BLD-Final | 1/7/2020 | 1/8/2020 | 1/8/2020 | A | PASS |
Jim Storey
|
|
|
Garage code 1905 Thanks Bryan Phone #: ###-#### Inspection requested via web by bryan murdoch
|
DOC - Permit Finaled | 1/8/2020 | 1/8/2020 | 1/8/2020 | P | PASS |
Jim Storey
|
|
|
|
PubWorks Occupancy Approval | 1/7/2020 | 1/7/2020 | 1/7/2020 | | DONE |
Melissa Jannusch
|
|
|
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Final | 12/30/2019 | 12/31/2019 | 12/31/2019 | A | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### >> Inspection requested via web by bryan murdoch Inspection cancelled from web by: bryan murdoch
|
BLD-Energy code compliance | 9/25/2019 | 9/25/2019 | 9/25/2019 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by bryan murdoch
|
BLD-Framing/Rough-in | 9/23/2019 | 9/23/2019 | 9/23/2019 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by bryan murdoch
|
BLD-Wall Bracing | 9/16/2019 | 9/16/2019 | 9/16/2019 | P | PASS |
Jim Storey
|
|
|
Thanks Phone #: ###-#### Inspection requested via web by bryan murdoch
|
BLD-Foundation | 7/10/2019 | 7/10/2019 | 7/11/2019 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by bryan murdoch
|
BLD-Footing | 7/8/2019 | 7/9/2019 | 7/9/2019 | A | PASS |
Jim Storey
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
PubWorks Subgrade Approval | 7/3/2019 | 7/3/2019 | 7/3/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 7/2/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/2/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 6/28/2019 | | |
|
|
|
|
Inspection Record Card- Bld | | | 6/28/2019 | | DONE |
|
|
|
|
Telephone call | | | 6/28/2019 | | DONE |
|
|
|
Spoke with Bryan to inform him the permit is ready and what fees are due.
|
Permit Ready to Issue | | | 6/28/2019 | | DONE |
|
|
|
|
Routing - FIRE | 6/27/2019 | 6/27/2019 | 6/27/2019 | | PASS |
Lee G Meredith
|
|
|
No sprinklers required.
|
Plan assigned to (RDP) | 6/4/2019 | 6/4/2019 | 6/27/2019 | | DONE |
Rob Patrick
|
|
|
06/21 sfd L2 PAPER...06/24 Failed; Needs Energy Table and Fire FLow Letter
|
Case Summary (BLD) | | | 6/27/2019 | | DONE |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/27/2019 | | DONE |
Rob Patrick
|
|
|
|
Plan resubmittals received | | | 6/27/2019 | | DONE |
|
|
|
2 copies of sheet A-101
|
Routing - PLAN CHECK | 6/27/2019 | | 6/27/2019 | | PASS |
Rob Patrick
|
|
|
|
Routing - FIRE | | 6/4/2019 | 6/24/2019 | | FAIL |
Lee G Meredith
|
|
|
06/18-3148 E Heartleaf Ct. res PAPER
Fire flow report has not been provided.
|
1st review completed | | | 6/24/2019 | | FAIL |
Rob Patrick
|
|
|
Needs Energy Table and Fire FLow Letter
|
Routing - PLAN CHECK | | | 6/24/2019 | | FAIL |
Rob Patrick
|
|
|
|
Routing - Erosion and Sediment | 6/13/2019 | | 6/21/2019 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. Certified RP designated. Site preparation inspection required.
|
Routing - MECHANICAL | 6/12/2019 | | 6/13/2019 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 6/4/2019 | | 6/12/2019 | | PASS |
Jeff Lowe
|
|
|
|
Routing - PUBLIC WORKS | 6/4/2019 | | 6/12/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing PW Grading-Hillside | 6/5/2019 | | 6/12/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
Route to Impact Fee Review | 6/4/2019 | 6/7/2019 | 6/5/2019 | | PASS |
Shannon Cade
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 6/4/2019 | | 6/5/2019 | | PASS |
Doug Chausow
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/4/2019 | | DONE |
|
|
|
|
Intake Approval | | | 6/4/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/4/2019 | | DONE |
|
|
|
|
Application received | | 6/4/2019 | | | |
|
|
|
|