BLD-Final | 11/13/2019 | 11/13/2019 | 11/13/2019 | P | PASS |
Tell Riley
|
|
|
Angela Phone #: ###-####//corrections made//
|
DOC - Permit Finaled | 11/13/2019 | 11/13/2019 | 11/13/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD-Final | 11/8/2019 | 11/12/2019 | 11/12/2019 | P | FAIL |
Tell Riley
|
|
|
Angela Phone #: ###-#### cAROLINE###-#### PLEASE CALL FOR ACCESS CODE//smoke detectors outside bedrooms need to be combos//1 per floor//
|
BLD-Energy code compliance | 8/26/2019 | 8/27/2019 | 8/26/2019 | A | CANC |
Tell Riley
|
|
|
Angela Phone #: ###-####
|
BLD-Framing/Rough-in | 8/22/2019 | 8/22/2019 | 8/22/2019 | P | PASS |
Tell Riley
|
|
|
Angela Phone #: ###-####//ok to insulate and vapor barrier//will need to fix cut floor joist in master bathroom//will check at insulation inspection//
|
BLD-Framing/Rough-in | 8/20/2019 | 8/21/2019 | 8/21/2019 | P | FAIL |
Tell Riley
|
|
|
Jenny-call for the access code Phone #: ###-####//correciton notice issued//
|
BLD-Framing/Rough-in | 8/9/2019 | 8/9/2019 | 8/9/2019 | P | CANC |
Tell Riley
|
|
|
Hazen Phone #: ###-####//needs trades permits and inspections prior to framing//
|
Fees Due Hold | 8/7/2019 | | 8/7/2019 | | DONE |
Tiffany Carson-Herker
|
|
|
|
Routing Walk-In (BLD) | 8/6/2019 | 8/6/2019 | 8/6/2019 | P | PASS |
Jenny Nelson
|
|
|
1 hour plan mod
|
Case Summary (BLD) | | | 8/6/2019 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 8/6/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 8/6/2019 | | DONE |
|
|
|
PLAN MOD
|
Inspection Record Card- Bld | | | 8/6/2019 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 8/6/2019 | | DONE |
|
|
|
Fire replacement times two, one window removal, one window size change and stairs.
|
BLD-Foundation | 8/1/2019 | 8/2/2019 | 8/2/2019 | A | PASS |
Tell Riley
|
|
|
Hazen Phone #: ###-####//ok to pour footings//issued correction notice to update plans to reflect all the work being completed//
|
Routing Walk-In (BLD) | 7/26/2019 | 7/26/2019 | 7/26/2019 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 7/26/2019 | | 7/26/2019 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 7/26/2019 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 7/26/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 7/26/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/26/2019 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 7/26/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/26/2019 | | DONE |
|
|
|
|
Application received | | 7/26/2019 | | | |
|
|
|
|