BLD-Final | 5/7/2020 | 5/8/2020 | 5/8/2020 | P | PASS |
Tony Young
|
|
|
ok pending others
|
PubWorks Occupancy Approval | 5/8/2020 | 5/8/2020 | 5/8/2020 | | DONE |
Tiffany Lowery
|
|
|
|
CHANGE STATUS TO (FNL) | | | 5/8/2020 | | DONE |
|
|
|
Per Tony Young, Finaling permit
|
Letter of compliance/Occupancy | | | 5/8/2020 | | DONE |
|
|
|
|
BLD-Final | 5/6/2020 | 5/6/2020 | 5/6/2020 | P | PEND |
Tony Young
|
|
|
Please note we are waiting on the results for the Mechanical inspection. All T;B documents have been submitted and inspection called for By the mechanical contractor on 5/5, KMD. I do not get the results from that particular inspection results. Any questions please feel free to contact me at anytime. Thank You, Phone #: ###-#### Inspection requested via web by Ron Oswald// needs trades, // f/l/s
|
Zoning Approval | 5/6/2020 | 5/6/2020 | 5/6/2020 | | PASS |
Katelyn Menuge
|
|
|
|
FIRE-Final Inspection | 5/4/2020 | 5/4/2020 | 5/4/2020 | P | PASS |
Jim Page
|
|
|
No fire sprinklers, no fire alarms, fire extinguishers are placed with current inspection tags in occupied section, none required in vanilla spaces, a knox box has been placed by the main entry. Final life fire safety inspection complete, signature provided on permit sign off card.
Ready for Fire Life safety Inspection- Any questions please feel free to contact me at anytime. Thank You, Phone #: ###-#### Inspection requested via web by Ron Oswald
|
BLD-Framing/Rough-in | 2/28/2020 | 3/2/2020 | 3/2/2020 | A | PASS |
Tony Young
|
|
|
Rough Framing for shell portion, Ready Now. Any questions please feel free to contact me at anytime.
Thank You, Phone #: ###-#### Inspection requested via web by Ron Oswald
|
BLD-Energy code compliance | 2/20/2020 | 2/20/2020 | 2/20/2020 | A | PART |
Tony Young
|
|
|
Partial Insulation inspection at Shear wall/Demising wall in interior Portion of building, For shear placement after passed inspection. Any questions please feel free to contact me at anytime.
Thank You. Phone #: ###-#### Inspection requested via web by Ron Oswald// south end ok
|
BLD-Framing/Rough-in | 2/20/2020 | 2/20/2020 | 2/20/2020 | A | PART |
Tony Young
|
|
|
Partial Exterior rough Framing for Buildouts at building perimeter. Any questions please feel free to contact me at anytime. Thank You, Phone #: ###-#### Inspection requested via web by Ron Oswald// work in progress,, ok to cover as needed pending trades
|
BLD-Energy code compliance | 2/19/2020 | 2/20/2020 | 2/20/2020 | P | CANC |
Tony Young
|
|
|
Partial at The shear wall demising Phone #: ###-#### >> Inspection requested via web by Ron Oswald Inspection cancelled from web by: Ron Oswald
|
BLD-Framing/Rough-in | 2/11/2020 | 2/12/2020 | 2/12/2020 | P | PART |
Tony Young
|
|
|
This inspection is for the Roof envelope, Sheeting Etc. Will be ready after 2:00 pm Any questions please feel free to contact me at anytime.
Thank You, Phone #: ###-#### Inspection requested via web by Ron Oswald// roof areas ok to cover
|
BLD-Concrete | 1/15/2020 | 1/16/2020 | 1/16/2020 | A | PEND |
Tony Young
|
|
|
This inspection is for the Top out lift at the Northeast, East and Southeast cmu wall areas. Mti on schedule for 10:30 am for rebar and grout placement. Any questions or concerns please feel free to contact me at anytime.
Thank You, Phone #: ###-#### Inspection requested via web by Ron Oswald
|
BLD-Concrete | 1/13/2020 | 1/14/2020 | 1/14/2020 | P | PEND |
Tony Young
|
|
|
This inspection is for 5th lift at 2:00 pm ready time. MTI on task for Rebar inspection and Grout observation. Any questions please feel free to contact me at anytime.
Thank You, Phone #: ###-#### Inspection requested via web by Ron Oswald
|
BLD-Concrete | 1/10/2020 | 1/13/2020 | 1/13/2020 | A | PART |
Tony Young
|
|
|
This inspection is for the Balance of the 4th lift at the North East, East and South East block line. Mti scheduled to Inspect and observe at 10:00 am. Any questions or concerns please feel free to contact me at anytime.
Thank You. Phone #: ###-#### Inspection requested via web by Ron Oswald/// met with Special inspector to go over rebar and cold weather issues,, ok pending report
|
BLD-Concrete | 1/9/2020 | 1/10/2020 | 1/10/2020 | P | PEND |
Tony Young
|
|
|
This inspection is for partial Forth lift grout at CMU. It was noted as per our conversation that MTI should and will be more thorough while providing special inspections on this project. Again they are scheduled to provide inspection and observation for this Grout process. This grout process is scheduled for 2:00 pm.
Thank You, Phone #: ###-#### Inspection requested via web by Ron Oswald// pending special inspection
|
BLD-Concrete | 1/7/2020 | 1/8/2020 | 1/8/2020 | A | PART |
Tony Young
|
|
|
This inspection is for the balance of the 3rd lift at 11:00am West and north Walls. MTI on task for inspection and observation at same. I have the MTI prior reports onsite for review. Prisms are made and will be in transit for tomorrow. Any questions please feel free to contact me at anytime.
Thank You, Phone #: ###-#### Inspection requested via web by Ron Oswald// work in progress,, talked with the special inspector about bar overlap etc, will fix various areas
|
BLD-Concrete | 1/6/2020 | 1/7/2020 | 1/7/2020 | A | PART |
Tony Young
|
|
|
We canceled the afternoon inspections and are rescheduling for same inspection at 3rd lift for CMU rebar- MTI is scheduled for rebar and Observation inspection at 8:00 am. This lift will also entail two sets of pyramids for breaks. any questions please feel free to contact me at anytime.
Thank You Phone #: ###-#### Inspection requested via web by Ron Oswald
|
BLD-Concrete | 1/6/2020 | 1/7/2020 | 1/6/2020 | P | CANC |
Tony Young
|
|
|
This inspection is for partial 3rd lift at CMU. Contractor notes they will be ready at 2:00 pm. MTI will be onsite for Rebar and observation this lift. Any questions please feel free to contact me at anytime.
Thank You, Phone #: ###-#### >> Inspection requested via web by Ron Oswald Inspection cancelled from web by: Ron Oswald
|
BLD-Concrete | 1/6/2020 | 1/8/2020 | 1/6/2020 | P | CANC |
Tony Young
|
|
|
This inspection is for partial 3rd lift at CMU. Contractor notes they will be ready at 2:00 pm. MTI will be onsite for Rebar and observation this lift. Any questions please feel free to contact me at anytime.
Thank You, Phone #: ###-#### >> Inspection requested via web by Ron Oswald Inspection cancelled from web by: Ron Oswald
|
BLD-Concrete | 1/2/2020 | 1/3/2020 | 1/3/2020 | P | PEND |
Tony Young
|
|
|
This inspection is for rebar at CMU second lift. MTI on task for observation and Rebar inspection. Foreman states he will be ready for Grout at 2:00 pm. Any questions please feel free to contact me at anytime. Thank You, Phone #: ###-#### Inspection requested via web by Ron Oswald// pending special inspection report
|
BLD-Concrete | 12/27/2019 | 12/30/2019 | 12/30/2019 | P | PEND |
Tell Riley
|
|
|
This is for CMU bar and Grout placement at first 4'' Lift. MTI on board for observation and inspection. Ready at 2:00 pm tentatively Any questions please feel free to call me at anytime. Thank You, Phone #: ###-#### Inspection requested via web by Ron Oswald//added bar in areas needed per plans//pend specials //
|
BLD-Concrete | 12/23/2019 | 12/23/2019 | 12/23/2019 | P | PEND |
Tony Young
|
|
|
This inspection is for Slab preparation to include welded wire and thickened opening pour throughs. Will be ready by 3:00 pm today. MTI will be inspecting and observing placement at 6:00 am Tomorrow.
Thank You, have a great day. Phone #: ###-#### Inspection requested via web by Ron Oswald// slab area ok when ready after raising rebar// pending special inspection
|
BLD-Footing | 12/10/2019 | 12/10/2019 | 12/10/2019 | P | PART |
Brandon Shaw
|
|
|
MTI will be on site for special inspections... Work in progress...
|
BLD-Foundation | 11/26/2019 | 11/27/2019 | 11/27/2019 | P | PART |
Tony Young
|
|
|
Sub contractor stated they would be ready at 1:00 pm, Placement scheduled for 3:00 pm. Any questions please feel free to contact me at anytime. Thank You, Phone #: ###-#### Inspection requested via web by Ron Oswald// poured,, MTI was on site for special inspections
|
BLD-Footing | 11/20/2019 | 11/21/2019 | 11/21/2019 | P | PART |
Tony Young
|
|
|
We will be ready for inspect near 1:00 pm. Any questions please feel free to contact me at anytime. Thank You, Phone #: ###-#### Inspection requested via web by Ron Oswald// special inspection also on site
|
Issue PAID IN FULL permit | | | 11/4/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/4/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 10/10/2019 | | |
|
|
|
|
Plan assigned to (JAR) | 7/3/2019 | 7/10/2019 | 10/10/2019 | | DONE |
Julie Romig
|
|
|
1st Rev Comp - 2nd Comp - State St Dental/Retail Bldg Shell
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/10/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/10/2019 | | |
|
|
|
do not issue without BLD19-02529
all met: derek@rrcconstruction.com
Need RP
Need GC
Need rev cert of val
|
Routing - PLAN CHECK | 10/9/2019 | | 10/9/2019 | | PASS |
Julie Romig
|
|
|
Building review passed 9/4/19
|
Routing PW Drainage | 10/9/2019 | | 10/9/2019 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLAN CHECK | 8/26/2019 | | 9/4/2019 | | PASS |
Julie Romig
|
|
|
|
Routing Off Site - STRUCTURAL | 8/26/2019 | | 8/28/2019 | | PASS |
Julie Romig
|
|
|
|
Route to Impact Fee Review | 8/16/2019 | 8/19/2019 | 8/19/2019 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | 7/3/2019 | 7/10/2019 | 8/16/2019 | | PASS |
Mark Scharfen
|
|
|
08/13/19 - 502 State St Dental/Retail Shell MS review complete. Uploaded rev_fire 08.16.2019.pdf
|
Routing - PLAN CHECK | 7/3/2019 | | 8/15/2019 | | FAIL |
Julie Romig
|
|
|
|
1st review completed | | | 8/15/2019 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 7/10/2019 | | 7/22/2019 | | FAIL |
Julie Romig
|
|
|
KPFF
|
Routing PW Sewer Design | 7/10/2019 | | 7/18/2019 | | PASS |
DeAnn Brown
|
|
|
|
Routing PW Environmental | 7/10/2019 | | 7/16/2019 | | PASS |
Rick Christenson
|
|
|
Dental Approved. Future tenant spaces need pretreatment review.
|
Routing - PLUMBING | 7/3/2019 | | 7/15/2019 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC and NFPA 99 for medical gas piping.
|
Routing - PLANNING | 7/3/2019 | | 7/11/2019 | | PASS |
David Moser
|
|
|
|
Routing - Design Review | 7/3/2019 | | 7/11/2019 | | PASS |
Katelyn Menuge
|
|
|
DRH19-00168
|
Routing - MECHANICAL | 7/3/2019 | | 7/10/2019 | | PASS |
Troy James
|
|
|
|
Routing - Addressing | 7/3/2019 | | 7/10/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 7/3/2019 | | 7/10/2019 | | PASS |
Angela Hardy
|
|
|
|
Routing - Erosion and Sediment | 7/3/2019 | | 7/10/2019 | | PASS |
Michael Zawacki
|
|
|
RP needed.
Site prep required.
|
Routing PW Solid Waste | 7/10/2019 | | 7/10/2019 | | PASS |
Evan Carpenter
|
|
|
Enclosure approved for single (1) dumpster.
|
Routing PW Street Lights | 7/10/2019 | | 7/10/2019 | | PASS |
Tom Marshall
|
|
|
|
Intake Approval | | | 7/3/2019 | | PASS |
Julie Romig
|
|
|
|
Intake Approval | | | 7/1/2019 | | FAIL |
Julie Romig
|
|
|
|
Intake Approval | | | 6/28/2019 | | FAIL |
Julie Romig
|
|
|
1. Upload a PDF of a second 502 application for the Dental TI Build-out with the tenant name, square footage, occupancy, occupant load and value of work specific to the Dental tenant space. Revise value of work on original application to separate out the Dental TI value of work from the rest of the project value.
2. On all sheets, leave a 4"x2" blank space in the lower right hand corner, located 3" off the right sheet edge.
3. All COMchecks should use the current energy code, 2015 IECC, and have the same Additional Efficiency Package.
|
Application received | | | 6/27/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 27 2019 11:12AM
|
Routing PW Drainage | 7/10/2019 | | | | FAIL |
Brian Murphy
|
|
|
NEEDS APNDX J
|
Routing PW Drainage | 8/26/2019 | | | | FAIL |
Brian Murphy
|
|
|
need apndx j
|