Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD18-04520
StatusIssued
Name WRIGHT BROTHERS THE BLDG CO EAGLE
Site Address 982 N MAPLE GROVE RD
Project NameRosewood Apartments Bldg 11
Customer NumberBLD18-04521
ePlanReviewYes
Description
**2 BUILDING PERMITS IN EPLAN UNDER BLD18-04520** (ROSEWOOD APARTMENTS) (BUILDING #11) //08/01/19 PLAN MOD TO UTILITY LINE LOCATIONS AND LANDSCAPE PLANS. JAR// // 07/09/19 PLAN MOD TO CONSTRUCT A 2-HOUR FIRE WALL FOR BUILDING AREA FOR TYPE VB CONSTRUCTION. Permit for the construction of a new 47,415 sq ft, 3-story, 36-unit apartment building (identified as Type VII on plans). Work to include general site work including the demolition of existing residential structures and the construction of the new building per the approved plans. Alternate to use the 2018 IBC 704.4.1 for Type VA construction of interior columns. Special inspections required per attached Form 310. Carports to be constructed under separate building permit. All buildings are to be fully fire sprinklered with an NFPA 13-R system as required for residential occupancy and story increase. Exterior decks and breezeways to be protected. **JAR**
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection8/13/20208/13/20208/13/2020APASS
DetailsGreg Ruxton
Passed Fire Life Safety.

Fire/Life Safety Inspection for Occupancy. Phone #: ###-#### Inspection requested via web by Bob Goodwin
BLD-Framing/Rough-in4/10/20204/13/20204/13/2020APASS
DetailsMike Jordan
Ceiling drops framing inspection for cover, Building 11 - Tower 3 (12 units). Phone #: ###-#### Inspection requested via web by Bob Goodwin
BLD-Wall cover4/3/20204/3/20204/3/2020PPASS
DetailsMike Jordan
Cover inspection for ceiling drops framing in Building 11 - Tower 2 (12 Units). Phone #: ###-#### Inspection requested via web by Bob Goodwin
BLD-Energy code compliance3/25/20203/26/20203/26/2020APASS
DetailsMike Jordan
Insulation and RC inspection for cover in Building 11 -Tower 3 (North 12 units) Phone #: ###-#### Inspection requested via web by Bob Goodwin
BLD-Framing/Rough-in3/18/20203/19/20203/19/2020APASS
DetailsMike Jordan
Energy Seal, Fire Caulking ; Framing for cover at Building 11 - Tower 3. (North 12 units). Phone #: ###-#### Inspection requested via web by Bob Goodwin
BLD-Framing/Rough-in3/18/20203/18/20203/18/2020PFAIL
DetailsMike Jordan
Energy Seal, Fire Caulking ; Framing for Cover of Building 11 - Tower 3 (North 12 units). Phone #: ###-#### Inspection requested via web by Bob Goodwin
BLD-Ceiling Grid Inspection3/16/20203/16/20203/16/2020PPASS
DetailsDave Hannah
tower 1 // Chris Phone #: ###-#### fur downs ok to cover
BLD-Energy code compliance3/6/20203/6/20203/6/2020PPASS
DetailsMike Jordan
chris Phone #: ###-####. Gyp added behind ADA tub and blocking added.
BLD-Framing/Rough-in2/28/20202/28/20202/28/2020PPASS
DetailsTell Riley
tower 2 // Chris Phone #: ###-#### Inspection requested via web by Brittany Hill//fire caulk added as we walked through//need gyp board behind ada shower//add blocking for ada bathroom units 105 and 106//ok to insulate//
BLD-Energy code compliance2/23/20202/24/20202/24/2020APASS
DetailsMike Jordan
RC channel and insulation inspection for cover in Tower 1. Phone #: ###-#### Inspection requested via web by Kris Linnell
Routing - MECHANICAL2/21/2020 2/21/2020 PASS
DetailsTroy James
Plan mod to add fire dampers to outside air ducts at exterior wall.
BLD-Framing/Rough-in2/19/20202/19/20202/19/2020APASS
DetailsMike Jordan
Energy Seal, Fire Caulking ; Framing Building 11 - Tower 1. Phone #: ###-#### Inspection requested via web by Bob Goodwin
Meeting  2/19/2020 DONE
PLAN MOD #3 only for building 12 see BLD18-04521
BLD-Framing/Rough-in2/18/20202/18/20202/18/2020PNR
DetailsMike Jordan
Building 11 tower 1 Framing, Fire Caulking, Energy Seal. Phone #: ###-#### Inspection requested via web by Kris Linnell
BLD-Framing/Rough-in2/17/20202/18/20202/18/2020ANR
DetailsMike Jordan
Building 11 tower 1 Framing, Fire Caulking, Energy Seal. Phone #: ###-#### Inspection requested via web by Kris Linnell. moved to pm.
BLD-Framing/Rough-in1/15/20201/15/20201/15/2020PPASS
DetailsMike Jordan
South East End Walls framing for cover for plumbing fur out wall. Phone #: ###-#### Inspection requested via web by Kris Linnell
BLD-Framing/Rough-in12/31/20191/2/20201/2/2020APASS
DetailsMike Jordan
Framing inspection at tubs ; showers for insulation and pre-rock. Phone #: ###-#### Inspection requested via web by Bob Goodwin
BLD-Wall cover12/30/201912/30/201912/30/2019PPASS
DetailsMike Jordan
Building 11, Gridline 7, 2-hr wall second layer joint overlaps Phone #: ###-#### Inspection requested via web by Bob Goodwin
BLD-Energy code compliance12/27/201912/27/201912/27/2019PPART
DetailsBrandon Shaw
Gridline 7, 2-hr wall insulation
OK to cover...
BLD-Framing/Rough-in12/26/201912/26/201912/26/2019PPART
DetailsTony Young
Framing inspection of Gridline 7 for 2hr Firewall, prior to insulation. Phone #: ###-#### Inspection requested via web by Bob Goodwin// ok to cover
BLD-Conference12/10/201912/12/201912/12/2019ADONE
DetailsMike Jordan
Fire Caulking and Fire Proofing Conference with GC and Sub-contractors at
9:00 A.M. Phone #: ###-#### Inspection requested via web by Kris Linnell
BLD-Framing/Rough-in12/2/201912/3/201912/3/2019APASS
DetailsMike Jordan
Full exterior shear inspection for weather barrier cover. Phone #: ###-#### Inspection requested via web by Kris Linnell. 1st. 2nd. and 3rd. floor exterior shear and exterior floor to floor straps. interior holdowns and anchor bolts as well ok. Still need interior floor to floor straps.
BLD-Framing/Rough-in11/25/201911/26/201911/26/2019PPASS
DetailsMike Jordan
Shear inspection only in breezeways for Pre-Rock Cover. Phone #: ###-#### Inspection requested via web by Kris Linnell. 1st, 2nd, and 3rd floor breezeways only ok.
BLD-Concrete10/3/201910/4/201910/4/2019PPASS
DetailsMike Jordan
North Half of Building 11 Slab and interior thicken footings reinforcement Phone #: ###-#### Inspection requested via web by Kris Linnell
BLD-Concrete9/20/20199/23/20199/23/2019PPASS
DetailsMike Jordan
South Half of Building 11 Building slab. Phone #: ###-#### Inspection requested via web by Kris Linnell. Interior thickend footings and column pad footings ok.
BLD-Energy code compliance9/6/20199/9/20199/9/2019APASS
DetailsMike Jordan
North Half of building 11 stem wall insulation. Phone #: ###-#### Inspection requested via web by Kris Linnell
BLD-Energy code compliance9/5/20199/6/20199/6/2019PCANC
DetailsMike Jordan
Stem wall insulation on North Half of building 11. Phone #: ###-#### >> Inspection requested via web by Kris Linnell Inspection cancelled from web by: Kris Linnell
BLD-Energy code compliance8/16/20198/19/20198/19/2019APASS
DetailsMike Jordan
South Half of building 11 energy code compliance for stem wall insulation. Phone #: ###-#### Inspection requested via web by Kris Linnell
BLD-Footing8/16/20198/19/20198/19/2019APASS
DetailsMike Jordan
North Half Building 11 footing rebar inspection. Concrete scheduled for 11:45 A.M.- Third Party inspector scheduled onsite for pour. Phone #: ###-#### Inspection requested via web by Kris Linnell
BLD-Foundation8/9/20198/12/20198/12/2019PDEFR
DetailsMike Jordan
Building 11- South Half Stem Walls Inspection requested via web by Kris Linnell. Ok to place concrete pending speciial inspection..
OVERRIDE  8/6/2019  
Plan assigned to (JAR)7/24/20197/24/20198/6/2019 DONE
DetailsJulie Romig
1st Rev Comp - Plan Mod - Rosewood Bldg 11
CHANGE STATUS TO (ISS)  8/6/2019 DONE
plan mod
Permit Ready to Issue  8/6/2019 DONE
PLAN MOD - DO NOT REISSUE UNTIL PLAN MOD FEES HAVE BEEN PAID
Routing - Design Review8/5/2019 8/5/2019 PASS
DetailsAndrea Tuning
BLD-Footing7/31/20198/1/20198/1/2019PPART
DetailsMike Jordan
gridline 1 through gridline 5 // Bob Phone #: ###-####. exterior and breezeway footings, south half, work in progress. Ok to place concrete pending special inspection.
Routing - Design Review7/30/2019 8/1/2019 FAIL
DetailsAndrea Tuning
Remove trash enclosure from adjacent to Susan Drive on all grading plans and site plans
Routing - PLAN CHECK7/30/2019 8/1/2019 PASS
DetailsJulie Romig
Pending DR approval
Routing PW Drainage7/30/2019 7/31/2019 PASS
DetailsBrian Murphy
Routing PW Sewer Design7/30/2019 7/31/2019 PASS
DetailsDeAnn Brown
Routing - PLUMBING7/30/2019 7/30/2019 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Routing - PUBLIC WORKS7/30/2019 7/30/2019 PASS
DetailsAngela Hardy
Plan Modification Accepted  7/24/2019 DONE
****this permit had fees due before the plan mod was started***plan mod accepted in e plan for BLD18-04520, BLD18-04521 & BLD18-04519-updates to the utilities-PW, water lines ectC1.0,C2.0, C2.1, P2.1, A0.1, A2.2,A2.3,A4.3,A10.0, S2.2, S2.3, S2.4, S5.1-assigned to JAR-no valuations will change
OVERRIDE  7/17/2019  
Plan assigned to (JAR)6/25/20196/25/20197/17/2019 DONE
DetailsJulie Romig
07/18 - 1st Rev Comp - Plan Mod Rosewood Apt Bldg 11
Routing Off Site - STRUCTURAL7/12/2019 7/17/2019 PASS
DetailsJulie Romig
KPFF
Routing - PLAN CHECK7/12/2019 7/17/2019 PASS
DetailsJulie Romig
Meeting  7/17/2019 DONE
plan mod was started on bld18-04521 per julie it should have been this one
Permit Ready to Issue  7/17/2019 DONE
PLAN MOD
Routing - PLAN CHECK6/25/2019 7/11/2019 FAIL
DetailsJulie Romig
Refer to changemark in ePlanReview
Routing - Design Review3/6/2019 6/25/2019 FAIL
DetailsAndrea Tuning
The applicant should consolidate the parcels into one large parcel or enter into a cross access/shared parking agreement in regard to parking, pedestrian networks and trash collection.

Replace the street trees on Susan Drive that were removed from this version of the landscape plan.
Telephone call  5/29/2019  
Spoke with Wendy informing about fees. She stated their project, but they didn't pay for them and will look in to it. informed her a check would need to be brought in our if they use a different account they may pay online
Telephone call  5/22/2019 DONE
left a message ###-####- Jeff Chapman with Wright Brothers, that we need RP and information on ACHD
Issue PAID IN FULL permit  5/22/2019 DONE
Print Occupancy Form  5/22/2019 DONE
Expiration Notice5/21/20196/12/20195/21/2019 DONE
DetailsBrittany Hill
OVERRIDE  5/16/2019  
Plan assigned to (JAR)1/2/20191/3/20195/16/2019 DONE
DetailsJulie Romig
1st Rev Comp - 4th Comp - 506 Rosewood Apts Bldg 11
Routing PW Drainage1/10/2019 5/16/2019 PASS
DetailsBrian Murphy
Routing PW Street Lights1/10/2019 5/16/2019 PASS
DetailsTom Marshall
Routing - PLAN CHECK5/13/2019 5/16/2019 PASS
DetailsJulie Romig
PLANS/APPL TAKEN TO FRONT DESK  5/16/2019 DONE
Permit Ready to Issue  5/16/2019 DONE
MET
NEED ACHD (DO NOT ISSUE WITHOUT BLD18-04521)
NEED RP
Routing - Addressing5/15/2019 5/15/2019 PASS
DetailsDoug Chausow
Routing - PLANNING5/14/2019 5/14/2019 PASS
DetailsNicolette Womack
Routing - Design Review5/14/2019 5/14/2019 PASS
DetailsAndrea Tuning
Routing PW Sewer Design5/13/2019 5/13/2019 PASS
DetailsDeAnn Brown
Routing - PLAN CHECK4/24/2019 5/2/2019 FAIL
DetailsJulie Romig
All IBC Plan Review items passed. Corrections required per DR, Planning, PW Sewer Design: easements/agreements required.
Routing PW Sewer Design4/24/2019 5/2/2019 PASS
DetailsDeAnn Brown
Routing - PLAN CHECK4/10/2019 4/22/2019 FAIL
DetailsJulie Romig
Routing PW Sewer Design4/10/2019 4/11/2019 FAIL
DetailsDeAnn Brown
Notes on sheet C2.0 still call out an existing 18" sewer main, when it is a 15" sewer main. Notes also use slopes for 6-inch services that match the service invert to the mainline invert. Services should tap mainline at or above 80% full level. Please revise.
Routing - PLANNING4/10/2019 4/10/2019 FAIL
DetailsNicolette Womack
Need to consolidate the parcels or provide a cross access/share parking agreement
Routing - Design Review4/10/2019 4/10/2019 FAIL
DetailsAndrea Tuning
Submit a recorded cross access agreement.
Routing PW Sewer Design3/21/2019 3/27/2019 FAIL
DetailsDeAnn Brown
Changemarks from the first two review sessions have not been addressing. Revise and resubmit.
Routing - PLAN CHECK3/21/2019 3/26/2019 FAIL
DetailsJulie Romig
Routing - Design Review3/21/2019 3/21/2019 FAIL
DetailsAndrea Tuning
The applicant should consolidate the parcels into one large parcel or enter into a cross access/shared parking agreement in regard to parking, pedestrian networks and trash collection.
Provide a minimum of 66 bicycle parking spaces on the site with 17 of these spaces being covered. To provide a safe, covered and efficient location for the bicycles, the applicant will be required to design the spaces to be a minimum of 6 feet long and 2.5 feet wide and have an overhead clearance of 7-feet if covered. A 4-foot wide aisle is required between rows of bicycle parking or nearby walls. Stationary racks shall be located on improved non-permeable surfaces and anchored to the ground.
All light poles and fixtures shall be located outside of the required setbacks and landscape planters which contain trees as required by the landscape ordinance. All lighting shall also be designed and located so as to prevent glare or direct light from falling onto adjoining properties or streets. The illumination of all light fixtures shall not exceed two foot candles as measured 1-foot above the ground at property lines shared with residentially zoned or used parcels. All new pole lighting shall feature 100 percent cut-off light fixtures and all new wall lighting shall have full cut-off shields.
Routing - PLAN CHECK3/6/2019 3/19/2019 FAIL
DetailsJulie Romig
Routing PW Sewer Design3/6/2019 3/13/2019 FAIL
DetailsDeAnn Brown
Corrections noted in last review were not included in new set. Please see changemarks for noted corrections/changes.
Routing Off Site - STRUCTURAL3/6/2019 3/12/2019 PASS
DetailsJulie Romig
KPFF 2nd Review
Route to Impact Fee Review2/13/20192/16/20192/14/2019 PASS
DetailsShannon Cade
Review requested for Commercial Permit
1st review completed  2/12/2019 FAIL
DetailsJulie Romig
Routing - PLAN CHECK1/3/2019 2/12/2019 FAIL
DetailsJulie Romig
Routing - FIRE1/2/20191/3/20192/5/2019 PASS
DetailsMark Scharfen
IFC Fire code review complete 02.05.2019.
Routing Off Site - STRUCTURAL1/3/2019 1/16/2019 FAIL
DetailsJulie Romig
KPFF
Routing PW Sewer Design1/10/2019 1/14/2019 FAIL
DetailsDeAnn Brown
See changemarks in eplanreview. Contact DeAnn Brown ###-#### for record drawings.
Routing - Addressing1/3/2019 1/10/2019 PASS
DetailsDoug Chausow
New Building address: 982 N Maple Grove Rd
Routing - PUBLIC WORKS1/3/2019 1/10/2019 PASS
DetailsMorgan Webb
Routing - Erosion and Sediment1/3/2019 1/9/2019 PASS
DetailsAndy J. Long
ESC site map and SWPPP approved. RP tbd, must be provided before permit may be issued . Site preparation inspection is REQUIRED
Routing - MECHANICAL1/3/2019 1/9/2019 PASS
DetailsTroy James
Routing - PLUMBING1/3/2019 1/9/2019 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Routing - Design Review1/3/2019 1/3/2019 FAIL
DetailsAndrea Tuning
The applicant should consolidate the parcels into one large parcel or enter into a cross access/shared parking agreement in regard to parking, pedestrian networks and trash collection.
Provide a minimum of 66 bicycle parking spaces on the site with 17 of these spaces being covered. To provide a safe, covered and efficient location for the bicycles, the applicant will be required to design the spaces to be a minimum of 6 feet long and 2.5 feet wide and have an overhead clearance of 7-feet if covered. A 4-foot wide aisle is required between rows of bicycle parking or nearby walls. Stationary racks shall be located on improved non-permeable surfaces and anchored to the ground.
All light poles and fixtures shall be located outside of the required setbacks and landscape planters which contain trees as required by the landscape ordinance. All lighting shall also be designed and located so as to prevent glare or direct light from falling onto adjoining properties or streets. The illumination of all light fixtures shall not exceed two foot candles as measured 1-foot above the ground at property lines shared with residentially zoned or used parcels. All new pole lighting shall feature 100 percent cut-off light fixtures and all new wall lighting shall have full cut-off shields.
Intake Approval  1/2/2019 PASS
DetailsJoe Bruce
Prescreen approval by JHB
Application received  12/20/2018 DONE
Application submitted via PDS Online on Dec 20 2018 3:07PM
Routing - PLANNING1/3/2019    
Routing PW Solid Waste1/10/2019    
DetailsEvan Carpenter
Routing - PLANNING3/21/2019    
Routing PW Street Lights3/6/2019    
DetailsTom Marshall
Routing - PLANNING3/6/2019    
Routing PW Drainage4/10/2019