Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD19-00535
StatusIssued
Name ESI
Site Address 11916 W FAIRVIEW AVE
Project NameVillage East - Building L
Customer NumberBLD19-00526-00536, 538-539
ePlanReviewNo
Description
(13 PERMITS IN EPLAN UNDER BLD19-00526) (BUILING L – VILLAGE EAST APARTMENTS – RESIDENTIAL) (PUD18-00042) (DRH18-00528) The NFPA 13-R fire sprinkler system is used for occupancy and for story increase. To construct a 22,793 square foot, 4 story apartment building (5,959 square foot 1st story, 5,959 square foot 2nd story, 5,959 square foot 3rd story, and 4,916 square foot 4th story) with a total of 16 dwelling units (4 on each story). All dwelling units on the 1st story are required to comply as Type B dwelling units (one is also required to comply as Type A in Building G and in Building K). Since there is no elevator in this building, the dwelling units located on the 2nd, 3rd and 4th stories are not regulated for accessibility to the disabled. Work is to include concrete footings, concrete stem walls between conditioned and unconditioned spaces, concrete pedestals, concrete slab on grade with thickened slab at interior bearing walls and R-10 perimeter slab edge insulation between conditioned and unconditioned spaces, 2x6 walls between conditioned and unconditioned spaces with R-20 cavity insulation and R-3.8 continuous insulation, wood columns, shear walls with gypsum panels or structural wood panels and hold downs, an unconditioned 1-hr fire-resistance-rated corridor on each story, two unconditioned 2-hr fire-resistance-rated exterior stairways, 1-hr dwelling unit separation walls between dwelling units, draftstops in the attic, 1-hr dwelling unit separation floors between dwelling units, engineered wood truss roof system with a structural wood panel roof deck and R-49 insulation installed on top of the ceiling with the attic vented to the outside, roof overbuilds, ladder and roof hatch to access roof top heat pumps, exterior windows, interior doors between conditioned and unconditioned spaces, exterior cementitious lap siding, exterior brick veneer, exterior stucco, guards, handrails, asphalt shingles, 3-ply roofing membrane at flat roof areas, roof drains and overflow drains, interior millwork, and interior finishes. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. The design for the engineered wood trusses is a deferred submittal item. The fire sprinkler system is required to comply with NFPA 13-R and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
CHANGE STATUS TO (ISS)  8/12/2020 DONE
Status altered after DR routing added and completed - permit needs to stay in issued status.
Routing - Design Review8/11/2020 8/11/2020 PASS
DetailsKatelyn Menuge
BLD-Wall Bracing7/23/20207/23/20207/23/2020PPASS
DetailsTell Riley
Interior gype shear walls all floors . Phone #: ###-#### Inspection requested via web by Lee Scott//nailing ok on interior shear walls//
BLD-Other7/22/20207/23/20207/23/2020APART
DetailsTell Riley
Ok to cover drop ceilings levels 1 and 2 . Phone #: ###-#### Inspection requested via web by Lee Scott//drops ok to cover//lee will verify that mechanical is fire caulked on floor 2 and fire sprinkler mains into riser room are fire caulked//
BLD-Wall cover7/13/20207/14/20207/14/2020PPART
DetailsTony Young
Drop ceiling inspection on 3rd and 4th floors Phone #: ###-#### Inspection requested via web by Travis Blackburn// 3rd a nd 4th ok
BLD-Framing/Rough-in7/1/20207/2/20207/2/2020APART
DetailsTell Riley
Corridor cover inspection Phone #: ###-#### Inspection requested via web by Travis Blackburn//corridors ok//trades passed//fire caulk installed//
BLD-Energy code compliance6/26/20206/26/20206/26/2020PPART
DetailsTell Riley
INsulation inspection for 1st and 2nd floor approval for cover Phone #: ###-#### Inspection requested via web by Travis Blackburn//framing corrections made//stuff insulation around vent pipes//
BLD-Framing/Rough-in6/22/20206/23/20206/23/2020APART
DetailsTell Riley
Framing on 1st and 2nd floor for approval to insulate Phone #: ###-#### Inspection requested via web by Travis Blackburn//add studs at locations marked//fire caulk where marked//address joist cut in unit 102//ok to insulate only//
BLD-Energy code compliance6/19/20206/19/20206/19/2020PPART
DetailsTell Riley
3rd and 4th floor for cover Phone #: ###-#### Inspection requested via web by Travis Blackburn//ok after plumbing is fire caulked as discussed//
BLD-Framing/Rough-in6/15/20206/16/20206/16/2020APART
DetailsTell Riley
Inspection on 3rd and 4th floor for approval to insulate Phone #: ###-#### Inspection requested via web by Travis Blackburn//ok to insulate//need fire approval//add firecaulk as discussed//fix studs//shear ok//
BLD-Framing/Rough-in6/10/20206/11/20206/11/2020PPART
DetailsTell Riley
Inspect Holddowns at 1st floor and interior shear Phone #: ###-#### Inspection requested via web by Travis Blackburn//hold downs ok--tighten nut in one location//shear walls need nails added to meet 3" oc requirement--call back in and check floor to floor strapping all levels//
BLD-Framing/Rough-in6/8/20206/8/20206/8/2020PNR
DetailsTell Riley
Corridor framing inspection preliminary of framing Phone #: ###-#### Inspection requested via web by Travis Blackburn//add nails to hangers//addhorizontal hold down where missing//fire caulk penetrations//verify trades inspections approved//
BLD-Framing/Rough-in6/5/20206/5/20206/5/2020PPART
DetailsTell Riley
Sturctural inspection on trusses and hardware. Would also like to look at riser room on A to insulate and rock Phone #: ###-#### Inspection requested via web by Travis Blackburn//add scab to C3G trusses per truss docs//other trusses ok//
BLD-Framing/Rough-in6/3/20206/3/20206/4/2020PCANC
DetailsTell Riley
BLD-Framing/Rough-in6/2/20206/3/20206/3/2020ACANC
DetailsTell Riley
Inspection of truss bracing and plate fastening/HD''s Phone #: ###-#### Inspection requested via web by Travis Blackburn
BLD-Framing/Rough-in5/21/20205/21/20205/21/2020PPART
DetailsTell Riley
Prerock areas at exterior walls on 1st -3rd floors Phone #: ###-#### Inspection requested via web by Travis Blackburn//ok when anchor bolts are added at first floor shear walls//
BLD-Framing/Rough-in3/26/20203/27/20203/27/2020APART
DetailsTell Riley
Framing inspection at breezeway ceiling to install shaftliner assembly to bottom of trusses Phone #: ###-#### Inspection requested via web by Travis Blackburn//ok when H2.5s are installed//
BLD-Wall Bracing2/17/20202/18/20202/18/2020APART
DetailsTell Riley
Shear nail and hardware to install weather barrier, windows and soffit and fascia Phone #: ###-#### Inspection requested via web by Travis Blackburn//exterior nailing and strapping ok//
BLD-Wall Bracing2/13/20202/14/20202/14/2020PNR
DetailsTell Riley
Exterior shear inspection including hardware if time allows Phone #: ###-#### Inspection requested via web by Travis Blackburn//need to renail the fist 2 stories, nails are over driven//
BLD-Concrete10/29/201910/30/201910/30/2019PPART
DetailsTell Riley
Slab for building L getting poured Thursday at 6:30am Phone #: ###-#### Inspection requested via web by Matt Perry//blankets onsite//pour will be early in the am//pending special inspection and approval//
BLD-Concrete10/9/201910/14/201910/14/2019APART
DetailsTell Riley
We are pouring the stem walls for Building L (This building at 1pm. Phone #: ###-#### Inspection requested via web by Matt Perry//need to meet bar clearances//specials will be completed//ok when specials pass//
BLD-Footing10/8/201910/8/201910/8/2019PPASS
DetailsTell Riley
Concrete pour at 1pm Phone #: ###-#### Inspection requested via web by Travis Blackburn//footings ok per plans//pending specials....//
Issue PAID IN FULL permit  8/15/2019 DONE
Print Occupancy Form  8/15/2019 DONE
Permit Ready to Issue  8/13/2019 DONE
DO NOT ISSUE WITHOUT OHTER 13 PERMITS AND VOIDED PERMIT HAS PLAN CHECK FEES
met
RP
GC
Revised Certificate of Value
Routing PW Street Lights8/12/2019 8/12/2019 PASS
DetailsTom Marshall
Plan assigned to (CJW)3/11/20193/11/20198/10/2019 PASS
DetailsCarl Westfall
* (2nd done) 04/08/19 (new buildings - 25 days) (eplan) Village East Apartments (L) (approved pending structural)
Plan Reviewer's activity  8/10/2019 DONE
See the routing under permit BLD19-00526 for all buildings.
PLANS/APPL TAKEN TO FRONT DESK  8/10/2019 DONE
Routing - Design Review8/5/2019 8/5/2019 PASS
DetailsAndrea Tuning
Routing - FIRE7/9/20197/9/20197/16/2019 PASS
DetailsMark Scharfen
07/16-Village East Building L resubmittal. MS. Completed fire review, uploaded rev_fire 07.16.2019.pdf. All permits approved on job for fire.
Routing PW Drainage7/15/2019 7/15/2019 PASS
DetailsBrian Murphy
Plan resubmittals received  7/8/2019 DONE
See the routing under permit BLD19-00526 for the 3rd plan review. None of the permits can be issued until all plan reviews are approved. CJW
Routing - FIRE6/13/20196/13/20196/24/2019 FAIL
DetailsMark Scharfen
06/26-Village East building L resubmittal MS. completed fire review. uploaded rev_fire 06.24.2019.pdf and emailed architect.
Routing - Design Review6/17/2019 6/17/2019 FAIL
DetailsAndrea Tuning
A total of 272 bicycle parking spaces will be required. A minimum of 68 of the bicycle parking spaces are required to be covered. To provide a safe, covered and efficient location for the bicycles, design the spaces to be a minimum of 6-feet long and 2.5 feet wide and have an overhead clearance of 7-feet if covered. A 4-foot wide aisle is required between rows of bicycle parking or nearby walls. Stationary racks shall be located on improved non-permeable surfaces and anchored to the ground. A detail of the rack and how it is attached to the wall should be submitted with the building permit.

Vertical curbing shall be utilized adjacent to all landscaping and pedestrian walk ways. Permanent wheel restraints may be utilized in lieu of curbing adjacent to pedestrian walk ways.

All interior and terminal planter islands shall provide at least one Class II tree within all of the interior and terminal planters.

Provide an easement for portions of the Valley Regional transit stop located on private property.

Continue to work with staff to provide a cohesive and quality exterior building design in regard to material breaks, the application of brick on each building and the color palette for the development. This may include providing a brick wainscot or brick corner elements on each building, reevaluating the location of material breaks and further refining the color palette.

Employ techniques to recess windows above the ground floor a minimum of 2-inches from the façade or incorporated window trim at least 4-inches in width. Submit a window detail showing this recess.
Plan Reviewer's activity  6/13/2019 DONE
See the routing under permit BLD19-00526 for the 2nd plan review. None of the permits can be issued until all plan reviews are approved. CJW
Route to Impact Fee Review5/10/20195/13/20195/10/2019 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Routing - PLAN CHECK3/11/2019 5/7/2019 FAIL
DetailsCarl Westfall
1st review completed  5/7/2019 DONE
Plan resubmittals requested  5/7/2019 DONE
Routing - Erosion and Sediment4/9/2019 4/25/2019 PASS
DetailsAndy J. Long
see ESC19-00181 for details
Routing - FIRE4/9/20194/9/20194/12/2019 FAIL
DetailsMark Scharfen
IFC 1st review 04.12.2019.pdf
Routing Off Site - STRUCTURAL4/9/2019 3/27/2019 FAIL
DetailsCarl Westfall
Routing PW Sewer Design3/12/2019 3/26/2019 PASS
DetailsDeAnn Brown
Routing PW Solid Waste3/12/2019 3/21/2019 PASS
DetailsEvan Carpenter
Routing PW Drainage3/12/2019 3/21/2019 FAIL
DetailsBrian Murphy
Routing - PLANNING3/19/2019 3/19/2019 FAIL
DetailsLeon Letson
See DR comments
Routing - MECHANICAL3/11/2019 3/15/2019 PASS
DetailsTroy James
Routing - PLUMBING3/11/2019 3/15/2019 PASS
DetailsDaryl Spivey
Routing - Design Review3/11/2019 3/13/2019 FAIL
DetailsAndrea Tuning
Routing PW Street Lights3/12/2019 3/12/2019 FAIL
DetailsTom Marshall
Routing - Addressing3/12/2019 3/12/2019 PASS
DetailsDoug Chausow
Bldg L: 11916 W Fairview Ave
Routing - PUBLIC WORKS3/12/2019 3/12/2019 PASS
DetailsAngela Hardy
Intake Approval  3/5/2019 PASS
Application received  2/21/2019 DONE
Application submitted via PDS Online on Feb 21 2019 5:02PM