Second Notice | | 3/15/2020 | 3/9/2020 | | DONE |
|
|
|
This permit finaled on the web by Jeremy Barber
|
First Notice | | 2/24/2020 | 3/5/2020 | | DONE |
|
|
|
mailed 3-6-20
|
BLD-Final | 2/13/2020 | 2/14/2020 | 2/14/2020 | A | PASS |
Dave Hannah
|
|
|
Miles Phone #: ###-####
|
Permanent Occupancy | | | 2/14/2020 | | DONE |
|
|
|
|
BLD-Final | 2/11/2020 | 2/12/2020 | 2/12/2020 | P | PART |
Dave Hannah
|
|
|
Miles Phone #: ###-#### ok for tco ok for perm oc after elec gos perm
|
FIRE-Final Inspection | 2/11/2020 | 2/12/2020 | 2/12/2020 | A | PASS |
Jim Page
|
|
|
Previously noted items have been corrected. Fire sprinkler ispection is complete, fire alarm inspection is complete, hood suppression system inspection is complete, fire extinguishers are placed with current inspection tags. Final life fire safety inspection for area of work complete, signatures provided on permit sign off card.
Miles Phone #: ###-####
|
Temporary Occupancy | 2/12/2020 | 5/12/2020 | 2/12/2020 | | DONE |
Gabe Brenner
|
|
|
|
FIRE-Final Inspection | 2/7/2020 | 2/10/2020 | 2/10/2020 | A | FAIL |
Jim Page
|
|
|
Verify emergency egress lighting on exterior is operational could not test at time of inspection, provide current egress plan as discussed with point of contact, approved drawings on site still showed kitchen exit sign above door. Provide maximum occupancy placard. GR miles Phone #: ###-####
|
PubWorks Occupancy Approval | 2/10/2020 | 2/10/2020 | 2/10/2020 | | DONE |
Tiffany Lowery
|
|
|
|
CHANGE STATUS TO (ISS) | | | 2/7/2020 | | DONE |
|
|
|
|
BLD-Conference | 2/5/2020 | 2/6/2020 | 2/6/2020 | A | DONE |
Dave Hannah
|
|
|
walk through // Miles Phone #: ###-####
|
Plan assigned to (CDM) | 2/3/2020 | 2/3/2020 | 2/5/2020 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 2/5/2020 | | 2/5/2020 | | PASS |
Carl D Madsen
|
|
|
|
Permit Ready to Issue | | | 2/5/2020 | | DONE |
|
|
|
plan mod approved
|
Plan Modification Accepted | | | 2/3/2020 | | DONE |
|
|
|
Walter Lindgren of Lindgren:Labrie submitted a 522 application. Elimination of illuminated exit sign from exterior door, not required to be an exit. Sheet: A0.1 Code Analysis and Exiting Plan
|
BLD-Ceiling Grid Inspection | 1/16/2020 | 1/17/2020 | 1/17/2020 | P | PASS |
Dave Hannah
|
|
|
Miles Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 1/9/2020 | 1/10/2020 | 1/13/2020 | P | PEND |
Dave Hannah
|
|
|
Miles Phone #: ###-#### still working on grid first layer of shaft repair ok
|
BLD-Framing/Rough-in | 1/8/2020 | 1/9/2020 | 1/9/2020 | A | PART |
Dave Hannah
|
|
|
miles Phone #: ###-#### shaft wall repair
|
BLD-Ceiling Grid Inspection | 12/30/2019 | 12/30/2019 | 12/30/2019 | P | PASS |
Dave Hannah
|
|
|
Miles Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 12/23/2019 | | DONE |
|
|
|
|
Plan assigned to (CDM) | 12/3/2019 | 12/3/2019 | 12/16/2019 | | PASS |
Carl D Madsen
|
|
|
plan mod #1 -Redesign of rooftop mechanical equipment support frame.
|
Routing - PLAN CHECK | 12/10/2019 | | 12/16/2019 | | PASS |
Carl D Madsen
|
|
|
|
Permit Ready to Issue | | | 12/16/2019 | | |
|
|
|
**DO NOT REISSUE - PLAN MOD**
|
Plan Modification Accepted | | | 12/3/2019 | | DONE |
|
|
|
plan mod #1 -Redesign of rooftop mechanical equipment support frame.
|
BLD-Framing/Rough-in | 11/27/2019 | 11/27/2019 | 11/27/2019 | P | PASS |
Dave Hannah
|
|
|
Miles Phone #: ###-####
|
BLD-Framing/Rough-in | 11/8/2019 | 11/12/2019 | 11/13/2019 | P | PASS |
Dave Hannah
|
|
|
Miles Phone #: ###-####
|
Issue PAID IN FULL permit | | | 10/31/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/31/2019 | | DONE |
|
|
|
|
Plan assigned to (CDM) | 8/19/2019 | 8/19/2019 | 10/8/2019 | | PASS |
Carl D Madsen
|
|
|
Taziki's L-3
|
Routing - PLAN CHECK | 9/26/2019 | | 10/8/2019 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/8/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/8/2019 | | DONE |
|
|
|
NEED
MET
GC
MET
ACHD
|
Routing - MECHANICAL | 9/26/2019 | | 9/30/2019 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 9/11/2019 | 9/14/2019 | 9/12/2019 | | PASS |
Shannon Cade
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | 8/19/2019 | 8/19/2019 | 9/11/2019 | | PASS |
Mark Scharfen
|
|
|
09/11-Completed fire review. Uploaded rev_fire 09.11.2019.pdf
|
1st review completed | | | 9/11/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 8/19/2019 | | 9/11/2019 | | FAIL |
Carl D Madsen
|
|
|
|
Routing PW Environmental | 8/19/2019 | | 8/27/2019 | | PASS |
Rick Christenson
|
|
|
Connecting to existing grease interceptor.
|
Routing - MECHANICAL | 8/19/2019 | | 8/23/2019 | | FAIL |
Troy James
|
|
|
See eplan for corrections
|
Routing - PLANNING | 8/19/2019 | | 8/20/2019 | | PASS |
David Moser
|
|
|
|
Routing - Addressing | 8/19/2019 | | 8/20/2019 | | PASS |
Doug Chausow
|
|
|
Added suite #100
|
Routing - PUBLIC WORKS | 8/19/2019 | | 8/19/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing - PLUMBING | 8/19/2019 | | 8/19/2019 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC
|
Intake Approval | | | 8/12/2019 | | PASS |
|
|
|
|
Application received | | | 8/5/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 5 2019 8:16AM
|