Temporary Occupancy | 7/2/2020 | 9/30/2020 | 7/2/2020 | | DONE |
Brittany Hill
|
|
|
|
Zoning Approval | 7/1/2020 | 7/1/2020 | 7/1/2020 | | DONE |
Leon Letson
|
|
|
TEMP see email in docs blh 7-2-2020
|
PubWorks Occupancy Approval | 6/30/2020 | 6/30/2020 | 6/30/2020 | | DONE |
Tiffany Lowery
|
|
|
|
PubWorks Occupancy Approval | 6/30/2020 | 6/30/2020 | 6/30/2020 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Final | 6/25/2020 | 6/26/2020 | 6/26/2020 | A | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by bill gullickson
|
Extend Permit 90/180 days | 6/25/2020 | 6/25/2020 | 6/26/2020 | P | DONE |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by bill gullickson// average is 5.2 blower door test
|
BLD-Blower Door Test Results | 6/25/2020 | 6/26/2020 | 6/26/2020 | A | DONE |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by bill gullickson// average 5.6
|
BLD-Final | 6/24/2020 | 6/25/2020 | 6/25/2020 | P | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by bill gullickson// ok pending address posting in units.. putting handrail back up
|
FIRE-Final Inspection | 6/24/2020 | 6/25/2020 | 6/25/2020 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Inspection by Greg.
Phone #: ###-#### Inspection requested via web by bill gullickson
|
FIRE-Final Inspection | 6/23/2020 | 6/24/2020 | 6/24/2020 | A | FAIL |
Jim Page
|
|
|
Correctly repair holes that were next to fire sprinkler heads in furnace closets. CPVC pipe is exposed in side entry closet under the stairs.
Phone #: ###-#### Inspection requested via web by bill gullickson
|
BLD-Final | 6/23/2020 | 6/24/2020 | 6/24/2020 | A | NR |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by bill gullickson
|
BLD-Energy code compliance | 4/14/2020 | 4/15/2020 | 4/16/2020 | P | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by bill gullickson
|
BLD-Energy code compliance | 4/13/2020 | 4/14/2020 | 4/14/2020 | P | PEND |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by bill gullickson// needs re-inspection from fire
|
BLD-Energy code compliance | 4/10/2020 | 4/13/2020 | 4/13/2020 | A | PEND |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by bill gullickson// wind caused sprinkler tenting issues,, ok pending re-inspection pass from fire
|
BLD-Framing/Rough-in | 4/3/2020 | 4/7/2020 | 4/7/2020 | A | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by bill gullickson
|
BLD-Wall Bracing | 3/5/2020 | 3/6/2020 | 3/6/2020 | A | PASS |
Tony Young
|
|
|
Exterior wall shear inspection. Thanks, Phone #: ###-#### Inspection requested via web by Nic Van Diepen
|
CHANGE STATUS TO (ISS) | | | 2/19/2020 | | DONE |
|
|
|
plan mod approved
|
OVERRIDE | | | 2/18/2020 | | |
|
|
|
|
BLD-Wall Bracing | 2/14/2020 | 2/18/2020 | 2/18/2020 | A | CANC |
Tony Young
|
|
|
Ed Phone #: ###-#### Inspection cancelled from web by: Nic Van Diepen
|
Plan assigned to (JG) | 2/7/2020 | 2/7/2020 | 2/18/2020 | | PASS |
Javier Guzman
|
|
|
02/18 plan mod Eaglehawk Fourplex - Bldg 2
|
Routing - PLAN CHECK | 2/12/2020 | | 2/18/2020 | | PASS |
Javier Guzman
|
|
|
|
Permit Ready to Issue | | | 2/18/2020 | | DONE |
|
|
|
**PLAN MOD - DO NOT REISSUE** All plan mod fees assessed on BLD19-02617
|
Routing - MECHANICAL | 2/12/2020 | | 2/12/2020 | | PASS |
Troy James
|
|
|
|
Plan Modification Accepted | | | 2/7/2020 | | DONE |
|
|
|
Plan mod 1
|
BLD-Wall cover | 1/31/2020 | 1/31/2020 | 1/31/2020 | P | PASS |
Tony Young
|
|
|
Exterior walls shear inspection. Please call Ronald when on the way, he will have approved plans for both lots 9;2 - Ronald - ###-####. Thanks, Phone #: ###-#### Inspection requested via web by Nic Van Diepen
|
BLD-Energy code compliance | 11/26/2019 | 11/26/2019 | 11/26/2019 | P | PASS |
Tony Young
|
|
|
Foundation rigid insulation. Thanks, Phone #: ###-#### Inspection requested via web by Nic Van Diepen
|
BLD-Energy code compliance | 11/25/2019 | 11/26/2019 | 11/26/2019 | A | PART |
Tony Young
|
|
|
Foundation wall rigid insulation. Thanks, Phone #: ###-#### Inspection requested via web by Nic Van Diepen
|
BLD-Foundation | 11/19/2019 | 11/20/2019 | 11/20/2019 | P | PASS |
Tony Young
|
|
|
Pat Phone #: ###-####
|
BLD-Foundation | 11/19/2019 | 11/20/2019 | 11/20/2019 | A | PASS |
Tony Young
|
|
|
Ryan Phone #: ###-####
|
BLD-Footing | 11/15/2019 | 11/18/2019 | 11/18/2019 | P | PASS |
Tony Young
|
|
|
Pat Phone #: ###-####
|
Fees Due Hold | 10/5/2019 | | 11/15/2019 | | DONE |
Judith Amador
|
|
|
|
Telephone call | | | 10/4/2019 | | DONE |
|
|
|
called Perryman-talked to
Addy in accounting-she will let the GC know that there are more fees due-i told her they wouldn't be able to schedule and inspection untill it was paid
|
Issue PAID IN FULL permit | | | 9/19/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/19/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 9/18/2019 | | |
|
|
|
|
Plan assigned to (JG) | 7/17/2019 | 7/18/2019 | 9/18/2019 | | PASS |
Javier Guzman
|
|
|
9/20 3rd rev comp, 08/27 - 506 Eaglehawk Fourplex Bldg 2
|
Routing PW Sewer Design | 9/18/2019 | | 9/18/2019 | | PASS |
DeAnn Brown
|
|
|
|
Routing - PLAN CHECK | 9/16/2019 | | 9/18/2019 | | PASS |
Javier Guzman
|
|
|
|
Routing PW Street Lights | 9/16/2019 | | 9/18/2019 | | PASS |
Tom Marshall
|
|
|
signed off in ePlan by PW Street Lights Tom Marshall
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/18/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/18/2019 | | DONE |
|
|
|
Need
ACHD
GC Form
Revised Value
DO NOT ISSUE WITHOUT BLD19-02617-BLD19-02622
|
Routing - Design Review | 9/16/2019 | | 9/17/2019 | | PASS |
Josh Wilson
|
|
|
Revised site and landscape plan ok
|
Routing - PLAN CHECK | 9/3/2019 | | 9/11/2019 | | FAIL |
Javier Guzman
|
|
|
|
Routing - MECHANICAL | 9/3/2019 | | 9/11/2019 | | PASS |
Troy James
|
|
|
Signed off in ePlan by Troy James
|
Routing Off Site - STRUCTURAL | 9/3/2019 | | 9/11/2019 | | PASS |
Javier Guzman
|
|
|
signed off in ePlan by KPFF Engineer
|
Routing PW Drainage | 9/3/2019 | | 9/11/2019 | | PASS |
Melissa Jannusch
|
|
|
Drainage approved under the subdivison review process ODI 3719
|
Routing PW Street Lights | 9/3/2019 | | 9/11/2019 | | PASS |
Tom Marshall
|
|
|
|
Routing - PLANNING | 9/10/2019 | | 9/11/2019 | | PASS |
Leon Letson
|
|
|
signed off in ePlan Planning Leon Letson
|
Routing - FIRE | 9/3/2019 | 9/3/2019 | 9/10/2019 | | PASS |
Mark Scharfen
|
|
|
09/10-Eaglehawk Building 2 Resubmittal fire review complete. Uploaded rev_fire 09.10.2019.pdf
|
Routing - Design Review | 9/3/2019 | | 9/10/2019 | | FAIL |
Josh Wilson
|
|
|
|
Meeting | | | 8/22/2019 | | DONE |
|
|
|
after talking with Doug in addressing-all addresses started as 7485 N Lucy Rose Ln. When the parcel and addresses changed no one changed them so I am doing now. He said to go with what GIS shows. Use the parcel with the correct address.
|
Route to Impact Fee Review | 8/20/2019 | 8/23/2019 | 8/21/2019 | | PASS |
Shannon Cade
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | 7/17/2019 | 7/18/2019 | 8/20/2019 | | FAIL |
Mark Scharfen
|
|
|
08/20-Eaglehawk Fourplex Bldg 2 MS fire review comlete. Uploaded Rev_fire 08.20.2019 and emailed to architect.
|
Routing Off Site - STRUCTURAL | 7/18/2019 | | 8/20/2019 | | CANC |
Javier Guzman
|
|
|
Failed in ePlan by KPFF Engineer
|
Routing PW Street Lights | 7/19/2019 | | 8/20/2019 | | FAIL |
Tom Marshall
|
|
|
Failed in ePlan by PW Street Lights Tom Marshall
|
Routing PW Sewer Design | 7/19/2019 | | 8/20/2019 | | CANC |
DeAnn Brown
|
|
|
Failed in ePlan by PW Sewer Design DeAnn Brown
|
Routing PW Solid Waste | 7/19/2019 | | 8/20/2019 | | PASS |
Evan Carpenter
|
|
|
signed off in ePlan by PW Solid Waste Evan Carpenter
|
1st review completed | | | 8/20/2019 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 7/17/2019 | | 8/20/2019 | | FAIL |
Javier Guzman
|
|
|
|
Routing PW Drainage | 7/19/2019 | | 7/29/2019 | | FAIL |
Melissa Jannusch
|
|
|
Please provide most recent set of Civil Plan dated 10-1-2018
|
Routing - MECHANICAL | 7/17/2019 | | 7/24/2019 | | FAIL |
Troy James
|
|
|
Emailed corrections to Architect
|
Routing - Erosion and Sediment | 7/17/2019 | | 7/23/2019 | | PASS |
Andy J. Long
|
|
|
ESC plan approved, valid RP. Site preparation inspection required.
|
Routing - PLANNING | 7/17/2019 | | 7/21/2019 | | PASS |
Leon Letson
|
|
|
|
Routing - PUBLIC WORKS | 7/17/2019 | | 7/19/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing - Addressing | 7/17/2019 | | 7/18/2019 | | PASS |
Doug Chausow
|
|
|
Corrected addres 7374 N Lucy Rose Ln
|
Routing - PLUMBING | 7/17/2019 | | 7/18/2019 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC
|
Routing - Design Review | 7/17/2019 | | 7/18/2019 | | FAIL |
Andrea Tuning
|
|
|
Locate the street trees along Bogart Lane within the landscape planter located between the sidewalk and the curb line.
Install landscape planter islands at the terminus of each row of parking. The planters shall be a minimum of 8-feet in width (measured inside of curb to inside of curb) and include the required Class II or Class III tree with low shrubs or other vegetative groundcover.
Install a mixture of deciduous and evergreen trees, shrubs, or other vegetative groundcover in the northwest corner of the site that will create a visual barrier that provides a minimum of 60-percent of a barrier within five years of planting for the existing single-family residential dwelling that is an “out parcel”.
Locate all site lighting outside of the required planter islands.
Clearly identify all mechanical units and how they will be screened.
|
Intake Approval | | | 7/17/2019 | | |
Brian McGowan
|
|
|
|
Application received | | | 7/15/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 15 2019 2:09PM
|