Permit Information
Permit NumberBLD19-02035
StatusFinaled
Name DOUG LASHER CONSTRUCTION
Site Address 3148 E HEARTLEAF CT
Project Name 
Customer Number 
ePlanReviewNo
Description
***W.U.I. HILLSIDE ZONE A CLASS "A" ROOF AND NON-COMBUSTIBLE EXTERIOR SIDING REQUIRED*** Permit for the construction of a new 3398 sq. ft., one story single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 600 sq. ft. of covered patio/porch and a 959 sq. ft. attached garage per the approved plans and any notations. Prescriptive Energy Compliance. R-1C zoning and setbacks per planning. ***RDP*** A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
***SPRINKLERS ARE NOT REQUIRED***LGM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/7/20201/8/20201/8/2020APASS
DetailsJim Storey
Garage code 1905
Thanks
Bryan Phone #: ###-#### Inspection requested via web by bryan murdoch
DOC - Permit Finaled1/8/20201/8/20201/8/2020PPASS
DetailsJim Storey
PubWorks Occupancy Approval1/7/20201/7/20201/7/2020 DONE
DetailsMelissa Jannusch
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Melissa Jannusch ###-####.
BLD-Final12/30/201912/31/201912/31/2019ACANC
DetailsBrandon Shaw
Phone #: ###-#### >> Inspection requested via web by bryan murdoch Inspection cancelled from web by: bryan murdoch
BLD-Energy code compliance9/25/20199/25/20199/25/2019PPASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by bryan murdoch
BLD-Framing/Rough-in9/23/20199/23/20199/23/2019PPASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by bryan murdoch
BLD-Wall Bracing9/16/20199/16/20199/16/2019PPASS
DetailsJim Storey
Thanks Phone #: ###-#### Inspection requested via web by bryan murdoch
BLD-Foundation7/10/20197/10/20197/11/2019PPASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by bryan murdoch
BLD-Footing7/8/20197/9/20197/9/2019APASS
DetailsJim Storey
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
PubWorks Subgrade Approval7/3/20197/3/20197/3/2019 DONE
DetailsMelissa Jannusch

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

Issue PAID IN FULL permit  7/2/2019 DONE
Inspection Record Card- Bld  7/2/2019 DONE
OVERRIDE  6/28/2019  
Inspection Record Card- Bld  6/28/2019 DONE
Telephone call  6/28/2019 DONE
Spoke with Bryan to inform him the permit is ready and what fees are due.
Permit Ready to Issue  6/28/2019 DONE
Routing - FIRE6/27/20196/27/20196/27/2019 PASS
DetailsLee G Meredith
No sprinklers required.
Plan assigned to (RDP)6/4/20196/4/20196/27/2019 DONE
DetailsRob Patrick
06/21 sfd L2 PAPER...06/24 Failed; Needs Energy Table and Fire FLow Letter
Case Summary (BLD)  6/27/2019 DONE
DetailsRob Patrick
PLANS/APPL TAKEN TO FRONT DESK  6/27/2019 DONE
DetailsRob Patrick
Plan resubmittals received  6/27/2019 DONE
2 copies of sheet A-101
Routing - PLAN CHECK6/27/2019 6/27/2019 PASS
DetailsRob Patrick
Routing - FIRE 6/4/20196/24/2019 FAIL
DetailsLee G Meredith
06/18-3148 E Heartleaf Ct. res PAPER

Fire flow report has not been provided.
1st review completed  6/24/2019 FAIL
DetailsRob Patrick
Needs Energy Table and Fire FLow Letter
Routing - PLAN CHECK  6/24/2019 FAIL
DetailsRob Patrick
Routing - Erosion and Sediment6/13/2019 6/21/2019 PASS
DetailsAndy J. Long
ESC plan approved. Certified RP designated. Site preparation inspection required.
Routing - MECHANICAL6/12/2019 6/13/2019 PASS
DetailsTroy James
Routing - PLANNING6/4/2019 6/12/2019 PASS
DetailsJeff Lowe
Routing - PUBLIC WORKS6/4/2019 6/12/2019 PASS
DetailsMorgan Webb
Routing PW Grading-Hillside6/5/2019 6/12/2019 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Route to Impact Fee Review6/4/20196/7/20196/5/2019 PASS
DetailsShannon Cade
Initial residential review of new SFD permits requested for now.
Routing - Addressing6/4/2019 6/5/2019 PASS
DetailsDoug Chausow
Plans ACCEPTED BY PLAN TECH  6/4/2019 DONE
Intake Approval  6/4/2019 PASS
Recd Pcfee & Taken To Pln CK  6/4/2019 DONE
Application received 6/4/2019