Permit Information
Permit NumberBLD19-02992
StatusFinaled
Name BLUE RAVEN SOLAR LLC
Site Address 2813 N 28TH ST
Project NameMary Grant PV
Customer Number 
ePlanReviewYes
Description
MODIFICATION TO PANEL WATTAGE 2-12-20 **JAB** Permit for 420sq' of roof-mounted, grid-tied Photo-voltaic panels with micro-inverters; 24 panels in 3 arrays. No work needed to the existing roof structure per engineer’s roof evaluation. All racking, modules, and other listed equipment must be installed by a certified installer. All work per plans, engineering, manufacturer’s specs, & local code. Separate electrical permit required. **JAB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/19/20202/20/20202/20/2020PDONE
DetailsTony Young
Phone number provided is for the onsite contact; BRS technician, Mierens Rozental. Phone #: ###-#### Inspection requested via web by BRS Permitting
DOC - Permit Finaled2/20/20202/20/20202/20/2020PPASS
DetailsTony Young
done
Permit Ready to Issue  2/13/2020 DONE
plan mod approved
CHANGE STATUS TO (ISS)  2/13/2020 DONE
plan mod approved
Plan assigned to (JAB) Josh2/3/20202/3/20202/12/2020 PASS
DetailsJosh Bogle
plan mod request per Hannah Webb per email see doc- panel and kw changed
Routing - PLAN CHECK2/3/2020 2/12/2020 PASS
DetailsJosh Bogle
plan mod
CHANGE STATUS TO (REV)  2/6/2020 DONE
did not mean to make ready. Still waiting for plan reviewer to review plan mod
Plan Modification Accepted  2/3/2020 DONE
plan mod request per Hannah Webb per email see doc
Permit Ready to Issue  2/3/2020 DONE
**PLAN MOD - DO NOT REISSUE**
Routing - PLANNING2/3/2020 2/3/2020 PASS
DetailsSue Cummings
BLD-Framing/Rough-in1/17/20201/21/20201/21/2020PPART
DetailsTony Young
Marcus will be the site contact Phone #: ###-#### Inspection requested via web by BRS Permitting// roof frame supporting work in progress,, ok
Issue PAID IN FULL permit  9/4/2019 DONE
Inspection Record Card- Bld  9/4/2019 DONE
Plan assigned to (JAB) Josh8/6/20198/6/20198/30/2019 PASS
DetailsJosh Bogle
08/12 PV, ePlan - 1st done
Routing - PLAN CHECK8/30/2019 8/30/2019 PASS
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  8/30/2019 DONE
DetailsJosh Bogle
ESC no - Energy no
Permit Ready to Issue  8/30/2019 DONE
Routing - PLAN CHECK8/6/2019 8/12/2019 FAIL
DetailsJosh Bogle
inadequate structural engineering
1st review completed  8/12/2019 FAIL
DetailsJosh Bogle
Application received  8/6/2019 DONE
Application submitted via PDS Online on Aug 6 2019 1:14PM
Plans ACCEPTED BY PLAN TECH  8/6/2019 DONE
Intake Approval  8/6/2019 PASS
Recd Pcfee & Taken To Pln CK  8/6/2019 DONE
Routing - PLANNING8/6/2019 8/6/2019 PASS
DetailsJeff Lowe