Permit Information
Permit NumberBLD19-00843
StatusFinaled
Name WRIGHT BROTHERS THE BLDG CO EAGLE
Site Address 4795 W EMERALD ST
Project NameThe Commons Climbing Gym
Customer NumberBLD19-01136 INTERIOR DEMO
ePlanReviewYes
Description
(THE COMMONS CLIMBING GYM) (DRH19-00043) (BLD19-01136 INTERIOR DEMO) // 09/27/19 PLAN MOD TO REPLACE EAST EXTERIOR CMU WALL THAT COLLAPSED, SPECS FOR INTERIOR WALL FINISHES, AND APPROVED CODE ALTERNATE FOR 2ND ACCESSIBLE MEANS OF EGRESS. JAR // Permit to create an 11,107 sq ft building by building an addition to connect two existing buildings for a new rock climbing gym. Work to include: selective exterior demolition on both buildings; new exterior doors and storefront; new exterior walls to increase the building height on the north building to 45 ft; new roof structure; new floor structure; interior structure to support rock climbing walls; related site improvements; mechanical work including new RTUs; plumbing; electrical; remodeling the interior with new interior non-bearing partition walls, restrooms, stairs, and finishes in compliance with Ch. 8 of the 2015 IBC. Special inspections required per attached Form 310. This building will be fire sprinklered for height, area increase and A3 occupancy and fully alarmed. The Fire Sprinkler and Fire Alarm systems WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 and NFPA 72 as regulated by the Boise Fire Department. **JAR**
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 4/8/20204/9/2020 DONE
This permit finaled on the web by Sheila Winkler
Second Notice 3/15/20204/3/2020 DONE
mailed 4-6-2020
First Notice 2/22/20203/5/2020 DONE
mailed 3-6-20
BLD-Final2/11/20202/12/20202/12/2020PPASS
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Zach Carter
FIRE-Final Inspection2/11/20202/12/20202/12/2020APASS
DetailsTroy Cobbley
Life safety passed.

Phone #: ###-#### Inspection requested via web by Zach Carter
Permanent Occupancy  2/12/2020 DONE
FIRE-Final Inspection2/7/20202/10/20202/10/2020AFAIL
DetailsJim Page
Exit signage needs to match what was submitted on city approved drawings, provide code compliant hardware on NW exit door, riser room is not 1 hour fire rated due to multiple holes in wall, provide and install knox box. Mount fire extinguishers at max 48" to mechanism as discussed. Still need to verify emergency operation of all emergency lights. FIR permit for fire sprinklers must be finaled before life safety can be completed. GR


Phone #: ###-#### Inspection requested via web by Zach Carter
BLD-Final2/10/20202/10/20202/10/2020PCANC
DetailsTell Riley
Phone #: ###-#### >> Inspection requested via web by Zach Carter Inspection cancelled from web by: Zach Carter
BLD-Final2/7/20202/7/20202/7/2020PCANC
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Zach Carter//need fire life safety, sprinkler and fire alarm finals// will need to reshedule//
Zoning Approval2/7/20202/7/20202/7/2020 PASS
DetailsJosh Wilson
BLD-Framing/Rough-in12/23/202012/24/20202/5/2020PPART
DetailsTell Riley
Per Tell, framing inspection put on Foundation permit. Switching it to BLD19-00843 2-5-2020 // new GB over existing framing//insulation ok, vapor barrier installed//no electrical or plumbing//
CHANGE STATUS TO (ISS)  1/29/2020 DONE
per carl m didn't mean to put back in REV
BLD-Conference12/12/201912/16/201912/16/2019ADONE
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Zach Carter//site walk through//accesible ramp to steep on outside of building--discussed options to make compliant//accessible ramp inside filled with insulation-talk with Troy about depth of fill//will need framing for tall building area prior to cover//
BLD-Conference11/12/201911/15/201911/15/2019ADONE
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Zach Carter//discussed RFI for ramp --approved as is by engineer for structural//discussed climbing wall structures and verifiying permits and special inspections//
FIRE-Conference11/12/201911/14/201911/14/2019PDONE
DetailsTroy Cobbley
We discussed possible combustible concealed spaces caused by the climbing wall construction. Phone #: ###-#### Inspection requested via web by Zach Carter
BLD-Framing/Rough-in11/7/201911/8/201911/8/2019APART
DetailsTell Riley
Zach Phone #: ###-####//need to provide mod for construction changes to ramp//vestibule, bathrooms ok when fire sprinklers have passed--discussed with Troy and advised Zach to schedule fire conference for areas behind rock walls//
CHANGE STATUS TO (ISS)  10/2/2019 DONE
OVERRIDE  9/27/2019  
Plan assigned to (JAR)8/13/20198/13/20199/27/2019 DONE
DetailsJulie Romig
09/30 - 2nd Rev - Plan Mod - The Commons Climbing Gym
Permit Ready to Issue  9/27/2019 DONE
Routing Off Site - STRUCTURAL9/24/2019 9/24/2019 PASS
DetailsJulie Romig
Routing - PLAN CHECK9/24/2019 9/24/2019 PASS
DetailsJulie Romig
Routing - PLUMBING9/19/2019 9/19/2019 PASS
DetailsDaryl Spivey
Per plan and ISPC. With DCVA as premise protection.
Routing Off Site - STRUCTURAL9/13/2019 9/18/2019 PASS
DetailsJulie Romig
Stapley
Routing - PLAN CHECK9/13/2019 9/18/2019 PASS
DetailsJulie Romig
Plan Modification Accepted  8/13/2019 DONE
plan mod accepted
BLD-Conference7/22/20197/24/20197/24/2019ADONE
DetailsTell Riley
Zack Phone #: ###-####//discuss project and advised Zack to submit plan changes to plan review for approval//
BLD-Foundation7/16/20197/17/20197/17/2019APASS
DetailsBrandon Shaw
Work in progress...
Pending special inspection...
BLD-Footing7/3/20197/3/20197/3/2019PPART
DetailsTell Riley
Zach Phone #: ###-####//concrete already poured//specials were completed to epoxy, rebar and concrete//
Issue PAID IN FULL permit  6/25/2019 DONE
Print Occupancy Form  6/25/2019 DONE
OVERRIDE  6/21/2019  
Permit Ready to Issue  6/21/2019 DONE
Met
NEED
emailed forms to zcarter@wbtbc.com*PLEASE SEND OWNER A NOTICE WHEN FEES ARE APPLIED*
GC
Revised Certificate of Value
Routing - PUBLIC WORKS5/31/2019 6/21/2019 PASS
DetailsAngela Hardy
Routing - PUBLIC WORKS6/3/2019 6/21/2019 PASS
DetailsAngela Hardy
Plan assigned to (JAR)4/4/20194/4/20196/20/2019 DONE
DetailsJulie Romig
06/20 - 3rd Rev - 1st Rev Comp - 502 The Commons Climbing Gym
PLANS/APPL TAKEN TO FRONT DESK  6/20/2019 DONE
Routing - PLAN CHECK6/17/2019 6/19/2019 PASS
DetailsJulie Romig
3rd Building Review
Routing Off Site - STRUCTURAL6/17/2019 6/18/2019 PASS
DetailsJulie Romig
5th Review
Routing - Design Review6/17/2019 6/17/2019 PASS
DetailsAndrea Tuning
Plans were redlined to require the landscape planter and the pedestrian walkway to remain.
Routing - PLAN CHECK5/31/2019 6/8/2019 FAIL
DetailsJulie Romig
IBC plan review report emailed to architect, contractor, owner
Routing Off Site - STRUCTURAL6/5/2019 6/8/2019 FAIL
DetailsJulie Romig
4th Review
Routing - FIRE5/31/20196/3/20196/7/2019 PASS
DetailsMark Scharfen
06.07.2019-Completed IFC review. Uploaded rev_fire 06.07.2019.pdf. Passed review.
Routing - Design Review5/31/2019 6/4/2019 FAIL
DetailsAndrea Tuning
The proposed bicycle parking rack is not an approved bicycle rack and the parking pad will not accomodate the 5 required bicycle parking spaces.
Routing - PLUMBING6/3/2019 6/3/2019 PASS
DetailsDan Ediger
3rd Review
Per plans and specifications
Routing Off Site - STRUCTURAL5/31/2019 6/3/2019 FAIL
DetailsJulie Romig
3rd Review - Provide updated foundation plan and details to address the access ramp.
Routing - MECHANICAL5/31/2019 6/3/2019 PASS
DetailsTroy James
Routing - PLUMBING5/31/2019 6/3/2019 FAIL
DetailsDan Ediger
Provide a 3" floor sink in the mechanical room.
Show all hot water piping, sizing and insulation requirements.
Routing Off Site - STRUCTURAL5/24/2019 5/29/2019 FAIL
DetailsJulie Romig
2nd Review - Structural resubmittal routed to Stapley via email for 2nd Review
Plan Reviewer's activity  5/28/2019 DONE
Received revised Site Plan from architect's office addressing fire access comments. Emailed plan to Josh Wilson (Design Review) and Mark Schafren (Fire) for input.
Route to Impact Fee Review5/15/20195/18/20195/15/2019 PASS
DetailsKarina Myles
Review requested for Commercial Permit
Routing - FIRE4/4/20194/4/20195/14/2019 FAIL
DetailsMark Scharfen
05.14.2019-Completed IFC review. Uploaded Rev_fire 05.14.2019.pdf and emailed architect.
Routing - PLAN CHECK4/4/2019 5/14/2019 FAIL
DetailsJulie Romig
1st review completed  5/14/2019 FAIL
DetailsJulie Romig
Routing Off Site - STRUCTURAL4/4/2019 4/18/2019 FAIL
DetailsJulie Romig
1st Review - Stapley
Routing - MECHANICAL4/4/2019 4/9/2019 PASS
DetailsTroy James
Routing - PLANNING4/4/2019 4/8/2019 PASS
DetailsDavid Moser
SEE DRH19-00043
Routing - Addressing4/4/2019 4/5/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS4/4/2019 4/5/2019 PASS
DetailsAngela Hardy
Routing - Design Review4/4/2019 4/5/2019 FAIL
DetailsAndrea Tuning
Provide a minimum of 5 bicycle parking spaces on the site. The parking spaces shall be a minimum of 6-feet long and 2.5-feet side and have an overhead clearance of 7-feet if covered. A 4-foot side aisle is required between rows of bicycle parking spaces or nearby walls. All bike racks are required to be located on an improved non-permeable surface and anchored to the ground. Submit cut sheets of the proposed bicycle parking racks and covers for final review and approval.

The new tree within the new planter island shall be an approved Class II tree within the Boise City Tree Selection Guide.
Routing - Erosion and Sediment4/4/2019 4/4/2019 PASS
DetailsMichael Zawacki
Routing - PLUMBING4/4/2019 4/4/2019 FAIL
DetailsDan Ediger
Install a floor drain in the mechanical room per notes
Intake Approval  4/4/2019 PASS
DetailsJoe Bruce
Prescreen approved 04/04/19 by JHB
Intake Approval  3/20/2019 FAIL
DetailsJoe Bruce
Please provide the following to complete your prescreen:
1. Form #310 Statement of Special Inspections: Provide the additional pages with form #310 that denote the required type of inspections required. You can download the entire form for our website.
2. Please contact Michael Zawacki - mzawacki@cityofboise.org – ###-#### for the requirements for the Erosion and Sediment Control application. Since there is a new concrete slab being poured: an ESC permit will be required. Contact Michael for what will be required.
3. Fire extinguishers could not be located on the cover sheet. The F.E. could be located on the notes, but not located on the plan. Please provide locations.
4. Sheet S-101 could not be located in the drawings folder. Please upload this drawing.
5. Sheet E3.1 Lighting Compliance forms use the incorrect version of the IECC code. Please update to the 2105 IECC. Resubmit drawings with updated COMcheck.
Application received  3/18/2019 DONE
Application submitted via PDS Online on Mar 18 2019 10:27AM
Routing - Erosion and Sediment1/29/2020