
DetailsJulie Romig
AHJ
Routing - MECHANICAL12/5/2018 12/13/2018 PASS
DetailsTroy James
Routing - Erosion and Sediment12/5/2018 12/7/2018 PASS
DetailsAndy J. Long
See ESC18-01466. Project already has ESC coverage. VOID
Routing - Design Review12/5/2018 12/5/2018 FAIL
DetailsKatelyn Menuge
Corrections Required
Routing PW Drainage12/5/2018 12/5/2018 PASS
DetailsBrian Murphy
APPROVED PER GRADING PERMIT
Routing PW Street Lights12/5/2018 12/5/2018 PASS
DetailsTom Marshall
Routing PW Solid Waste12/5/2018 12/5/2018 PASS
DetailsEvan Carpenter
Routing - PLUMBING12/5/2018 12/5/2018 PASS
DetailsDaryl Spivey
1) Provide tempered water to lavs as required. ISPC 407.3
2) Secondary roof drainage required.
Routing - PLANNING12/5/2018 12/5/2018 PASS
DetailsSusan Riggs
Routing - Addressing12/5/2018 12/5/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS12/5/2018 12/5/2018 PASS
DetailsAngela Hardy
PROJECT LOCATED IN WEST BOISE SEWER DISTRICT
Intake Approval  11/29/2018 PASS
Intake approval per JG
Intake Approval  11/27/2018 FAIL
DetailsJavier Guzman
To complete your application, please provide the following and upload:
1. The uploaded engineering calculations stamp is cut off by the initials “OL” and we cannot see the engineers license number
2. All the uploaded structural plan sheets engineering stamp is cut off by the initials “OL” and we cannot see the engineers license number
3. On drawing sheets L100, ESC1, C1, C2, C3, A321, E2.0L, E2.1L, E3.0 and E3.3 on the lower right hand corner, leave a 4"x2" blank space located 3" off the right sheet edge for the city approval stamps.
4. Provide fire extinguisher locations on plan sheet G002 as noted in checklist
City ePlanReview Submittal Standards found here with additional information regarding items 3: https://pds.cityofboise.org/media/464072/pdox86_electronic_standards_full_050718.pdf
Application received  11/21/2018 DONE
Application submitted via PDS Online on Nov 21 2018 9:40AM