CHANGE STATUS TO (ISS) | | | 8/12/2020 | | DONE |
|
|
|
Status altered after DR routing added and completed - permit needs to stay in issued status.
|
Routing - Design Review | 8/11/2020 | | 8/11/2020 | | PASS |
Katelyn Menuge
|
|
|
|
BLD-Wall Bracing | 7/23/2020 | 7/23/2020 | 7/23/2020 | P | PASS |
Tell Riley
|
|
|
Interior gype shear walls all floors . Phone #: ###-#### Inspection requested via web by Lee Scott//nailing ok on interior shear walls//
|
BLD-Other | 7/22/2020 | 7/23/2020 | 7/23/2020 | A | PART |
Tell Riley
|
|
|
Ok to cover drop ceilings levels 1 and 2 . Phone #: ###-#### Inspection requested via web by Lee Scott//drops ok to cover//lee will verify that mechanical is fire caulked on floor 2 and fire sprinkler mains into riser room are fire caulked//
|
BLD-Wall cover | 7/13/2020 | 7/14/2020 | 7/14/2020 | P | PART |
Tony Young
|
|
|
Drop ceiling inspection on 3rd and 4th floors Phone #: ###-#### Inspection requested via web by Travis Blackburn// 3rd a nd 4th ok
|
BLD-Framing/Rough-in | 7/1/2020 | 7/2/2020 | 7/2/2020 | A | PART |
Tell Riley
|
|
|
Corridor cover inspection Phone #: ###-#### Inspection requested via web by Travis Blackburn//corridors ok//trades passed//fire caulk installed//
|
BLD-Energy code compliance | 6/26/2020 | 6/26/2020 | 6/26/2020 | P | PART |
Tell Riley
|
|
|
INsulation inspection for 1st and 2nd floor approval for cover Phone #: ###-#### Inspection requested via web by Travis Blackburn//framing corrections made//stuff insulation around vent pipes//
|
BLD-Framing/Rough-in | 6/22/2020 | 6/23/2020 | 6/23/2020 | A | PART |
Tell Riley
|
|
|
Framing on 1st and 2nd floor for approval to insulate Phone #: ###-#### Inspection requested via web by Travis Blackburn//add studs at locations marked//fire caulk where marked//address joist cut in unit 102//ok to insulate only//
|
BLD-Energy code compliance | 6/19/2020 | 6/19/2020 | 6/19/2020 | P | PART |
Tell Riley
|
|
|
3rd and 4th floor for cover Phone #: ###-#### Inspection requested via web by Travis Blackburn//ok after plumbing is fire caulked as discussed//
|
BLD-Framing/Rough-in | 6/15/2020 | 6/16/2020 | 6/16/2020 | A | PART |
Tell Riley
|
|
|
Inspection on 3rd and 4th floor for approval to insulate Phone #: ###-#### Inspection requested via web by Travis Blackburn//ok to insulate//need fire approval//add firecaulk as discussed//fix studs//shear ok//
|
BLD-Framing/Rough-in | 6/10/2020 | 6/11/2020 | 6/11/2020 | P | PART |
Tell Riley
|
|
|
Inspect Holddowns at 1st floor and interior shear Phone #: ###-#### Inspection requested via web by Travis Blackburn//hold downs ok--tighten nut in one location//shear walls need nails added to meet 3" oc requirement--call back in and check floor to floor strapping all levels//
|
BLD-Framing/Rough-in | 6/8/2020 | 6/8/2020 | 6/8/2020 | P | NR |
Tell Riley
|
|
|
Corridor framing inspection preliminary of framing Phone #: ###-#### Inspection requested via web by Travis Blackburn//add nails to hangers//addhorizontal hold down where missing//fire caulk penetrations//verify trades inspections approved//
|
BLD-Framing/Rough-in | 6/5/2020 | 6/5/2020 | 6/5/2020 | P | PART |
Tell Riley
|
|
|
Sturctural inspection on trusses and hardware. Would also like to look at riser room on A to insulate and rock Phone #: ###-#### Inspection requested via web by Travis Blackburn//add scab to C3G trusses per truss docs//other trusses ok//
|
BLD-Framing/Rough-in | 6/3/2020 | 6/3/2020 | 6/4/2020 | P | CANC |
Tell Riley
|
|
|
|
BLD-Framing/Rough-in | 6/2/2020 | 6/3/2020 | 6/3/2020 | A | CANC |
Tell Riley
|
|
|
Inspection of truss bracing and plate fastening/HD''s Phone #: ###-#### Inspection requested via web by Travis Blackburn
|
BLD-Framing/Rough-in | 5/21/2020 | 5/21/2020 | 5/21/2020 | P | PART |
Tell Riley
|
|
|
Prerock areas at exterior walls on 1st -3rd floors Phone #: ###-#### Inspection requested via web by Travis Blackburn//ok when anchor bolts are added at first floor shear walls//
|
BLD-Framing/Rough-in | 3/26/2020 | 3/27/2020 | 3/27/2020 | A | PART |
Tell Riley
|
|
|
Framing inspection at breezeway ceiling to install shaftliner assembly to bottom of trusses Phone #: ###-#### Inspection requested via web by Travis Blackburn//ok when H2.5s are installed//
|
BLD-Wall Bracing | 2/17/2020 | 2/18/2020 | 2/18/2020 | A | PART |
Tell Riley
|
|
|
Shear nail and hardware to install weather barrier, windows and soffit and fascia Phone #: ###-#### Inspection requested via web by Travis Blackburn//exterior nailing and strapping ok//
|
BLD-Wall Bracing | 2/13/2020 | 2/14/2020 | 2/14/2020 | P | NR |
Tell Riley
|
|
|
Exterior shear inspection including hardware if time allows Phone #: ###-#### Inspection requested via web by Travis Blackburn//need to renail the fist 2 stories, nails are over driven//
|
BLD-Concrete | 10/29/2019 | 10/30/2019 | 10/30/2019 | P | PART |
Tell Riley
|
|
|
Slab for building L getting poured Thursday at 6:30am Phone #: ###-#### Inspection requested via web by Matt Perry//blankets onsite//pour will be early in the am//pending special inspection and approval//
|
BLD-Concrete | 10/9/2019 | 10/14/2019 | 10/14/2019 | A | PART |
Tell Riley
|
|
|
We are pouring the stem walls for Building L (This building at 1pm. Phone #: ###-#### Inspection requested via web by Matt Perry//need to meet bar clearances//specials will be completed//ok when specials pass//
|
BLD-Footing | 10/8/2019 | 10/8/2019 | 10/8/2019 | P | PASS |
Tell Riley
|
|
|
Concrete pour at 1pm Phone #: ###-#### Inspection requested via web by Travis Blackburn//footings ok per plans//pending specials....//
|
Issue PAID IN FULL permit | | | 8/15/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/15/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/13/2019 | | DONE |
|
|
|
DO NOT ISSUE WITHOUT OHTER 13 PERMITS AND VOIDED PERMIT HAS PLAN CHECK FEES
met
RP
GC
Revised Certificate of Value
|
Routing PW Street Lights | 8/12/2019 | | 8/12/2019 | | PASS |
Tom Marshall
|
|
|
|
Plan assigned to (CJW) | 3/11/2019 | 3/11/2019 | 8/10/2019 | | PASS |
Carl Westfall
|
|
|
* (2nd done) 04/08/19 (new buildings - 25 days) (eplan) Village East Apartments (L) (approved pending structural)
|
Plan Reviewer's activity | | | 8/10/2019 | | DONE |
|
|
|
See the routing under permit BLD19-00526 for all buildings.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/10/2019 | | DONE |
|
|
|
|
Routing - Design Review | 8/5/2019 | | 8/5/2019 | | PASS |
Andrea Tuning
|
|
|
|
Routing - FIRE | 7/9/2019 | 7/9/2019 | 7/16/2019 | | PASS |
Mark Scharfen
|
|
|
07/16-Village East Building L resubmittal. MS. Completed fire review, uploaded rev_fire 07.16.2019.pdf. All permits approved on job for fire.
|
Routing PW Drainage | 7/15/2019 | | 7/15/2019 | | PASS |
Brian Murphy
|
|
|
|
Plan resubmittals received | | | 7/8/2019 | | DONE |
|
|
|
See the routing under permit BLD19-00526 for the 3rd plan review. None of the permits can be issued until all plan reviews are approved. CJW
|
Routing - FIRE | 6/13/2019 | 6/13/2019 | 6/24/2019 | | FAIL |
Mark Scharfen
|
|
|
06/26-Village East building L resubmittal MS. completed fire review. uploaded rev_fire 06.24.2019.pdf and emailed architect.
|
Routing - Design Review | 6/17/2019 | | 6/17/2019 | | FAIL |
Andrea Tuning
|
|
|
A total of 272 bicycle parking spaces will be required. A minimum of 68 of the bicycle parking spaces are required to be covered. To provide a safe, covered and efficient location for the bicycles, design the spaces to be a minimum of 6-feet long and 2.5 feet wide and have an overhead clearance of 7-feet if covered. A 4-foot wide aisle is required between rows of bicycle parking or nearby walls. Stationary racks shall be located on improved non-permeable surfaces and anchored to the ground. A detail of the rack and how it is attached to the wall should be submitted with the building permit.
Vertical curbing shall be utilized adjacent to all landscaping and pedestrian walk ways. Permanent wheel restraints may be utilized in lieu of curbing adjacent to pedestrian walk ways.
All interior and terminal planter islands shall provide at least one Class II tree within all of the interior and terminal planters.
Provide an easement for portions of the Valley Regional transit stop located on private property.
Continue to work with staff to provide a cohesive and quality exterior building design in regard to material breaks, the application of brick on each building and the color palette for the development. This may include providing a brick wainscot or brick corner elements on each building, reevaluating the location of material breaks and further refining the color palette.
Employ techniques to recess windows above the ground floor a minimum of 2-inches from the façade or incorporated window trim at least 4-inches in width. Submit a window detail showing this recess.
|
Plan Reviewer's activity | | | 6/13/2019 | | DONE |
|
|
|
See the routing under permit BLD19-00526 for the 2nd plan review. None of the permits can be issued until all plan reviews are approved. CJW
|
Route to Impact Fee Review | 5/10/2019 | 5/13/2019 | 5/10/2019 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - PLAN CHECK | 3/11/2019 | | 5/7/2019 | | FAIL |
Carl Westfall
|
|
|
|
1st review completed | | | 5/7/2019 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 5/7/2019 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 4/9/2019 | | 4/25/2019 | | PASS |
Andy J. Long
|
|
|
see ESC19-00181 for details
|
Routing - FIRE | 4/9/2019 | 4/9/2019 | 4/12/2019 | | FAIL |
Mark Scharfen
|
|
|
IFC 1st review 04.12.2019.pdf
|
Routing Off Site - STRUCTURAL | 4/9/2019 | | 3/27/2019 | | FAIL |
Carl Westfall
|
|
|
|
Routing PW Sewer Design | 3/12/2019 | | 3/26/2019 | | PASS |
DeAnn Brown
|
|
|
|
Routing PW Solid Waste | 3/12/2019 | | 3/21/2019 | | PASS |
Evan Carpenter
|
|
|
|
Routing PW Drainage | 3/12/2019 | | 3/21/2019 | | FAIL |
Brian Murphy
|
|
|
|
Routing - PLANNING | 3/19/2019 | | 3/19/2019 | | FAIL |
Leon Letson
|
|
|
See DR comments
|
Routing - MECHANICAL | 3/11/2019 | | 3/15/2019 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 3/11/2019 | | 3/15/2019 | | PASS |
Daryl Spivey
|
|
|
|
Routing - Design Review | 3/11/2019 | | 3/13/2019 | | FAIL |
Andrea Tuning
|
|
|
|
Routing PW Street Lights | 3/12/2019 | | 3/12/2019 | | FAIL |
Tom Marshall
|
|
|
|
Routing - Addressing | 3/12/2019 | | 3/12/2019 | | PASS |
Doug Chausow
|
|
|
Bldg L: 11916 W Fairview Ave
|
Routing - PUBLIC WORKS | 3/12/2019 | | 3/12/2019 | | PASS |
Angela Hardy
|
|
|
|
Intake Approval | | | 3/5/2019 | | PASS |
|
|
|
|
Application received | | | 2/21/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 21 2019 5:02PM
|