Second Notice | | 11/8/2019 | 11/26/2019 | | DONE |
|
|
|
This permit finaled on the web by derek cooper
|
First Notice | | 10/14/2019 | 10/29/2019 | | DONE |
|
|
|
mailed 11-1
|
Permanent Occupancy | | | 10/4/2019 | | DONE |
|
|
|
|
BLD-Final | 10/2/2019 | 10/2/2019 | 10/2/2019 | P | PASS |
Jim Storey
|
|
|
Melvin Phone #: ###-####
|
Print Occupancy Form | | | 10/2/2019 | | DONE |
|
|
|
|
BLD-Final | 9/23/2019 | 9/24/2019 | 9/25/2019 | A | PART |
Jim Storey
|
|
|
Malvin Phone #: ###-#### ada sign back room/ egress lock on back gate.
|
Zoning Approval | 9/23/2019 | 9/23/2019 | 9/23/2019 | | PASS |
KayCee Babb
|
|
|
|
FIRE-Final Inspection | 9/17/2019 | 9/18/2019 | 9/18/2019 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. No card to sign. Melvin Phone #: ###-####
|
FIRE-Final Inspection | 9/10/2019 | 9/11/2019 | 9/11/2019 | A | FAIL |
Troy Cobbley
|
|
|
Relocate the building address so that it is viewable, provide additional exit sign as per approved plans, repair the east end exit discharge light.
Melvin Phone #: ###-####
|
BLD-Final | 9/10/2019 | 9/11/2019 | 9/11/2019 | P | CANC |
Tell Riley
|
|
|
fire life saftey failed Melvin Phone #: ###-####
|
Zoning Approval | 9/11/2019 | 9/11/2019 | 9/11/2019 | | FAIL |
KayCee Babb
|
|
|
Rear landscape area is not complete. Bark mulch was piled in landscape terminals and no Type C shrubs were installed per plans approved through DRH18-00572.
|
BLD-Ceiling Grid Inspection | 8/29/2019 | 8/30/2019 | 8/30/2019 | A | PEND |
Brandon Shaw
|
|
|
Need Ele and Mecg cover appoval...
|
Telephone call | | | 8/20/2019 | | DONE |
|
|
|
spoke with derek and he stated the spa name is Perpetuity Skin + Spa
|
BLD-Ceiling Grid Inspection | 7/17/2019 | 7/18/2019 | 7/18/2019 | A | PASS |
Jim Storey
|
|
|
Melvin Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 6/13/2019 | 6/14/2019 | 6/14/2019 | A | PART |
Jim Storey
|
|
|
Melvin Phone #: ###-#### ok to gyo palls top down to instal hvac and fat grid.
|
BLD-Conference | 5/8/2019 | 5/9/2019 | 5/9/2019 | A | PASS |
Jim Storey
|
|
|
concerned about visibilty to top metal rack // Melvin Phone #: ###-#### top tracks ok to cover/ verify r38
|
Print Occupancy Form | | | 3/28/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 2/25/2019 | | DONE |
|
|
|
Issued CO by mistake
|
Issue PAID IN FULL permit | | | 2/22/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/22/2019 | | DONE |
|
|
|
mistakenly issued CO so finaled date shows. Finaled date will update when CO is correctly issued.//2/22/19 leg
|
Permit Ready to Issue | | | 2/13/2019 | | DONE |
|
|
|
all met-Need
met-ACHD
met-GC Form
met-Revised Cert of Value
|
Plan assigned to (CJW) | 1/22/2019 | 1/22/2019 | 2/12/2019 | | PASS |
Carl Westfall
|
|
|
(1st done) 01/28/19 (L2 - 7 days) (ePlan - 37 sheets) Vista Spa (routed to staff)
|
Routing - PLAN CHECK | 2/11/2019 | | 2/12/2019 | | PASS |
Carl Westfall
|
|
|
Drawings approved with red lines
|
Routing PW Solid Waste | 2/12/2019 | | 2/12/2019 | | PASS |
Evan Carpenter
|
|
|
|
Routing - Design Review | 2/12/2019 | | 2/12/2019 | | PASS |
KayCee Babb
|
|
|
Per DRH18-00572. Case updated with Building requirements and new trash enclosure.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/12/2019 | | DONE |
|
|
|
|
Plan resubmittals received | | | 2/11/2019 | | DONE |
|
|
|
|
Route to Impact Fee Review | 2/2/2019 | 2/5/2019 | 2/4/2019 | | PASS |
Karina Myles
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 2/2/2019 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 2/2/2019 | | DONE |
|
|
|
|
Routing - FIRE | 1/31/2019 | | 2/1/2019 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Routing - PLAN CHECK | 1/22/2019 | | 1/31/2019 | | FAIL |
Carl Westfall
|
|
|
Revised drawings required - called the architect and discussed the plan review report as well as Emailing the report.
|
Routing PW Solid Waste | 1/22/2019 | | 1/25/2019 | | FAIL |
Evan Carpenter
|
|
|
The solid waste enclosure must have at least 12 feet of unobstructed clearance between gate posts, as measured from the innermost points (not the exterior dimensions). The enclosure dimensions on the A001 – SITE PLAN drawing are smaller than shown on the A002 – SITE PLAN DETAILS; these dimensions need to be the same.
|
Routing - MECHANICAL | 1/22/2019 | | 1/24/2019 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 1/22/2019 | | 1/23/2019 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing PW Environmental | 1/22/2019 | | 1/23/2019 | | PASS |
Rick Christenson
|
|
|
|
Routing - Addressing | 1/22/2019 | | 1/22/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 1/22/2019 | | 1/22/2019 | | PASS |
Angela Hardy
|
|
|
|
Routing - Design Review | 1/22/2019 | | 1/22/2019 | | PASS |
KayCee Babb
|
|
|
Per DRH18-00572.
|
Intake Approval | | | 1/18/2019 | | FAIL |
Joe Bruce
|
|
|
1) Form #304 - Registered Design Professional Form.
2) All sheets (including interior design plans) are required to be stamped/signed by and Idaho Licensed Design Professional. Resubmit sheets with seal and signature.
|
Intake Approval | | | 1/18/2019 | | PASS |
Javier Guzman
|
|
|
|
Application received | | | 1/16/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 16 2019 3:59PM
|