BLD-Final | 4/16/2020 | 4/17/2020 | 4/17/2020 | P | PASS |
Tell Riley
|
|
|
Screened-if inspector can do this inpsection over the video-Please call 30 min.- ERIC Phone #: ###-####//completed via virtual inspection due to pandemic//
|
DOC - Permit Finaled | 4/17/2020 | 4/17/2020 | 4/17/2020 | P | PASS |
Tell Riley
|
|
|
final completed via Google DUO virtual inspection//appears to be ok and in accordance with plans on file//
|
BLD-Conference | 2/26/2020 | 2/26/2020 | 2/27/2020 | P | DONE |
Tell Riley
|
|
|
check on progess...//tried to make contact with owner--left message no response//assume it is a WIP//
|
BLD-Aging Inspection | 2/25/2020 | 2/25/2020 | 2/25/2020 | | PASS |
Tell Riley
|
|
|
wip
|
Plan Modification Accepted | | | 12/17/2019 | | DONE |
|
|
|
New Manual J
|
Routing - MECHANICAL | 12/17/2019 | | 12/17/2019 | | PASS |
Troy James
|
|
|
|
Telephone call | | | 12/17/2019 | | DONE |
|
|
|
left a voicemail and emailed that the plan mod is ready for pick up and what fees are due.
|
BLD-Energy code compliance | 10/12/2019 | 10/14/2019 | 10/14/2019 | P | PASS |
Tell Riley
|
|
|
Later the better in the afternoon. Addition is being insulated that morning. Back door will be unlocked. Contact Eric the home owner ###-#### Phone #: ###-#### Inspection requested via web by Eric Mccray
|
BLD-Energy code compliance | 10/11/2019 | 10/14/2019 | 10/12/2019 | P | CANC |
Tell Riley
|
|
|
Back door is unlocked. Call Eric at ###-#### with questions Phone #: ###-#### >> Inspection requested via web by Eric Mccray Inspection cancelled from web by: Eric Mccray
|
BLD-Framing/Rough-in | 10/11/2019 | 10/11/2019 | 10/11/2019 | P | PASS |
Tell Riley
|
|
|
###-#### Contact Corey Inspection requested via web by Eric Mccray//ok per changed plans for shear//framin ok per plans//ok to cover per Jack/mechanical--
|
OVERRIDE | | | 10/10/2019 | | |
|
|
|
|
Routing Walk-In (BLD) | 10/10/2019 | 10/10/2019 | 10/10/2019 | P | DONE |
Josh Bogle
|
|
|
needs to talk to Josh about framing mistakes on plans
|
Routing - PLAN CHECK | 10/10/2019 | | 10/10/2019 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 10/10/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 10/10/2019 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 10/10/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 10/10/2019 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 10/3/2019 | 10/4/2019 | 10/4/2019 | A | FAIL |
Tell Riley
|
|
|
Backdoor will be unlocked. Pls cAll Eric ###-#### Phone #: ###-#### Inspection requested via web by Eric Mccray//corrections--to many to list//correction notice posted onsite//
|
BLD-Foundation | 6/11/2019 | 6/11/2019 | 6/11/2019 | P | PART |
Tell Riley
|
|
|
Dion - Foundation Wall Phone #: ###-####//wall ok per plans// install hold downs per plans
|
BLD-Footing | 6/10/2019 | 6/10/2019 | 6/10/2019 | P | PASS |
Tell Riley
|
|
|
DEON Phone #: ###-####// footings ok per plans.
|
OVERRIDE | | | 4/12/2019 | | |
|
|
|
|
Routing Walk-In (BLD) | 4/12/2019 | 4/12/2019 | 4/12/2019 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 4/12/2019 | | 4/12/2019 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 4/12/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 4/12/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/12/2019 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy yes
|
Permit Ready to Issue | | | 4/12/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 4/12/2019 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 4/2/2019 | 4/2/2019 | 4/2/2019 | P | PASS |
Ethan Mansfield
|
|
|
|
Routing Walk-In (BLD) | 4/2/2019 | 4/2/2019 | 4/2/2019 | P | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 4/2/2019 | | 4/2/2019 | | FAIL |
Josh Bogle
|
|
|
plans lacked existing floor plan, not to scale, some structural details not clear
|
1st review completed | | | 4/2/2019 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 4/2/2019 | | | |
|
|
|
|