BLD-Final | 3/3/2020 | 3/3/2020 | 3/3/2020 | P | PASS |
Jim Storey
|
|
|
Front door unlocked Phone #: ###-#### Inspection requested via web by bryan murdoch
|
DOC - Permit Finaled | 3/3/2020 | 3/3/2020 | 3/3/2020 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 2/26/2020 | 2/26/2020 | 2/26/2020 | A | NR |
Jim Storey
|
|
|
Garage code is 1905 thanks Phone #: ###-#### Inspection requested via web by bryan murdoch handrail clearance/ pool cover
|
PubWorks Occupancy Approval | 2/24/2020 | 2/24/2020 | 2/24/2020 | | DONE |
Melissa Jannusch
|
|
|
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Energy code compliance | 11/8/2019 | 11/8/2019 | 11/8/2019 | P | PASS |
Jim Storey
|
|
|
Happy Friday thanks Phone #: ###-#### Inspection requested via web by bryan murdoch
|
BLD-Framing/Rough-in | 11/5/2019 | 11/5/2019 | 11/5/2019 | A | PASS |
Jim Storey
|
|
|
Thanks Phone #: ###-#### Inspection requested via web by bryan murdoch
|
Routing - MECHANICAL | 10/28/2019 | | 10/28/2019 | | PASS |
Troy James
|
|
|
Revised manual j report
|
BLD-Wall Bracing | 9/25/2019 | 9/25/2019 | 9/25/2019 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by bryan murdoch
|
BLD-Foundation | 7/11/2019 | 7/11/2019 | 7/11/2019 | P | PASS |
Jim Storey
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Footing | 7/10/2019 | 7/10/2019 | 7/11/2019 | P | PASS |
Jim Storey
|
|
|
Thanks Phone #: ###-#### Inspection requested via web by bryan murdoch
|
BLD-Footing | 7/8/2019 | 7/9/2019 | 7/9/2019 | A | NR |
Jim Storey
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron need pw sign off
|
BLD-Footing | 7/9/2019 | 7/9/2019 | 7/9/2019 | P | NR |
Jim Storey
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
PubWorks Subgrade Approval | 7/9/2019 | 7/9/2019 | 7/9/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 7/2/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/2/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 7/1/2019 | | |
|
|
|
|
Routing - FIRE | 6/24/2019 | 6/24/2019 | 7/1/2019 | | PASS |
Lee G Meredith
|
|
|
07/01-3492 E Heartleaf Dr. paper resubmittal-LGM
Sprinklers are not required.
|
Plan assigned to (J_N) | 6/6/2019 | 6/6/2019 | 7/1/2019 | | DONE |
Jenny Nelson
|
|
|
06/25 sfd L2 Paper - with BLD19-02081 (pool). 1st complete 6/24, failed hillside and fire.
|
Case Summary (BLD) | | | 7/1/2019 | | DONE |
Jenny Nelson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/1/2019 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 7/1/2019 | | DONE |
|
|
|
MET
|
Inspection Record Card- Bld | | | 7/1/2019 | | DONE |
|
|
|
|
Telephone call | | | 7/1/2019 | | DONE |
|
|
|
Left voicemail to inform Doug that the permit is ready and what fees are due.
|
Routing - PUBLIC WORKS | 6/28/2019 | | 6/28/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing PW Grading-Hillside | 6/24/2019 | | 6/28/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
Routing - FIRE | 6/6/2019 | 6/6/2019 | 6/25/2019 | | FAIL |
Lee G Meredith
|
|
|
06/20-2492 E Heartleaf Dr. RES Paper 404.
Inadequate fire flow.
|
1st review completed | | | 6/24/2019 | | DONE |
Jenny Nelson
|
|
|
|
Routing - PLAN CHECK | | | 6/24/2019 | | PASS |
Jenny Nelson
|
|
|
|
Routing - PLANNING | 6/6/2019 | | 6/24/2019 | | PASS |
Leon Letson
|
|
|
|
Plan resubmittals requested | | | 6/14/2019 | | DONE |
|
|
|
Three copies each of Structural Calculations stamped and taken to plan reviewer.
|
Routing - Erosion and Sediment | 6/13/2019 | | 6/13/2019 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. Site preparation inspection is required.
|
Routing PW Grading-Hillside | 6/13/2019 | | 6/13/2019 | | FAIL |
Melissa Jannusch
|
|
|
retaining wall calcs
|
Routing - MECHANICAL | | | 6/13/2019 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 6/6/2019 | 6/9/2019 | 6/7/2019 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Plans ACCEPTED BY PLAN TECH | | | 6/6/2019 | | DONE |
|
|
|
|
Intake Approval | | | 6/6/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/6/2019 | | DONE |
|
|
|
|
Routing - Addressing | 6/5/2019 | | 6/5/2019 | | PASS |
Doug Chausow
|
|
|
|
Application received | | 6/4/2019 | | | |
|
|
|
|
Routing - PUBLIC WORKS | 6/6/2019 | | | | FAIL |
Morgan Webb
|
|
|
|