Information based on query as of Saturday, May 18, 2024.
Permit Information
Permit NumberBLD19-01415
StatusFinaled
Name CM COMPANY
Site Address 720 E PARK BLVD
Project NameWGCP - UPS / Generator Upgrade
Customer Number 
ePlanReviewYes
Description
((ST LUKE'S HEALTH SYSTEMS – WGCP and WGP4) Permit is for the replacement of the existing 500kW engine generator with new 1000 kW engine generator located in the central plaza and new UPS system located in plaza #4. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of select existing equipment, removal of select door/door frames, removal of select suspended ceiling, construction of interior non-bearing walls to create a demising walls, select new door/doorframe, new generator, new UPS power supply, electrical work, mechanical work and interior finishes in compliance with Ch. 8 of the current IBC. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JHB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 5/17/20207/9/2020 DONE
mailed 7-9-2020
First Notice4/9/20204/9/20205/7/2020 DONE
DetailsBrandon Shaw
mailed 5-8-2020
Letter of compliance/Occupancy  4/10/2020 DONE
BLD-Final4/8/20204/9/20204/9/2020APASS
DetailsBrandon Shaw
*screened* Bruce Phone #: ###-####
DOC - Permit Finaled4/9/20204/9/20204/9/2020PPASS
DetailsBrandon Shaw
FIRE-Final Inspection4/7/20204/8/20204/8/2020APASS
DetailsJim Page
Final life fire safety inspection for area of work complete.

screened // bruce Phone #: ###-####
BLD-Framing/Rough-in12/17/201912/17/201912/17/2019PPASS
DetailsDave Hannah
Bruce Phone #: ###-####
Issue PAID IN FULL permit  8/16/2019 DONE
Inspection Record Card- Bld  8/16/2019 DONE
Permit Ready to Issue  6/27/2019 DONE
MET SEANS@CMCOMPANY.COM
Need
GC Form
Revised Value
Routing - FIRE6/21/20196/21/20196/26/2019 PASS
DetailsMark Scharfen
06.26.2019-Completed review of resubmittal 3. Uploaded rev_fire 06.26.2019.pdf. all resubmittal items have been addressed.
Plan assigned to (JHB)5/7/20195/7/20196/26/2019 PASS
DetailsJoe Bruce
06/27 (3rd Rev) 05/17 (L2) WGP4 - UPS / Generator Upgrade, ePlan
PLANS/APPL TAKEN TO FRONT DESK  6/26/2019 DONE
Routing - PLAN CHECK6/11/2019 6/20/2019 PASS
DetailsJoe Bruce
Plan resubmittals requested  6/20/2019 DONE
DetailsJoe Bruce
Corrections required from fire review.
Plan resubmittals received  6/20/2019 DONE
DetailsJoe Bruce
Routing - FIRE6/11/20196/11/20196/12/2019 FAIL
DetailsMark Scharfen
06.12.2019-Completed fire review. Uploaded rev_fire 06.12.2019.pdf and emailed architect.
Plan resubmittals received  6/11/2019 DONE
DetailsJoe Bruce
Route to Impact Fee Review5/17/20195/20/20195/20/2019 PASS
DetailsKarina Myles
Review requested for Commercial Permit
Routing - FIRE5/7/20195/7/20195/17/2019 FAIL
DetailsMark Scharfen
5/17/2019-Completed fire review. Uploaded rev_fire 05.17.2019.pdf and emailed architect.
1st review completed  5/17/2019 FAIL
DetailsJoe Bruce
Plan resubmittals requested  5/17/2019 DONE
DetailsJoe Bruce
Routing - PLAN CHECK5/7/2019 5/17/2019 FAIL
DetailsJoe Bruce
Routing - MECHANICAL5/7/2019 5/7/2019 PASS
DetailsTroy James
Replace Generator and water source heat pump and ductwork to UPS room.
Routing - Addressing5/7/2019 5/7/2019 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS5/7/2019 5/7/2019 PASS
DetailsAngela Hardy
Routing - Design Review5/7/2019 5/7/2019 PASS
DetailsJosh Wilson
Minor exterior change not externally visible.
Intake Approval  5/6/2019 PASS
DetailsJavier Guzman
Intake Approval  5/3/2019 FAIL
DetailsJavier Guzman
Provide and upload the following:
• Provide a completed 518 Checklist, checklist can be found at our website at https://pds.cityofboise.org/home/documents/apps/500/
• Provide any missing items from the checklist
• View ePlan submittal standards for city title block, in a quick view some sheets were found not complying. (nothing can be within the title block area) see https://pds.cityofboise.org/media/464072/pdox86_electronic_standards_full_050718.pdf
• Provide Planning and zoning letter of approval for the exterior changes (lovers, doors, etc..)
• Provide new generator manufactures specs
Application received  4/26/2019 DONE
Application submitted via PDS Online on Apr 26 2019 10:05AM