BLD-Framing/Rough-in | 4/29/2020 | 4/30/2020 | 4/30/2020 | A | PASS |
Mike Jordan
|
|
|
Ceiling drops for cover, Building 10 (12 units). Phone #: ###-#### Inspection requested via web by Bob Goodwin
|
BLD-Framing/Rough-in | 4/29/2020 | 4/29/2020 | 4/29/2020 | A | NR |
Mike Jordan
|
|
|
Ceiling drops for cover in Building 10 (12 units), late as possible this morning. Phone #: ###-#### Inspection requested via web by Bob Goodwin. Stiil needs mech. rough in inspection. electrical rough in inspection has failed for all units.
|
BLD-Framing/Rough-in | 4/27/2020 | 4/28/2020 | 4/28/2020 | P | NR |
Mike Jordan
|
|
|
Ceiling drops framing inspection for cover, Building 10 (12 Units). Phone #: ###-#### Inspection requested via web by Bob Goodwin
|
BLD-Energy code compliance | 4/13/2020 | 4/15/2020 | 4/15/2020 | A | PASS |
Tell Riley
|
|
|
Building 10 Insulation, Vapor Barrier ; RC Channel for cover Phone #: ###-#### Inspection requested via web by Bob Goodwin
|
BLD-Energy code compliance | 4/13/2020 | 4/14/2020 | 4/13/2020 | A | CANC |
Mike Jordan
|
|
|
Building 10 Insulation, Vapor Barrier & RC Channel for cover Phone #: ###-#### >> Inspection requested via web by Bob Goodwin Inspection cancelled from web by: Bob Goodwin
|
BLD-Framing/Rough-in | 4/10/2020 | 4/13/2020 | 4/13/2020 | A | PASS |
Mike Jordan
|
|
|
Building 10 Framing Inspection, C3 truss bearing point truss-manufacturer "No Repair Needed", drawing confirmation. Phone #: ###-#### Inspection requested via web by Bob Goodwin. Per the truss engineer, no repair is required for the missed C3 truss bearing location.
|
BLD-Framing/Rough-in | 4/8/2020 | 4/9/2020 | 4/9/2020 | P | FAIL |
Mike Jordan
|
|
|
Building 10 Energy Seal, Fire Caulking ; Framing for Cover Phone #: ###-#### Inspection requested via web by Bob Goodwin. Complete fire caulking, fireblock fur out walls. Provide approved fix for missed bearing points on C3 trusses.
|
BLD-Framing/Rough-in | 2/26/2020 | 2/27/2020 | 2/27/2020 | A | CANC |
Mike Jordan
|
|
|
Re-inspect shear Phone #: ###-#### Inspection requested via web by Kris Linnell
|
BLD-Wall Bracing | 2/27/2020 | 2/27/2020 | 2/27/2020 | A | PASS |
Mike Jordan
|
|
|
Re-inspect shear Phone #: ###-#### Inspection requested via web by Kris Linnell. Exterior shear only.
|
BLD-Framing/Rough-in | 2/26/2020 | 2/26/2020 | 2/26/2020 | P | NR |
Mike Jordan
|
|
|
Shear re-inspection Phone #: ###-#### Inspection requested via web by Kris Linnell
|
BLD-Framing/Rough-in | 2/25/2020 | 2/25/2020 | 2/25/2020 | P | FAIL |
Mike Jordan
|
|
|
Inspection on Exterior shear Phone #: ###-#### Inspection requested via web by Kris Linnell
|
BLD-Framing/Rough-in | 2/20/2020 | 2/21/2020 | 2/21/2020 | A | PART |
Mike Jordan
|
|
|
Exterior Shear and Wall Framing on East Exterior Walls for Plumbing wall pre-rock. Phone #: ###-#### Inspection requested via web by Kris Linnell. Ok to pre rock at tubs only.
|
BLD-Concrete | 10/9/2019 | 10/10/2019 | 10/13/2019 | P | PASS |
Dave Hannah
|
|
|
Building 10 Thickend footing and slab reinforcement inspeciton Phone #: ###-#### Inspection requested via web by Kris Linnell
|
BLD-Energy code compliance | 9/20/2019 | 9/23/2019 | 9/23/2019 | P | PASS |
Mike Jordan
|
|
|
Stem Wall insulation Phone #: ###-#### Inspection requested via web by Kris Linnell
|
BLD-Foundation | 9/17/2019 | 9/18/2019 | 9/18/2019 | A | PASS |
Mike Jordan
|
|
|
Stem Walls for Building 10. Pour scheduled for 2P.M. Phone #: ###-#### Inspection requested via web by Kris Linnell
|
BLD-Footing | 9/6/2019 | 9/9/2019 | 9/9/2019 | A | PART |
Mike Jordan
|
|
|
Rebar inspection for footings. Pour is scheduled for 1130 Phone #: ###-#### Inspection requested via web by Kris Linnell. Work in progress on installing the remaing verts. Ok to place concrete pending special inspection.
|
BLD-Footing | 9/5/2019 | 9/6/2019 | 9/6/2019 | P | CANC |
Mike Jordan
|
|
|
Chris Phone #: ###-#### Inspection cancelled from web by: Kris Linnell
|
CHANGE STATUS TO (ISS) | | | 9/5/2019 | | DONE |
|
|
|
plan mod
|
OVERRIDE | | | 8/6/2019 | | |
|
|
|
|
Plan assigned to (JAR) | 7/24/2019 | 7/24/2019 | 8/6/2019 | | DONE |
Julie Romig
|
|
|
1st Rev Comp - Plan Mod - Rosewood Bldg 10
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/6/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/6/2019 | | DONE |
|
|
|
PLAN MOD - DO NOT REISSUE UNTIL PLAN MOD FEES FOR BLD19-04520 HAVE BEEN PAID
|
Routing - Design Review | 8/5/2019 | | 8/5/2019 | | PASS |
Andrea Tuning
|
|
|
|
Routing - Design Review | 7/30/2019 | | 8/1/2019 | | FAIL |
Andrea Tuning
|
|
|
Remove trash enclosure from adjacent to Susan Drive
|
Routing - PLAN CHECK | 7/30/2019 | | 8/1/2019 | | PASS |
Julie Romig
|
|
|
Pending DR approval
|
Routing PW Drainage | 7/30/2019 | | 7/31/2019 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Sewer Design | 7/30/2019 | | 7/31/2019 | | PASS |
DeAnn Brown
|
|
|
|
Routing - PLUMBING | 7/30/2019 | | 7/30/2019 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing - PUBLIC WORKS | 7/30/2019 | | 7/30/2019 | | PASS |
Angela Hardy
|
|
|
|
Plan Modification Accepted | | | 7/24/2019 | | DONE |
|
|
|
plan mod accepted in e plan for BLD18-04520, BLD18-04521 & BLD18-04519-updates to the utilities-PW, water lines ectC1.0,C2.0, C2.1, P2.1, A0.1, A2.2,A2.3,A4.3,A10.0, S2.2, S2.3, S2.4, S5.1-assigned to JAR-no valuations will change
|
Plan assigned to (JAR) | 1/2/2019 | 1/3/2019 | 7/23/2019 | | DONE |
Julie Romig
|
|
|
1st Rev Comp - 4th Comp - 506 Rosewood Apts Bldg 10
|
Issue PAID IN FULL permit | | | 7/12/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/12/2019 | | DONE |
|
|
|
|
Telephone call | | | 7/10/2019 | | DONE |
|
|
|
emailed the rest of the fees still due to tom and jade
|
OVERRIDE | | | 7/9/2019 | | |
|
|
|
|
Permit Ready to Issue | | | 7/9/2019 | | DONE |
|
|
|
MET- Need RP
|
Routing - PLAN CHECK | 7/2/2019 | | 7/8/2019 | | PASS |
Julie Romig
|
|
|
|
Routing - Design Review | 7/2/2019 | | 7/2/2019 | | FAIL |
Andrea Tuning
|
|
|
|
Routing - PLAN CHECK | 6/25/2019 | | 6/25/2019 | | PASS |
Julie Romig
|
|
|
All IBC Plan Review items passed. Corrections required per DR.
|
Routing PW Sewer Design | 6/25/2019 | | 6/25/2019 | | PASS |
DeAnn Brown
|
|
|
|
Routing - Design Review | 6/25/2019 | | 6/25/2019 | | FAIL |
Andrea Tuning
|
|
|
Replace the street trees on Susan Drive that were removed from this version of the landscape plan.
Remove the trash enclosure from the setback.
|
Routing - PLANNING | 6/25/2019 | | 6/25/2019 | | PASS |
Karla Nelson
|
|
|
Recorded CCR's from April 25 cover the parking cross access agreement.
|
Routing - PLAN CHECK | 4/24/2019 | | 5/2/2019 | | FAIL |
Julie Romig
|
|
|
All IBC Plan Review items passed. Corrections required per DR, Planning, PW Sewer Design: easements/agreements required.
|
Routing PW Sewer Design | 4/24/2019 | | 5/2/2019 | | FAIL |
DeAnn Brown
|
|
|
Sewer service pipeline under proposed building 10 must be relocated prior to approval of building permit.
|
Routing - PLAN CHECK | 4/10/2019 | | 4/22/2019 | | FAIL |
Julie Romig
|
|
|
|
Routing PW Drainage | 4/10/2019 | | 4/18/2019 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Sewer Design | 4/10/2019 | | 4/11/2019 | | FAIL |
DeAnn Brown
|
|
|
Notes on sheet C2.0 still call out an existing 18" sewer main, when it is a 15" sewer main. Notes also use slopes for 6-inch services that match the service invert to the mainline invert. Services should tap mainline at or above 80% full level. Please revise.
|
Routing - Design Review | 4/10/2019 | | 4/10/2019 | | FAIL |
Andrea Tuning
|
|
|
Submit a recorded cross access agreement.
|
Routing - PLANNING | 4/10/2019 | | 4/10/2019 | | FAIL |
Nicolette Womack
|
|
|
Need to consolidate the parcels or provide a cross access/share parking agreement
|
Routing PW Sewer Design | 3/21/2019 | | 3/27/2019 | | FAIL |
DeAnn Brown
|
|
|
Changemarks from the first two review sessions have not been addressing. Revise and resubmit.
|
Routing - PLAN CHECK | 3/21/2019 | | 3/26/2019 | | FAIL |
Julie Romig
|
|
|
|
Routing - PLANNING | 3/21/2019 | | 3/21/2019 | | FAIL |
David Moser
|
|
|
need cross access / shared parking agreement
|
Routing - Design Review | 3/21/2019 | | 3/21/2019 | | FAIL |
Andrea Tuning
|
|
|
The applicant should consolidate the parcels into one large parcel or enter into a cross access/shared parking agreement in regard to parking, pedestrian networks and trash collection.
Provide a minimum of 66 bicycle parking spaces on the site with 17 of these spaces being covered. To provide a safe, covered and efficient location for the bicycles, the applicant will be required to design the spaces to be a minimum of 6 feet long and 2.5 feet wide and have an overhead clearance of 7-feet if covered. A 4-foot wide aisle is required between rows of bicycle parking or nearby walls. Stationary racks shall be located on improved non-permeable surfaces and anchored to the ground.
All light poles and fixtures shall be located outside of the required setbacks and landscape planters which contain trees as required by the landscape ordinance. All lighting shall also be designed and located so as to prevent glare or direct light from falling onto adjoining properties or streets. The illumination of all light fixtures shall not exceed two foot candles as measured 1-foot above the ground at property lines shared with residentially zoned or used parcels. All new pole lighting shall feature 100 percent cut-off light fixtures and all new wall lighting shall have full cut-off shields.
|
Routing - PLAN CHECK | 3/6/2019 | | 3/19/2019 | | FAIL |
Julie Romig
|
|
|
|
Routing PW Sewer Design | 3/6/2019 | | 3/13/2019 | | FAIL |
DeAnn Brown
|
|
|
Corrections noted in last review were not included in new set. Please see changemarks for noted corrections/changes.
|
Routing Off Site - STRUCTURAL | 3/6/2019 | | 3/12/2019 | | PASS |
Julie Romig
|
|
|
KPFF 2nd Review
|
Routing PW Street Lights | 3/6/2019 | | 3/8/2019 | | PASS |
Tom Marshall
|
|
|
|
Routing - Design Review | 3/6/2019 | | 3/6/2019 | | FAIL |
Andrea Tuning
|
|
|
The applicant should consolidate the parcels into one large parcel or enter into a cross access/shared parking agreement in regard to parking, pedestrian networks and trash collection.
Provide a minimum of 66 bicycle parking spaces on the site with 17 of these spaces being covered. To provide a safe, covered and efficient location for the bicycles, the applicant will be required to design the spaces to be a minimum of 6 feet long and 2.5 feet wide and have an overhead clearance of 7-feet if covered. A 4-foot wide aisle is required between rows of bicycle parking or nearby walls. Stationary racks shall be located on improved non-permeable surfaces and anchored to the ground.
Replace the street trees on Susan Drive that were removed from this version of the landscape plan.
All light poles and fixtures shall be located outside of the required setbacks and landscape planters which contain trees as required by the landscape ordinance. All lighting shall also be designed and located so as to prevent glare or direct light from falling onto adjoining properties or streets. The illumination of all light fixtures shall not exceed two foot candles as measured 1-foot above the ground at property lines shared with residentially zoned or used parcels. All new pole lighting shall feature 100 percent cut-off light fixtures and all new wall lighting shall have full cut-off shields.
|
Routing - PLANNING | 3/6/2019 | | 3/6/2019 | | FAIL |
David Moser
|
|
|
need a cross access and parking agreement and 48 bike parking are shown and 66 required, need more information on bike parking spaces.
|
Route to Impact Fee Review | 2/13/2019 | 2/16/2019 | 2/14/2019 | | PASS |
Shannon Cade
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 2/12/2019 | | FAIL |
Julie Romig
|
|
|
|
Routing - PLAN CHECK | 1/3/2019 | | 2/12/2019 | | FAIL |
Julie Romig
|
|
|
|
Routing - FIRE | 1/2/2019 | 1/3/2019 | 2/5/2019 | | PASS |
Mark Scharfen
|
|
|
IFC Fire Code review uploaded and complete.
|
Routing Off Site - STRUCTURAL | 1/3/2019 | | 1/16/2019 | | FAIL |
Julie Romig
|
|
|
KPFF
|
Routing PW Drainage | 1/4/2019 | | 1/14/2019 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Sewer Design | 1/4/2019 | | 1/14/2019 | | FAIL |
DeAnn Brown
|
|
|
See changemarks in eplanreview. Contact DeAnn Brown ###-#### for record drawings.
|
Routing - Addressing | 1/3/2019 | | 1/10/2019 | | PASS |
Doug Chausow
|
|
|
New address: 974 N Maple Grove Rd
|
Routing - PUBLIC WORKS | 1/3/2019 | | 1/10/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing - Erosion and Sediment | 1/3/2019 | | 1/9/2019 | | PASS |
Andy J. Long
|
|
|
ESC site map and SWPPP approved. RP tbd, must be provided before permit may be issued . Site preparation inspection is REQUIRED
|
Routing - MECHANICAL | 1/3/2019 | | 1/9/2019 | | PASS |
Troy James
|
|
|
|
Routing PW Solid Waste | 1/4/2019 | | 1/4/2019 | | PASS |
Evan Carpenter
|
|
|
|
Routing PW Street Lights | 1/4/2019 | | 1/4/2019 | | PASS |
Tom Marshall
|
|
|
|
Routing - PLUMBING | 1/3/2019 | | 1/3/2019 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing - Design Review | 1/3/2019 | | 1/3/2019 | | FAIL |
Andrea Tuning
|
|
|
The applicant should consolidate the parcels into one large parcel or enter into a cross access/shared parking agreement in regard to parking, pedestrian networks and trash collection.
Provide a minimum of 66 bicycle parking spaces on the site with 17 of these spaces being covered. To provide a safe, covered and efficient location for the bicycles, the applicant will be required to design the spaces to be a minimum of 6 feet long and 2.5 feet wide and have an overhead clearance of 7-feet if covered. A 4-foot wide aisle is required between rows of bicycle parking or nearby walls. Stationary racks shall be located on improved non-permeable surfaces and anchored to the ground.
All light poles and fixtures shall be located outside of the required setbacks and landscape planters which contain trees as required by the landscape ordinance. All lighting shall also be designed and located so as to prevent glare or direct light from falling onto adjoining properties or streets. The illumination of all light fixtures shall not exceed two foot candles as measured 1-foot above the ground at property lines shared with residentially zoned or used parcels. All new pole lighting shall feature 100 percent cut-off light fixtures and all new wall lighting shall have full cut-off shields.
|
Intake Approval | | | 1/2/2019 | | PASS |
Joe Bruce
|
|
|
Prescreen approval by JHB
|
Intake Approval | | | 12/26/2018 | | FAIL |
Joe Bruce
|
|
|
1) The Verification of Legal Lot or Parcel is required to be signed by out planning and zoning staff prior to being submitted for a permit. Please contact Sue Cummings for more info: ###-####, scummings@cityofboise.org
2) Plan sheets do not have the required space reserved for City approval stamps as specified in the Electronic Plans Submittal Standards. Revise sheets with a blank 4” x 2” (4"x4" on cover) space located 3” off the right sheet edge to allow for the title block. Verify ALL plan sheets have the required space for city approval stamp.
3) Sheet A1.0, A1.1, and A1.2 could not be located. Upload these drawings or revise sheet index on cover page to exclude these sheets.
|
Application received | | | 12/20/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 20 2018 3:07PM
|
Routing - PLANNING | 1/3/2019 | | | | FAIL |
|
|
|
The applicant should consolidate the parcels into one large parcel or enter into a cross access/shared parking agreement. Provide 66 bicycle parking spaces on the site with 17 of the spaces covered.
|