Permit Information
Permit NumberBLD19-00526
StatusUnder Review
Name ESI
Site Address 11910 W FAIRVIEW AVE
Project NameVillage East - Building A
Customer NumberBLD19-00526-00536, 538-539
ePlanReviewYes
Description
(13 PERMITS IN EPLAN UNDER BLD19-00526) (VILLAGE EAST – BUILDING A – RESIDENTIAL APARTMENT BUILDING) (PUD18-00042) (DRH18-00528) (4-29-20 PLAN MODIFICATION TO UPDATE THE PLUMBING DRAWINGS TO MATCH MODIFICATIONS IN THE FIELD.) (4-16-20 PLAN MODIFICATION TO CHANGE THE POTABLE WATER PLUMBING SYSTEM FOR ALL APARTMENT UNITS. PEX MANABLOCK MANIFOLDS WILL NOT BE USED.) The NFPA 13-R fire sprinkler system is used for occupancy. To construct a 35,650 square foot, 3 story apartment building (11,950 square foot 1st story, 11,850 square foot 2nd story, and 11,850 square foot 3rd story) with a total of 36 dwelling units (12 on each story). All dwelling units on the 1st story are required to comply as Type B dwelling units (11 Type B and one Type A). Since there is no elevator in this building, the dwelling units located on the 2nd and 3rd stories are not regulated for accessibility to the disabled. Work is to include concrete footings, concrete stem walls between conditioned and unconditioned spaces, concrete pedestals, concrete slab on grade with thickened slab at interior bearing walls and R-10 perimeter slab edge insulation between conditioned and unconditioned spaces, 2x6 walls between conditioned and unconditioned spaces with R-20 cavity insulation, wood columns, shear walls with gypsum panels or structural wood panels and hold downs, an unconditioned fire-resistance-rated corridor on each story, two unconditioned 1-hr fire-resistance-rated exterior stairways, 1-hr dwelling unit separation walls between dwelling units, draftstops in the attic, 1-hr dwelling unit separation floors between dwelling units, engineered wood truss roof system with a structural wood panel roof deck and R-49 insulation installed on top of the ceiling with the attic vented to the outside, roof overbuilds, ladder and roof hatch to access roof top heat pumps, exterior windows, interior doors between conditioned and unconditioned spaces, exterior cementitious lap siding, exterior brick veneer, exterior stucco, guards, handrails, asphalt shingles, 3-ply roofing membrane at flat roof areas, roof drains and overflow drains, interior millwork, and interior finishes. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. The design for the engineered wood trusses is a deferred submittal item. The fire sprinkler system is required to comply with NFPA 13-R and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Routing - Design Review8/4/2020 8/11/2020 PASS
DetailsKatelyn Menuge
Routing PW Sewer Rating8/4/2020 8/10/2020 PASS
DetailsMorgan Webb
Routing - PLAN CHECK8/4/2020 8/5/2020 PASS
DetailsCarl Westfall
Plan mod review approved and drawings routed
Routing - PLAN CHECK8/3/2020 8/4/2020 PASS
DetailsCarl Westfall
Plan intake review approved
Plan resubmittals received  8/3/2020 DONE
Routing - PLAN CHECK7/17/2020 7/20/2020 FAIL
DetailsCarl Westfall
Plan mod plan intake review failed
Plan resubmittals requested  7/20/2020 DONE
Plan Modification Accepted  7/17/2020 DONE
Change to community building, dog washing station, A1.11 A2.6
BLD-Wall cover7/1/20207/2/20207/2/2020APART
DetailsTell Riley
Drop ceiling cover inspection Phone #: ###-#### Inspection requested via web by Travis Blackburn//drops on first floor ok when fire caulk added where discussed//
BLD-Wall cover6/23/20206/24/20206/24/2020APART
DetailsTell Riley
2nd floor drop ceiling inspection for cover. Phone #: ###-#### Inspection requested via web by Travis Blackburn//fur downs ok//fire caulk added while onsite//shear walls--a couple units need edges blocked and nails added--Jon will send pictures of corrections//
BLD-Wall Bracing6/10/20206/11/20206/11/2020PPART
DetailsTell Riley
Gyp shear inspection Phone #: ###-#### Inspection requested via web by Travis Blackburn//screws need to meet 4" oc per plans in units-301,304,305 and 312//third floor inspection only//
BLD-Wall cover6/9/20206/10/20206/10/2020PPART
DetailsTell Riley
3rd floor drop ceiling inspection for cover and gyp shear walls Phone #: ###-#### Inspection requested via web by Travis Blackburn//firecaulk areas noted//move attic access and add gyp//
BLD-Wall Bracing6/8/20206/8/20206/8/2020PPASS
DetailsTell Riley
Additional hardware and hold downs added after the fact Phone #: ###-#### Inspection requested via web by Travis Blackburn//added hold downs and floor to floor strapping--ok//
BLD-Framing/Rough-in6/5/20206/5/20206/5/2020PPART
DetailsTell Riley
Riser room approval for cover Phone #: ###-#### Inspection requested via web by Travis Blackburn//plans show 2x4 framing with R21 insulation--need architect to clarify//
BLD-Energy code compliance5/21/20205/21/20205/21/2020PPART
DetailsTell Riley
1st floor energy inspection for cover Phone #: ###-#### Inspection requested via web by Travis Blackburn//ok, do not cover area where main fire sprinkler lines are cut through joist, waiting for joist repair/approval before cover//
BLD-Framing/Rough-in5/19/20205/19/20205/19/2020PPART
DetailsTell Riley
1st floor reinspect Phone #: ###-#### Inspection requested via web by Travis Blackburn//corretions made from yesterday//still need joist approval for drilled joists for fire sprinkler mains//
BLD-Framing/Rough-in5/18/20205/18/20205/18/2020PNR
DetailsTell Riley
1st floor inspection to allow insulation Phone #: ###-#### Inspection requested via web by Travis Blackburn//too many corrections, will call back in//
BLD-Energy code compliance5/18/20205/18/20205/18/2020PPART
DetailsTell Riley
2nd floor insulation inspection for cover approval Phone #: ###-#### Inspection requested via web by Travis Blackburn//2nd floor energy ok, add in one location as discussed//
BLD-Framing/Rough-in5/12/20205/13/20205/13/2020PPART
DetailsTell Riley
Review framing on corridors at all floors Phone #: ###-#### Inspection requested via web by Travis Blackburn//minor framing corrections and fire caulking needed//jeremy will take photos, all areas are marked on walls in red//
BLD-Framing/Rough-in5/12/20205/12/20205/12/2020PPART
DetailsTell Riley
2nd floor only inspection for approval to insulate Phone #: ###-#### Inspection requested via web by Travis Blackburn//firecaulk areas noted//provide RFI for joist spacing over 16" oc//
BLD-Energy code compliance5/11/20205/11/20205/11/2020PPART
DetailsTell Riley
3rd floor only of A Phone #: ###-#### Inspection requested via web by Travis Blackburn//ok when VB is fixed//
BLD-Framing/Rough-in5/6/20205/6/20205/6/2020PPART
DetailsTell Riley
3rd floor only for approval to insulate Phone #: ###-#### Inspection requested via web by Travis Blackburn//ok to insulate, trades ok, minor framing corrections we will check at energy//
BLD-Framing/Rough-in5/1/20205/4/20205/4/2020APART
DetailsTell Riley
Inspect trusses and hardware at 3rd floor Phone #: ###-#### Inspection requested via web by Travis Blackburn//east half of building//trusses located in wrong areas in corridor need addressed//OG girder hangers and ply connections need addressed//some bracing on trusses, need to add hardware at corridor truss blocking//will need to verify corrections//
BLD-Framing/Rough-in4/30/20205/1/20205/1/2020APART
DetailsTell Riley
Inspect truss bracing and hardware on 3rd floor Phone #: ###-#### Inspection requested via web by Travis Blackburn//truss bracing and layout, see layout sheet for minor corrections, need details on truss clips at walls, ad hardware at blocking along corridors//west half of building was looked at//will need to verify corrections//
OVERRIDE  4/29/2020  
Plan assigned to (CJW)4/24/20204/24/20204/29/2020 PASS
DetailsCarl Westfall
plan mod (plan intake approved)
CHANGE STATUS TO (ISS)  4/29/2020 DONE
Plan Reviewer's activity  4/29/2020 PASS
2nd plan mod review passed
Permit Ready to Issue  4/29/2020 DONE
plan mod approved- DO NOT RE- ISSUE
Routing - PLAN CHECK4/28/2020 4/28/2020 PASS
DetailsCarl Westfall
Back from the permits desk. Plan mod review approved.
Routing - PLUMBING4/28/2020 4/28/2020 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Routing - PLAN CHECK4/24/2020 4/27/2020 PASS
DetailsCarl Westfall
Plan mod plan intake review approved
Plan Modification Accepted  4/24/2020 DONE
Coleen Baker from Glancey Rockwell & Associates requested a plan mod workflow started. Plumbing drawings have been updated to match field modifications and installation.
Sheets: P-1.1.1, P-1.1.2, P-1.3.1, P-1.3.2, P-1.3.3, P-1.3.4
CHANGE STATUS TO (ISS)  4/20/2020 DONE
OVERRIDE  4/16/2020  
Plan assigned to (CJW)4/7/20204/7/20204/16/2020 PASS
DetailsCarl Westfall
plan mod - Village East (routed to staff)
Routing - PLUMBING4/15/2020 4/16/2020 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Plan Reviewer's activity  4/16/2020 PASS
Plan mod review approved
Permit Ready to Issue  4/16/2020 DONE
PLAN MOD MET
Routing - PLAN CHECK4/14/2020 4/15/2020 PASS
DetailsCarl Westfall
Back from the permits desk. Plan mod review approved.
Routing - PLAN CHECK4/9/2020 4/13/2020 PASS
DetailsCarl Westfall
Plan mod plan intake review approved. To permits desk.
Plan Modification Accepted  4/7/2020 DONE
the plumbing contractor has removed the PEX manifold system and installed a traditional water distribution system. Sheets: P0.0, P4.1, P4.2, P4.3, P4.41
Routing - PLAN CHECK4/24/2020 4/7/2020 PASS
DetailsCarl Westfall
2nd plan mod plan intake review approved
BLD-Framing/Rough-in3/18/20203/19/20203/19/2020ADONE
DetailsTell Riley
Inspection for prerock areas behind tubs only. Phone #: ###-#### Inspection requested via web by Travis Blackburn
BLD-Wall Bracing1/27/20201/28/20201/28/2020PPASS
DetailsMike Jordan
Exterior hardware inspection to include floor to floor straps and H2.5''s that will cover with soffit on balconies and breezeways Phone #: ###-#### Inspection requested via web by Travis Blackburn. floor to floor straps istalled. H2.5 installed at 3rd floor balcony areas.
BLD-Wall Bracing1/27/20201/27/20201/27/2020PPART
DetailsTell Riley
Shear inspection of exterior panels on bldg A. Phone #: ###-#### Inspection requested via web by Travis Blackburn//need to add nails in areas discussed at area 4//need to add hot dip galvanized nails at PT//
BLD-Concrete12/6/201912/9/201912/9/2019APART
DetailsTell Riley
We are pouring the patio slabs for building A and K at 10 AM on Monday. Phone #: ###-#### Inspection requested via web by Matt Perry//ok pending specials//WIP//
BLD-Concrete10/23/201910/24/201910/24/2019APASS
DetailsTell Riley
Special Inspection on site for reinforcement and concrete testing. Concrete scheduled for 6:30am. I will also take pictures for your reference and see what we can see when you arrive. Phone #: ###-#### Inspection requested via web by Travis Blackburn//pass pending specials//
BLD-Foundation10/3/201910/3/201910/3/2019PPASS
DetailsTell Riley
Pouring stem walls at 1pm Phone #: ###-#### Inspection requested via web by Travis Blackburn//ok pending specials//
BLD-Footing9/30/20199/30/20199/30/2019PPASS
DetailsTell Riley
2nd half of building footings//bar ok--ok to pour pending specials inspections//
BLD-Footing9/24/20199/25/20199/25/2019PPART
DetailsTell Riley
Concrete is scheduled for 2pm Phone #: ###-#### Inspection requested via web by Travis Blackburn//only half of the footing is complete//ok per plans//pending specials//
Place hold on job8/14/2019 8/15/2019 DONE
DetailsBrittany Hill
MAKE SURE PLAN REVIEW FEES ARE PAID FOR BLD19-00537 (WENT THROUGH REVIEW BEFORE VOIDING)
Issue PAID IN FULL permit  8/15/2019 DONE
Print Occupancy Form  8/15/2019 DONE
OVERRIDE  8/14/2019  
OVERRIDE  8/13/2019  
Permit Ready to Issue  8/13/2019 DONE
**MAKE SURE BLD19-00537 INTAKE FEES ARE PAID** DO NOT ISSUE WITHOUT OHTER 13 PERMITS AND VOIDED PERMIT HAS PLAN CHECK FEES
MET
NEED
RP
GC
Revised Certificate of Value
Plan assigned to (CJW)3/11/20193/11/20198/10/2019 PASS
DetailsCarl Westfall
* (2nd done) 04/08/19 (new buildings - 25 days) (eplan - 223 sheets) Village East Apartments (A) (approved pending structural)
PLANS/APPL TAKEN TO FRONT DESK  8/10/2019 DONE
Routing Off Site - STRUCTURAL7/31/2019 8/9/2019 PASS
DetailsCarl Westfall
Cory Harelson (KPFF)
Routing - PLANNING7/31/2019 8/8/2019 PASS
DetailsLeon Letson
Routing - Design Review7/31/2019 8/5/2019 PASS
DetailsAndrea Tuning
Routing - MECHANICAL7/30/2019 8/1/2019 PASS
DetailsTroy James
so you can move your red lines
Routing - PLAN CHECK7/30/2019 7/31/2019 PASS
DetailsCarl Westfall
All permits approved pending structural
Plan resubmittals received  7/30/2019 DONE
DetailsCarl Westfall
Plan resubmittals requested  7/20/2019 DONE
Took 2 weeks for the resubmittal review. Lots of sheets to go through and several items were not resolved.
Routing - PLAN CHECK7/8/2019 7/20/2019 FAIL
DetailsCarl Westfall
Do not approved until all permits are approved. CJW
Routing - FIRE7/9/20197/9/20197/16/2019 PASS
DetailsMark Scharfen
07.16.2019-Villiage East A fire review complete. All permits ok on fire. Uploaded rev_fire 07.16.2019.pdf.
Routing Off Site - STRUCTURAL7/9/2019 7/16/2019 FAIL
DetailsCarl Westfall
Cory Harelson (KPFF)
Routing PW Drainage7/9/2019 7/15/2019 PASS
DetailsBrian Murphy
Do not approved until all permits are approved. CJW
Routing - Design Review7/9/2019 7/9/2019 FAIL
DetailsAndrea Tuning
A total of 272 bicycle parking spaces will be required. A minimum of 68 of the bicycle parking spaces are required to be covered. To provide a safe, covered and efficient location for the bicycles, design the spaces to be a minimum of 6-feet long and 2.5 feet wide and have an overhead clearance of 7-feet if covered. A 4-foot wide aisle is required between rows of bicycle parking or nearby walls. Stationary racks shall be located on improved non-permeable surfaces and anchored to the ground. A detail of the rack and how it is attached to the wall should be submitted with the building permit.

Provide an easement for portions of the Valley Regional transit stop located on private property.
Routing PW Street Lights7/9/2019 7/9/2019 PASS
DetailsTom Marshall
Do not approved until all permits are approved. CJW
Routing - PLANNING7/9/2019 7/9/2019 FAIL
DetailsLeon Letson
Plan resubmittals received  7/8/2019 DONE
Plan resubmittals requested  6/26/2019 DONE
Evidently the 2nd submission was not complete. Routed back to the Architect so that he could upload missing sheets.
Routing - PLAN CHECK6/11/2019 6/26/2019 FAIL
DetailsCarl Westfall
Do not approved until all permits are approved. CJW
Routing - FIRE6/13/20196/13/20196/24/2019 FAIL
DetailsMark Scharfen
06/26-Village East Building A Resubmittal-MS Site Grading issues.
Routing Off Site - STRUCTURAL6/13/2019 6/24/2019 FAIL
DetailsCarl Westfall
Cory Harelson (KPFF) Do not approved until all permits are approved. CJW
Routing - PLANNING6/13/2019 6/24/2019 FAIL
DetailsLeon Letson
Do not approved until all permits are approved. CJW
Routing PW Drainage6/13/2019 6/21/2019 FAIL
DetailsBrian Murphy
Do not approved until all permits are approved. CJW need apdx j
Routing - Design Review6/13/2019 6/17/2019 FAIL
DetailsAndrea Tuning
A total of 272 bicycle parking spaces will be required. A minimum of 68 of the bicycle parking spaces are required to be covered. To provide a safe, covered and efficient location for the bicycles, design the spaces to be a minimum of 6-feet long and 2.5 feet wide and have an overhead clearance of 7-feet if covered. A 4-foot wide aisle is required between rows of bicycle parking or nearby walls. Stationary racks shall be located on improved non-permeable surfaces and anchored to the ground. A detail of the rack and how it is attached to the wall should be submitted with the building permit.

Vertical curbing shall be utilized adjacent to all landscaping and pedestrian walk ways. Permanent wheel restraints may be utilized in lieu of curbing adjacent to pedestrian walk ways.

All interior and terminal planter islands shall provide at least one Class II tree within all of the interior and terminal planters.

Provide an easement for portions of the Valley Regional transit stop located on private property.

Continue to work with staff to provide a cohesive and quality exterior building design in regard to material breaks, the application of brick on each building and the color palette for the development. This may include providing a brick wainscot or brick corner elements on each building, reevaluating the location of material breaks and further refining the color palette.

Employ techniques to recess windows above the ground floor a minimum of 2-inches from the façade or incorporated window trim at least 4-inches in width. Submit a window detail showing this recess.
Routing PW Street Lights6/13/2019 6/13/2019 FAIL
DetailsTom Marshall
Do not approved until all permits are approved. CJW
Plan resubmittals received  6/11/2019 DONE
Route to Impact Fee Review4/12/20194/15/20194/16/2019 PASS
DetailsKarina Myles
Review requested for Commercial Permit
Routing - FIRE3/11/20193/11/20194/12/2019 FAIL
DetailsMark Scharfen
IFC 1st Review 04.12.2019.pdf uploaded. Emailed report to architecht.
Routing - PLAN CHECK3/11/2019 4/12/2019 FAIL
DetailsCarl Westfall
Revised drawings required
1st review completed  4/12/2019 DONE
Routing Off Site - STRUCTURAL3/11/2019 3/27/2019 FAIL
DetailsCarl Westfall
Cory Harelson (KPFF)
Routing - Erosion and Sediment3/11/2019 3/27/2019 PASS
DetailsAndy J. Long
SWPPP and ESC site map approved. Certified Plan Designer; onsite ESC Responsible Person is TBD. Site preparation inspection prior to significant earthwork is REQUIRED.
Routing PW Sewer Design3/12/2019 3/26/2019 PASS
DetailsDeAnn Brown
Routing PW Solid Waste3/12/2019 3/21/2019 PASS
DetailsEvan Carpenter
Routing PW Drainage3/12/2019 3/21/2019 FAIL
DetailsBrian Murphy
NEED APDX J
Routing - PLANNING3/11/2019 3/19/2019 FAIL
DetailsLeon Letson
See DR comments
Routing - MECHANICAL3/11/2019 3/15/2019 PASS
DetailsTroy James
Routing - PLUMBING3/11/2019 3/15/2019 PASS
DetailsDaryl Spivey
Meet suds relief requirements and per ISPC.
Routing - Design Review3/11/2019 3/13/2019 FAIL
DetailsAndrea Tuning
A total of 272 bicycle parking spaces will be required. A minimum of 68 of the bicycle parking spaces are required to be covered. To provide a safe, covered and efficient location for the bicycles, design the spaces to be a minimum of 6-feet long and 2.5 feet wide and have an overhead clearance of 7-feet if covered. A 4-foot wide aisle is required between rows of bicycle parking or nearby walls. Stationary racks shall be located on improved non-permeable surfaces and anchored to the ground.
b. Remove the existing sidewalk on Fairview Avenue and replace it with a new 5-foot wide concrete detached sidewalk located in its ideal location. This location will be determined prior to the issuance of any building permits.
Provide a recorded cross access agreement from the owner to the east to allow the connection from this development to Dawn Drive.
Provide a 5-foot wide concrete pedestrian connection that will extend from Building A to Fairview Avenue.
Provide a 5-foot wide concrete pedestrian connection that will extend from Building B to Fairview Avenue.
Provide a 15-foot rear setback (north) and a 5-foot side setback (east) for the trash enclosure located in the northeast corner of the site.
Stripe the standard parking stalls as 20-foot deep stalls or provide a 7-foot setback along the east and west property lines where a bumper overhang has been proposed.
A 6-foot wide concrete sidewalk is required in all locations where an 18-foot deep parking stall is located adjacent to a sidewalk.
All compact parking spaces shall be clearly identified.
Construct the interior and terminal planter islands to be a minimum of 8-feet in width (measured inside of curb to inside of curb) and provide at least one Class II tree within all of the interior and terminal planters.
Revise the site and landscape plan to identify the Valley Ride Regional Transit bus stop on Fairview Avenue.
Provide an easement for portions of the transit stop located on private property.
The vinyl fence shall not be white in color.
Continue to work with staff to provide a cohesive and quality exterior building design in regard to material breaks, the application of brick on each building and the color palette for the development. This may include providing a brick wainscot or brick corner elements on each building, reevaluating the location of material breaks and further refining the color palette.
Employ techniques to recess windows above the ground floor a minimum of 2-inches from the façade or incorporated window trim at least 4-inches in width.
All light poles and fixtures shall be located outside of landscape planters which contain trees as required by the landscape ordinance. All lighting shall also be designed and located so as to prevent glare or direct light from falling onto adjoining properties or streets. The illumination of all light fixtures shall not exceed two foot candles as measured one foot above the ground at property lines shared with residentially zoned or used parcels.
Carports have not been reviewed and approved with this application. If carports are to be provided within the project, the applicant will be required to submit a design review application for the carport structures. Also, all drive aisles are required to be 24-feet in width between building appurtenances such as carport overhangs.
Routing - Addressing3/11/2019 3/12/2019 PASS
DetailsDoug Chausow
Bldg A: 11910 W Fairview Ave
Routing - PUBLIC WORKS3/11/2019 3/12/2019 PASS
DetailsAngela Hardy
Routing PW Street Lights3/12/2019 3/12/2019 FAIL
DetailsTom Marshall
Corrections required E1.0 & E3.8
Intake Approval  3/5/2019 PASS
Intake Approval  3/1/2019 FAIL
DetailsJoe Bruce
Please provide the following to complete your prescreen:
1) The General Notes on sheet G-0.1 lists the 2012 International Fire Code. The city of Boise has adopted the 2015 IFC. Please update codes on sheet G-0.1
2) Plan sheets do not have the required space reserved for City approval stamps as specified in the Electronic Plans Submittal Standards. Revise sheets with a blank 4” x 2” (4"x4" on cover) space located 3” off the right sheet edge to allow for the title block. Verify ALL plan sheets have the required space for city approval stamp. See this pdf on our website for more info: https://pds.cityofboise.org/media/464072/pdox86_electronic_standards_full_050718.pdf
Application received  2/21/2019 DONE
Application submitted via PDS Online on Feb 21 2019 5:02PM
Plan assigned to (CJW)7/17/20207/17/2020   
DetailsCarl Westfall
plan mod for clubhouse (BLD19-00536) and deferred submittal of Village East carport design (BLD19-00538) (routed to staff)
Routing Off Site - STRUCTURAL8/4/2020    
Cory Harelson (KPFF) Deferred submittal and plan mod