Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD19-00556
StatusFinaled
Name RIVER BROOK CUSTOM HOMES INC
Site Address 5517 W SPAULDING ST
Project Name 
Customer Number 
ePlanReviewYes
Description
***12/09/19 PLAN MODIFICATION FOR SHEAR CALCULATIONS AND FLOOR PLAN CHANGE TO ADD CLOSET AND WASHER & DRYER SPACE.*** Permit for the construction of a new 1602 sq. ft., one story single family dwelling with 1 bedrooms, 2 bathrooms and a 893 sq. ft. attached garage per the approved plans and any notations. Future pergola shown on drawingsg is not part of this permit. Prescriptive Energy Compliance. R-1C zoning and setbacks per planning. ***RDP***
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/24/20207/24/20207/24/2020PPASS
DetailsDave Hannah
*Screened* Damon, call for access code Phone #: ###-####
DOC - Permit Finaled7/24/20207/24/20207/24/2020PPASS
DetailsDave Hannah
BLD-Final7/22/20207/23/20207/23/2020PFAIL
DetailsTell Riley
Damon - */Screened*/ Phone #: ###-####//need to have hard surface turnaround per plans or provide approval from zoning//currently only a 20 foot drive connected to common driveway//
BLD-Blower Door Test Results7/23/20207/23/20207/23/2020PDONE
DetailsTell Riley
5.9 ACH 50
Routing - PLANNING7/23/2020 7/23/2020 PASS
DetailsNicolette Womack
Confirmed driveway as built satisfies requirements for shared driveway. Turn around not required as fire access is within permitted distance from Spaulding.
BLD-Blower Door Test Results4/10/20204/10/20204/10/2020PCANC
DetailsTell Riley
BLD-Final4/9/20204/10/20204/10/2020AFAIL
DetailsTell Riley
Daiman *cleared* Phone #: ###-####//still needs driveway or zoning approval//
BLD-Final4/7/20204/8/20204/8/2020PFAIL
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Damion Jordan//CN issued//need to finish backfill around foundation on west and south side//need blower door test//need to post insulation certificate//need to complete shared driveway and turnaround or provide zoning approval//add house numbers to home//
Plan Reviewer's activity  4/8/2020  
DetailsRob Patrick
Applicant phoned and we discussed access requirements to the loft area above the master bedroom and bath. Applicant stated that area was strictly for storage and was not going to be living space. This space can only be used for "Storage" space and can not be used for living space.
BLD-Energy code compliance1/23/20201/23/20201/23/2020PPASS
DetailsBrandon Shaw
BLD-Energy code compliance1/22/20201/23/20201/23/2020PPART
DetailsBrandon Shaw
East entry and North walls, OK to cover exterior only...
BLD-Framing/Rough-in1/17/20201/21/20201/21/2020PPASS
DetailsTell Riley
damon Phone #: ###-####//corrections made from walk through//ok to insulate only//will need fireplace sign off prior to cover//
BLD-Framing/Rough-in1/16/20201/17/20201/17/2020PNR
DetailsTell Riley
Damon Phone #: ###-####//need mechanical pass and fire place rough in passed//did a walk through and marked areas for anchor bolts and framing corrections//
BLD-Wall Bracing12/13/201912/16/201912/16/2019APART
DetailsTell Riley
Damon Phone #: ###-####//correction notice issued for hold down location that does not reflect location noted by engineer//other changes on garage ok per plans\\
CHANGE STATUS TO (ISS)  12/13/2019 DONE
OVERRIDE  12/10/2019  
Plan assigned to (RDP)12/5/201912/5/201912/10/2019 DONE
DetailsRob Patrick
Plan Mod...received engineering changes, still waiting for dwg updates. 12/09/19 Failed for Planning comment
Routing - PLAN CHECK12/10/2019 12/10/2019 PASS
DetailsRob Patrick
PLANS/APPL TAKEN TO FRONT DESK  12/10/2019 DONE
DetailsRob Patrick
Permit Ready to Issue  12/10/2019 DONE
**DO NOT REISSUE - PLAN MOD**
BLD-Wall Bracing12/6/201912/9/201912/9/2019APART
DetailsTell Riley
shear // Damion Phone #: ###-####//nailing and hold downs ok per engineering provided//need engineers ok on window location and added door in garage//do not cover these areas//
Routing - PLANNING12/9/2019 12/9/2019 PASS
DetailsNicolette Womack
Routing - PLAN CHECK12/9/2019 12/9/2019 FAIL
DetailsRob Patrick
Failed for Planning comment.
Routing - PLAN CHECK12/9/2019 12/9/2019 FAIL
DetailsRob Patrick
Planning note concerning driveway.
BLD-Framing/Rough-in12/5/201912/5/201912/5/2019PNR
DetailsTell Riley
Bob Phone #: ###-####//need to submit new engineering for shear walls//call for re-inspection//
Plan Modification Accepted  12/5/2019 DONE
truss in garage engineering info, location of windows to match elevation engineered provided for framing, adding on closet in bedroom to take over part of garage, and putting in 16ft window in the great room
BLD-Conference11/22/201911/22/201911/22/2019PDONE
DetailsTell Riley
Damon Phone #: ###-####//questions on loft and a plan change///advised to submit a plan mod for approval//
Routing - MECHANICAL11/8/2019 11/8/2019 PASS
DetailsChad Schwendiman
Revised acca report
BLD-Foundation8/21/20198/21/20198/21/2019PPASS
DetailsBob Archibald
Spoke with Clint From Boise Division Project II @ ###-####. Clint informed me that the approximate 4" enchroachment was acceptable.
BLD-Foundation8/19/20198/20/20198/20/2019APART
DetailsTell Riley
call half hour before to meet // damion Phone #: ###-####//discussed easment//no pins fpr easement--will need pins for easment or written confirmation of placement from canal company//notified Damion he can proceed at his own risk--we will still need confirmation from canal company for setbacks//he will notify me when written documentation is recieved//--per Bob
BLD-Footing8/15/20198/16/20198/16/2019AFAIL
DetailsTell Riley
damion Phone #: ###-####//no pins onsite observed for easment of canal// locate pins for easment verification and setback requirements//
BLD-Conference8/9/20198/12/20198/12/2019PDONE
DetailsTell Riley
check on project..footings and wall may have been poured--footing inspection failed on 7/12/2019//footings and foundation have been poured//footing inspection failed on 7/12 (no pins to verify setbacks for canal easment)//correctin notice issued to locate pins and verify easement setbacks prior to continuing on preject//
BLD-Footing7/12/20197/12/20197/12/2019PFAIL
DetailsTell Riley
need to string easment line for canal//NE corner of house will be on easment line//call for re-inspection//
BLD-Conference7/12/20197/12/20197/12/2019PCANC
DetailsTell Riley
damion Phone #: ###-####
Meeting  6/20/2019 DONE
emailed damion that there are still fees due before issuance
Issue PAID IN FULL permit  6/20/2019 DONE
Inspection Record Card- Bld  6/20/2019 DONE
OVERRIDE  6/18/2019  
Plan assigned to (RDP)4/3/20194/3/20196/18/2019 DONE
DetailsRob Patrick
04/16 sfd L1 ePlan...04/11 Failed...04/23 Failed...06/06 Failed
Routing - PLAN CHECK6/18/2019 6/18/2019 PASS
DetailsRob Patrick
PLANS/APPL TAKEN TO FRONT DESK  6/18/2019 DONE
Details
Permit Ready to Issue  6/18/2019 DONE
Routing - PLAN CHECK6/12/2019 6/12/2019 FAIL
DetailsRob Patrick
Remove patio cover on sheets 3&5; Add Braced Wall Lines to sheet 4
Routing - PLAN CHECK6/6/2019 6/6/2019 FAIL
DetailsRob Patrick
Corrections Required
Routing - PLAN CHECK4/23/2019 4/23/2019 FAIL
DetailsRob Patrick
Corrections required
1st review completed  4/11/2019 FAIL
DetailsRob Patrick
Corrections Req'd
Routing - PLAN CHECK4/3/2019 4/11/2019 FAIL
DetailsRob Patrick
Corrections Req'd
Route to Impact Fee Review4/3/20194/6/20194/4/2019 PASS
DetailsShannon Cade
Initial residential review of new SFD permits requested for now.
Routing - MECHANICAL4/3/2019 4/4/2019 PASS
DetailsTroy James
Routing - PLANNING4/3/2019 4/3/2019 PASS
DetailsNicolette Womack
Routing - Addressing4/3/2019 4/3/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS4/3/2019 4/3/2019 PASS
DetailsAngela Hardy
Intake Approval  4/3/2019 PASS
Recd Pcfee & Taken To Pln CK  4/3/2019 DONE
Intake Approval  3/13/2019 FAIL
Please provide updated value for entire project covered under this permit 1602 sq. ft. and identify fixture (two circles next to wetbar sink) in "Man Cave".
Intake Approval  3/7/2019 FAIL
Please provide 1. Manual J
2. Indicate the location of the furnace and air conditioner on your plans
Application received  2/23/2019 DONE
Application submitted via PDS Online on Feb 23 2019 3:22PM