BLD-Aging Inspection | 6/26/2020 | 6/26/2020 | 6/30/2020 | | PEND |
Tell Riley
|
|
|
|
Inspection Record Card- Bld | | | 6/30/2020 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 6/4/2020 | | DONE |
|
|
|
|
Plan assigned to (Joe) | 5/7/2020 | 5/7/2020 | 5/13/2020 | | PASS |
Joe Bruce
|
|
|
(plan mod) - Peking Tokyo Asian Bistro
|
Permit Ready to Issue | | | 5/13/2020 | | DONE |
|
|
|
plan mod
|
Routing - MECHANICAL | 5/11/2020 | | 5/12/2020 | | PASS |
Troy James
|
|
|
Relocate RTU on roof
|
Plan Modification Accepted | | | 5/7/2020 | | DONE |
|
|
|
Glen Walker of ADP Architects requested a plan mod to make changes to the mechanical plans. Sheet: M-1.00
|
BLD-Conference | 4/8/2020 | 4/8/2020 | 4/8/2020 | P | DONE |
Tell Riley
|
|
|
conference with contractor, mechanical contractor and inspectors, was scheduled under wrong permit//will need to have calcs and engineers approval and or fix for RTU units that have changed location and size, drawings including mechanical will need to be submitted for plan modification//
|
BLD-Framing/Rough-in | 2/12/2020 | 2/13/2020 | 2/13/2020 | A | PART |
Tell Riley
|
|
|
call ahead // Kent Phone #: ###-####//insulation installed in existing walls that were open //backing added for accesibility requirements//ok to cover vertical wall ONLY//still need mechanical and fire sprinkler sign offs prior to covering any ceilings//no access to fire riser room--also will need inspected for rated walls and penetrations//
|
BLD-Framing/Rough-in | 2/3/2020 | 2/4/2020 | 2/4/2020 | P | FAIL |
Tell Riley
|
|
|
call ahead // Ken Phone #: ###-####//need fire sprinkler roug in completed//add backing for Accessibility//secure demising wall studs//provide wall assembly for 1 hr room at fire riser//
|
Telephone call | | | 2/4/2020 | | |
|
|
|
Marcus - called to change the address on this permit to 3027 n cole rd
|
BLD-Framing/Rough-in | 1/17/2020 | 1/17/2020 | 1/17/2020 | P | PART |
Tell Riley
|
|
|
Ken- please call for access Phone #: ###-####//issues with addresses and permits for this building//told Ken he needs to go downtown and fix address issues//need mechanical permit//ok to insulate exterior walls and one side demising wall//
|
BLD-Framing/Rough-in | 12/26/2019 | 12/26/2019 | 12/26/2019 | P | CANC |
Tell Riley
|
|
|
metal stem wall // Kent Phone #: ###-####/ Ken had questions on demising wall--plans show to underside of roof sheathing--wall stops at roof insulation--refered him to architect//some walls have been one sided--asked him to leave uncovered until all trades passed and framing is approved//
|
BLD-Framing/Rough-in | 11/21/2019 | 11/21/2019 | 11/21/2019 | P | PART |
Tell Riley
|
|
|
Call ahead 30 minutes - truss bracing // Kent Phone #: ###-####truss bracing // Kent Phone #: ###-####//engineering and engineers letter from site visit and approval onsite dated Nov 20, 2019 stamped and signed reviewed onsite//trusses ok per engineer//
|
BLD-Wall Bracing | 11/19/2019 | 11/19/2019 | 11/19/2019 | P | CANC |
Tell Riley
|
|
|
call for keycode access // Kim Phone #: ###-####//CN posted still needs completed//updated engineering needed to reflect what was performed onsite that does not reflect the approved truss fixes//no wall bracing inspection needed at this time//
|
BLD-Framing/Rough-in | 11/6/2019 | 11/7/2019 | 11/7/2019 | A | FAIL |
Tell Riley
|
|
|
ken Phone #: ###-####//CN posted//truss fixes do not all reflect engineered fixes//see CN onsite//
|
CHANGE STATUS TO (ISS) | | | 10/4/2019 | | DONE |
|
|
|
plan mod
|
Print Occupancy Form | | | 10/4/2019 | | DONE |
|
|
|
|
Plan assigned to (JHB) | 9/30/2019 | 9/30/2019 | 10/2/2019 | | PASS |
Joe Bruce
|
|
|
10/07 (plan mod) Peking Tokyo Asian Bistro
|
Routing - PLAN CHECK | 9/30/2019 | | 10/2/2019 | | PASS |
Joe Bruce
|
|
|
Plan modification passes for truss modification to accomodate fire sprinklers.
|
Permit Ready to Issue | | | 10/2/2019 | | DONE |
|
|
|
plan mod accepted
|
Plan Modification Accepted | | | 9/27/2019 | | DONE |
|
|
|
Truss repair for fire sprinkler design
|
Print Occupancy Form | | | 6/13/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 6/13/2019 | | DONE |
|
|
|
|
Meeting | | | 6/10/2019 | | DONE |
|
|
|
emailed glenn the fees due on our end and that we still need a letter from ACHD
|
Plan assigned to (JHB) | 2/19/2019 | 2/20/2019 | 5/22/2019 | | PASS |
Joe Bruce
|
|
|
* 04/26 (4th Rev) 03/13 (L3) Peking Tokyo Asian Bistro, ePlan (Bldg, DR, Mech, Fire)
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/22/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/22/2019 | | DONE |
|
|
|
MET
NEED
ACHD
MET gwalker@adpboise.com
GC form
Revised Certificate of Value
|
Routing - FIRE | 4/22/2019 | 4/22/2019 | 5/20/2019 | | PASS |
Mark Scharfen
|
|
|
04/29-Peking tokyo Asian Bistro MS Resubmittal. Sprinkler agreement recorded. Passed review.
|
Routing - MECHANICAL | 4/22/2019 | | 4/23/2019 | | PASS |
Troy James
|
|
|
|
Plan resubmittals received | | | 4/22/2019 | | DONE |
Joe Bruce
|
|
|
|
Routing - FIRE | 4/3/2019 | 4/3/2019 | 4/8/2019 | | FAIL |
Mark Scharfen
|
|
|
04/08-Still waiting on sprinkler upgrade agreement before passing. Resubmittal required.
|
Plan Reviewer's activity | | | 4/8/2019 | | DONE |
Joe Bruce
|
|
|
Still need upgrade agreement letter for fire sprinklers in the adjacent building.
|
Plan resubmittals requested | | | 4/8/2019 | | DONE |
Joe Bruce
|
|
|
Sent email to Glenn regarding additional items required for resubmittal. **JHB**
|
Routing - PLAN CHECK | 4/3/2019 | | 4/8/2019 | | PASS |
Joe Bruce
|
|
|
|
Routing - MECHANICAL | 4/3/2019 | | 4/8/2019 | | FAIL |
Troy James
|
|
|
|
Routing - Design Review | 4/3/2019 | | 4/3/2019 | | PASS |
Katelyn Menuge
|
|
|
|
Plan resubmittals received | | | 4/3/2019 | | DONE |
Joe Bruce
|
|
|
|
Routing - FIRE | 3/25/2019 | 3/25/2019 | 4/1/2019 | | FAIL |
Mark Scharfen
|
|
|
04/01 Waiting on sprinkler agreement before passing. Resubmittal required.
|
Plan resubmittals requested | | | 4/1/2019 | | DONE |
Joe Bruce
|
|
|
|
Routing - PLAN CHECK | 3/25/2019 | | 3/28/2019 | | FAIL |
Joe Bruce
|
|
|
|
Routing - MECHANICAL | 3/25/2019 | | 3/26/2019 | | FAIL |
Troy James
|
|
|
Previous comments have not been addressed.
|
Plan resubmittals received | | | 3/25/2019 | | DONE |
Joe Bruce
|
|
|
|
Routing - Design Review | 3/25/2019 | | 3/25/2019 | | FAIL |
Katelyn Menuge
|
|
|
Provide height of new rooftop equipment vs height of existing parapet to demonstrate new equipment will be screened from view, or provide additional screening.
|
Route to Impact Fee Review | 3/14/2019 | 3/17/2019 | 3/15/2019 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | 2/19/2019 | 2/19/2019 | 3/14/2019 | | FAIL |
Mark Scharfen
|
|
|
IFC 1st review 03.14.2019.pdf
|
1st review completed | | | 3/14/2019 | | FAIL |
Joe Bruce
|
|
|
|
Plan resubmittals requested | | | 3/14/2019 | | DONE |
Joe Bruce
|
|
|
Emailed plan review report to architect.
|
Routing - PLAN CHECK | 2/19/2019 | | 3/13/2019 | | FAIL |
Joe Bruce
|
|
|
|
Routing - MECHANICAL | 2/19/2019 | | 2/26/2019 | | FAIL |
Troy James
|
|
|
See eplan for corrections
|
Routing PW Environmental | 2/20/2019 | | 2/26/2019 | | PASS |
Terry Alber
|
|
|
Grease abatement approved.
|
Routing - Erosion and Sediment | 2/19/2019 | | 2/26/2019 | | PASS |
Michael Zawacki
|
|
|
TI, no esc plan required.
|
Routing - PLANNING | 2/19/2019 | | 2/25/2019 | | PASS |
Nicolette Womack
|
|
|
|
Plan assigned to (JAR) | 2/19/2019 | 2/19/2019 | 2/20/2019 | | DEFR |
Julie Romig
|
|
|
Peking Yokyo Asian Bistro (L-3)
|
Routing - PLUMBING | 2/19/2019 | | 2/20/2019 | | PASS |
Daryl Spivey
|
|
|
Vent floor drains as required by ISPC and provide tempered water to lavs per ISPC 407.3.
|
Routing - Addressing | 2/19/2019 | | 2/20/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 2/19/2019 | | 2/20/2019 | | PASS |
Angela Hardy
|
|
|
|
Routing - Design Review | 2/19/2019 | | 2/19/2019 | | FAIL |
Andrea Tuning
|
|
|
Please add new rooftop mechanical equipment and any other exterior changes to one of your open DR applications and obtain approval prior to building permit submittal.
|
Intake Approval | | | 2/14/2019 | | PASS |
|
|
|
|
Intake Approval | | | 1/31/2019 | | FAIL |
Joe Bruce
|
|
|
Please provide the following to complete you prescreen:
1) Fill out and upload checklist form #520 into the documents folder. This form must accompany the submittal with all pages completed and filled out with page references. All items required by checklist must be uploaded. A complete prescreen review cannot be completed without the submission of a checklist.
2) COMcheck reports are required to be printed on the plans per the checklist. Upload additional plans with COMcheck reports that are stamped and signed by design professional.
3) Either provide and Erosion and Sediment Control waiver request or provide Erosion and Sediment Control Plans & Narrative for the installation of the grease interceptor in the parking lot. Contact Andy Long ###-#### AJLong@cityofboise.org
4) Provide structural drawings in addition to the submitted structural calculations that reflect the scope of work defined in the calculations. These drawings must be stamped/signed by the structural engineer.
5) Provide approved health department plans and application that shows the Central District Health approval stamp and signature. Upload these documents into the documents folder.
6) Sheet index on the cover page does not include sheet P-1.01. Revise sheet index to include all sheets included in the plans set.
7) Provide a demolition plan.
8) Incorrect codes are noted on the cover sheet for the Mechanical Code and Fuel/Gas Code. See currently adopted codes on our website: https://pds.cityofboise.org/media/1951/currently-adopted-building-codes-12-27-17.pdf
|
Application received | | | 1/29/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 29 2019 2:20PM
|
Agreement of Future work | 5/20/2019 | 3/31/2021 | | | |
Joe Bruce
|
|
|
(PEKING TOKYO ASIAN BISTRO) Upgrade Agreement with outlined outstanding work to be completed with due date of March 31, 2021, attached to this case.
|