Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD19-02406
StatusFinaled
Name RRC CONTRACTORS
Site Address 7500 W STATE ST
Project NameState St Dental/Retail Shell
Customer NumberBLD19-02529
ePlanReviewYes
Description
**2 PERMITS UNDER EPLAN BLD19-02406** (STATE STREET MULTI-TENANT DENTAL/RETAIL BUILDING SHELL) (DRH19-00168) Permit to construct a new 6,173 sq ft shell building for anticipated retail and mercantile occupancies. The 2,892 sq ft Dental TI is permitted under BLD19-02529. Work to include: concrete spread footings and ground floor slab; wood framed exterior walls and wood truss roof; exterior windows and doors; electrical lighting and power; mechanical roof top units and ductwork; rough plumbing. Envelope, lighting, and mechanical in compliance with the 2015 IECC. This is a shell/core permit only; separate tenant improvement permit will be required to finish this building for occupancy. All work shall comply with the approved drawings, the plan review report, and all applicable codes. Special Inspections required per the attached Form 310. This building is NOT fire sprinklered. **JAR**
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/7/20205/8/20205/8/2020PPASS
DetailsTony Young
ok pending others
PubWorks Occupancy Approval5/8/20205/8/20205/8/2020 DONE
DetailsTiffany Lowery
CHANGE STATUS TO (FNL)  5/8/2020 DONE
Per Tony Young, Finaling permit
Letter of compliance/Occupancy  5/8/2020 DONE
BLD-Final5/6/20205/6/20205/6/2020PPEND
DetailsTony Young
Please note we are waiting on the results for the Mechanical inspection. All T;B documents have been submitted and inspection called for By the mechanical contractor on 5/5, KMD. I do not get the results from that particular inspection results. Any questions please feel free to contact me at anytime.
Thank You, Phone #: ###-#### Inspection requested via web by Ron Oswald// needs trades, // f/l/s
Zoning Approval5/6/20205/6/20205/6/2020 PASS
DetailsKatelyn Menuge
FIRE-Final Inspection5/4/20205/4/20205/4/2020PPASS
DetailsJim Page
No fire sprinklers, no fire alarms, fire extinguishers are placed with current inspection tags in occupied section, none required in vanilla spaces, a knox box has been placed by the main entry. Final life fire safety inspection complete, signature provided on permit sign off card.

Ready for Fire Life safety Inspection- Any questions please feel free to contact me at anytime.
Thank You, Phone #: ###-#### Inspection requested via web by Ron Oswald
BLD-Framing/Rough-in2/28/20203/2/20203/2/2020APASS
DetailsTony Young
Rough Framing for shell portion, Ready Now. Any questions please feel free to contact me at anytime.

Thank You, Phone #: ###-#### Inspection requested via web by Ron Oswald
BLD-Energy code compliance2/20/20202/20/20202/20/2020APART
DetailsTony Young
Partial Insulation inspection at Shear wall/Demising wall in interior Portion of building, For shear placement after passed inspection. Any questions please feel free to contact me at anytime.

Thank You. Phone #: ###-#### Inspection requested via web by Ron Oswald// south end ok
BLD-Framing/Rough-in2/20/20202/20/20202/20/2020APART
DetailsTony Young
Partial Exterior rough Framing for Buildouts at building perimeter. Any questions please feel free to contact me at anytime. Thank You, Phone #: ###-#### Inspection requested via web by Ron Oswald// work in progress,, ok to cover as needed pending trades
BLD-Energy code compliance2/19/20202/20/20202/20/2020PCANC
DetailsTony Young
Partial at The shear wall demising Phone #: ###-#### >> Inspection requested via web by Ron Oswald Inspection cancelled from web by: Ron Oswald
BLD-Framing/Rough-in2/11/20202/12/20202/12/2020PPART
DetailsTony Young
This inspection is for the Roof envelope, Sheeting Etc. Will be ready after 2:00 pm Any questions please feel free to contact me at anytime.

Thank You, Phone #: ###-#### Inspection requested via web by Ron Oswald// roof areas ok to cover
BLD-Concrete1/15/20201/16/20201/16/2020APEND
DetailsTony Young
This inspection is for the Top out lift at the Northeast, East and Southeast cmu wall areas. Mti on schedule for 10:30 am for rebar and grout placement. Any questions or concerns please feel free to contact me at anytime.

Thank You, Phone #: ###-#### Inspection requested via web by Ron Oswald
BLD-Concrete1/13/20201/14/20201/14/2020PPEND
DetailsTony Young
This inspection is for 5th lift at 2:00 pm ready time. MTI on task for Rebar inspection and Grout observation. Any questions please feel free to contact me at anytime.

Thank You, Phone #: ###-#### Inspection requested via web by Ron Oswald
BLD-Concrete1/10/20201/13/20201/13/2020APART
DetailsTony Young
This inspection is for the Balance of the 4th lift at the North East, East and South East block line. Mti scheduled to Inspect and observe at 10:00 am. Any questions or concerns please feel free to contact me at anytime.

Thank You. Phone #: ###-#### Inspection requested via web by Ron Oswald/// met with Special inspector to go over rebar and cold weather issues,, ok pending report
BLD-Concrete1/9/20201/10/20201/10/2020PPEND
DetailsTony Young
This inspection is for partial Forth lift grout at CMU. It was noted as per our conversation that MTI should and will be more thorough while providing special inspections on this project. Again they are scheduled to provide inspection and observation for this Grout process. This grout process is scheduled for 2:00 pm.

Thank You, Phone #: ###-#### Inspection requested via web by Ron Oswald// pending special inspection
BLD-Concrete1/7/20201/8/20201/8/2020APART
DetailsTony Young
This inspection is for the balance of the 3rd lift at 11:00am West and north Walls. MTI on task for inspection and observation at same. I have the MTI prior reports onsite for review. Prisms are made and will be in transit for tomorrow. Any questions please feel free to contact me at anytime.

Thank You, Phone #: ###-#### Inspection requested via web by Ron Oswald// work in progress,, talked with the special inspector about bar overlap etc, will fix various areas
BLD-Concrete1/6/20201/7/20201/7/2020APART
DetailsTony Young
We canceled the afternoon inspections and are rescheduling for same inspection at 3rd lift for CMU rebar- MTI is scheduled for rebar and Observation inspection at 8:00 am. This lift will also entail two sets of pyramids for breaks. any questions please feel free to contact me at anytime.

Thank You Phone #: ###-#### Inspection requested via web by Ron Oswald
BLD-Concrete1/6/20201/7/20201/6/2020PCANC
DetailsTony Young
This inspection is for partial 3rd lift at CMU. Contractor notes they will be ready at 2:00 pm. MTI will be onsite for Rebar and observation this lift.
Any questions please feel free to contact me at anytime.

Thank You, Phone #: ###-#### >> Inspection requested via web by Ron Oswald Inspection cancelled from web by: Ron Oswald
BLD-Concrete1/6/20201/8/20201/6/2020PCANC
DetailsTony Young
This inspection is for partial 3rd lift at CMU. Contractor notes they will be ready at 2:00 pm. MTI will be onsite for Rebar and observation this lift.
Any questions please feel free to contact me at anytime.

Thank You, Phone #: ###-#### >> Inspection requested via web by Ron Oswald Inspection cancelled from web by: Ron Oswald
BLD-Concrete1/2/20201/3/20201/3/2020PPEND
DetailsTony Young
This inspection is for rebar at CMU second lift. MTI on task for observation and Rebar inspection. Foreman states he will be ready for Grout at 2:00 pm. Any questions please feel free to contact me at anytime.
Thank You, Phone #: ###-#### Inspection requested via web by Ron Oswald// pending special inspection report
BLD-Concrete12/27/201912/30/201912/30/2019PPEND
DetailsTell Riley
This is for CMU bar and Grout placement at first 4'' Lift. MTI on board for observation and inspection. Ready at 2:00 pm tentatively Any questions please feel free to call me at anytime.
Thank You, Phone #: ###-#### Inspection requested via web by Ron Oswald//added bar in areas needed per plans//pend specials //
BLD-Concrete12/23/201912/23/201912/23/2019PPEND
DetailsTony Young
This inspection is for Slab preparation to include welded wire and thickened opening pour throughs. Will be ready by 3:00 pm today. MTI will be inspecting and observing placement at 6:00 am Tomorrow.

Thank You, have a great day. Phone #: ###-#### Inspection requested via web by Ron Oswald// slab area ok when ready after raising rebar// pending special inspection
BLD-Footing12/10/201912/10/201912/10/2019PPART
DetailsBrandon Shaw
MTI will be on site for special inspections...
Work in progress...
BLD-Foundation11/26/201911/27/201911/27/2019PPART
DetailsTony Young
Sub contractor stated they would be ready at 1:00 pm, Placement scheduled for 3:00 pm. Any questions please feel free to contact me at anytime.
Thank You, Phone #: ###-#### Inspection requested via web by Ron Oswald// poured,, MTI was on site for special inspections
BLD-Footing11/20/201911/21/201911/21/2019PPART
DetailsTony Young
We will be ready for inspect near 1:00 pm. Any questions please feel free to contact me at anytime.
Thank You, Phone #: ###-#### Inspection requested via web by Ron Oswald// special inspection also on site
Issue PAID IN FULL permit  11/4/2019 DONE
Print Occupancy Form  11/4/2019 DONE
OVERRIDE  10/10/2019  
Plan assigned to (JAR)7/3/20197/10/201910/10/2019 DONE
DetailsJulie Romig
1st Rev Comp - 2nd Comp - State St Dental/Retail Bldg Shell
PLANS/APPL TAKEN TO FRONT DESK  10/10/2019 DONE
Permit Ready to Issue  10/10/2019 
do not issue without BLD19-02529
all met: derek@rrcconstruction.com
Need RP
Need GC
Need rev cert of val
Routing - PLAN CHECK10/9/2019 10/9/2019 PASS
DetailsJulie Romig
Building review passed 9/4/19
Routing PW Drainage10/9/2019 10/9/2019 PASS
DetailsBrian Murphy
Routing - PLAN CHECK8/26/2019 9/4/2019 PASS
DetailsJulie Romig
Routing Off Site - STRUCTURAL8/26/2019 8/28/2019 PASS
DetailsJulie Romig
Route to Impact Fee Review8/16/20198/19/20198/19/2019 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Routing - FIRE7/3/20197/10/20198/16/2019 PASS
DetailsMark Scharfen
08/13/19 - 502 State St Dental/Retail Shell MS review complete. Uploaded rev_fire 08.16.2019.pdf
Routing - PLAN CHECK7/3/2019 8/15/2019 FAIL
DetailsJulie Romig
1st review completed  8/15/2019 DONE
Routing Off Site - STRUCTURAL7/10/2019 7/22/2019 FAIL
DetailsJulie Romig
KPFF
Routing PW Sewer Design7/10/2019 7/18/2019 PASS
DetailsDeAnn Brown
Routing PW Environmental7/10/2019 7/16/2019 PASS
DetailsRick Christenson
Dental Approved. Future tenant spaces need pretreatment review.
Routing - PLUMBING7/3/2019 7/15/2019 PASS
DetailsDaryl Spivey
Per plan and ISPC and NFPA 99 for medical gas piping.
Routing - PLANNING7/3/2019 7/11/2019 PASS
DetailsDavid Moser
Routing - Design Review7/3/2019 7/11/2019 PASS
DetailsKatelyn Menuge
DRH19-00168
Routing - MECHANICAL7/3/2019 7/10/2019 PASS
DetailsTroy James
Routing - Addressing7/3/2019 7/10/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS7/3/2019 7/10/2019 PASS
DetailsAngela Hardy
Routing - Erosion and Sediment7/3/2019 7/10/2019 PASS
DetailsMichael Zawacki
RP needed.
Site prep required.
Routing PW Solid Waste7/10/2019 7/10/2019 PASS
DetailsEvan Carpenter
Enclosure approved for single (1) dumpster.
Routing PW Street Lights7/10/2019 7/10/2019 PASS
DetailsTom Marshall
Intake Approval  7/3/2019 PASS
DetailsJulie Romig
Intake Approval  7/1/2019 FAIL
DetailsJulie Romig
Intake Approval  6/28/2019 FAIL
DetailsJulie Romig
1. Upload a PDF of a second 502 application for the Dental TI Build-out with the tenant name, square footage, occupancy, occupant load and value of work specific to the Dental tenant space. Revise value of work on original application to separate out the Dental TI value of work from the rest of the project value.
2. On all sheets, leave a 4"x2" blank space in the lower right hand corner, located 3" off the right sheet edge.
3. All COMchecks should use the current energy code, 2015 IECC, and have the same Additional Efficiency Package.
Application received  6/27/2019 DONE
Application submitted via PDS Online on Jun 27 2019 11:12AM
Routing PW Drainage7/10/2019   FAIL
DetailsBrian Murphy
NEEDS APNDX J
Routing PW Drainage8/26/2019   FAIL
DetailsBrian Murphy
need apndx j