Information based on query as of Tuesday, August 27, 2024.
Permit Information
Permit NumberBLD19-02645
StatusIssued
Name STEED CONSTRUCTION
Site Address 4719 S MARKET ST
Project NameCSB warehouse expansion
Customer Number 
ePlanReviewNo
Description
(CSB WAREHOUSE EXPANSION) This building is fire sprinkled for area increase. This building area analysis under previous code modification which required separation by 3-hour fire walls; this permit does not alter any of the 3-hour fire walls so remains under previous code modification for over area. Refer to BLD14-00304 plan review for details. Permit to remove a demising wall separating two warehouse spaces and combine into one warehouse space total 147,205 sq.ft.. Work to include: Demo of an interior demising wall, roof top structural work see engineering package, stairs and landing @ north east man door, (4) new RTU's with new gas lines, electrical work, plumbing work, and relocating a modular office. Separate permit required for racking exceeding 8'-0". Approval of work is contingent on adhering to the approved plans. Any alterations or modifications to the buildings fire sprinkler or fire alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise fire department. MDH
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection6/25/20206/25/20206/25/2020 PASS
DetailsJim Storey
BLD-Aging Inspection6/24/20206/24/20206/24/2020 DEFR
DetailsJim Storey
475 According to city approved drawings the new the new HVAC roof top untis are 3900 CFM each, HVAC units that are more than 2000 CFM requires unit shutdown on in-duct smoke detector activation. A seperate FIR perit will be required for any and all additions/modifications to the fire alarm system, no other items have been inspected.
FIRE-Final Inspection2/10/20202/11/20202/11/2020AFAIL
DetailsJim Page
According to city approved drawings the new the new HVAC roof top untis are 3900 CFM each, HVAC units that are more than 2000 CFM requires unit shutdown on in-duct smoke detector activation. A seperate FIR perit will be required for any and all additions/modifications to the fire alarm system, no other items have been inspected.

Mike Phone #: ###-####
Override - Parcel Holds1/10/20201/1/19001/10/2020  
override
Issue PAID IN FULL permit  8/20/2019 DONE
Telephone call  8/19/2019 DONE
Emailed Zach and Kevin to inform them the fire fee was missed and once that remaining fee is paid for they can pick up their paper plans.
Plan assigned to (M_H)7/24/2019 7/29/2019 DONE
DetailsMichael Hanson
07/29 #518 L2 Paper - CSB Warehouse
1st review completed  7/29/2019 DONE
DetailsMichael Hanson
PLANS/APPL TAKEN TO FRONT DESK  7/29/2019 DONE
DetailsMichael Hanson
Case Summary (BLD)  7/29/2019 DONE
DetailsMichael Hanson
Print Occupancy Form  7/29/2019 DONE
Permit Ready to Issue  7/29/2019 DONE
MET JOSH.KINCAID@STEEDCONSTRUCTION.COM
Need
GC Form
Revised Cert of Value
Telephone call  7/29/2019 DONE
Spoke with Randy informing him that this permit is ready and we will need the 302 & 306 filled out by the GC for us to put the rest of the fees in. Stated he will informed steed construction
Routing - PLAN CHECK7/16/2019 7/29/2019 PASS
DetailsMichael Hanson
Routing - FIRE7/16/20197/16/20197/25/2019 PASS
DetailsMark Scharfen
07.25.2019-Completed fire review. Made notations on plans. Racking changes require additional permit. MS
Plan assigned to (CJW)7/16/2019 7/24/2019 DEFR
DetailsCarl Westfall
minor - paper - 7-23-19
Plan Reviewer's activity  7/16/2019 PASS
Plan intake review approved
Plans ACCEPTED BY PLAN TECH  7/16/2019 DONE
Recd Pcfee & Taken To Pln CK  7/16/2019 DONE
Intake Approval  7/16/2019 PASS
Application received 7/16/2019