BLD-Energy code compliance | 5/28/2020 | 5/28/2020 | 5/28/2020 | A | PASS |
Tell Riley
|
|
|
corrections made//
|
BLD-Energy code compliance | 5/27/2020 | 5/27/2020 | 5/27/2020 | A | PART |
Tell Riley
|
|
|
Inspection requested via web by Carl Funk//add hangers to area above stairs as discussed//add VB at areas discussed//add truss bracing//add r20 min inuslation in areas r19 was installed//framing that is different than plans is in accordance with engineers site walk though and accepted by him on the first eight units, same framing used on this unit//
|
BLD-Framing/Rough-in | 5/22/2020 | 5/22/2020 | 5/22/2020 | A | PART |
Tell Riley
|
|
|
Inspection requested via web by Carl Funk//ok to insulate only//add stud for 2nd floor bearing at stairs marked in green//need joist repair//add truss bracing//address head height at stairs//
|
BLD-Framing/Rough-in | 5/21/2020 | 5/21/2020 | 5/21/2020 | A | NR |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Carl Funk//see Joey onsite for corrections list//framing that differs on plans, appears to meet engineers onsite walk through as per the other units//need truss plans on next inspection//also see green marks on plans and in buildings//
|
BLD-Wall Bracing | 5/14/2020 | 5/14/2020 | 5/14/2020 | P | PASS |
Tell Riley
|
|
|
fire wall Inspection requested via web by Carl //interior shear on fire wall//screws/ nails ok per plans, compliant with engineers email stating blocking is not needed at edges//still need rating for ele heater box in rated wall//
|
BLD-Wall Bracing | 5/13/2020 | 5/13/2020 | 5/13/2020 | P | FAIL |
Tell Riley
|
|
|
Firewall Shear Phone #: ###-#### Inspection requested via web by Carl Funk//Not ready, not all walls hung, nailing needs to be done at all plates//still need verifiction of ele heater boxes in firewall//
|
BLD-Wall Bracing | 5/12/2020 | 5/12/2020 | 5/12/2020 | P | CANC |
Tell Riley
|
|
|
Firewall Shear Phone #: ###-#### Inspection requested via web by Carl Funk
|
BLD-Energy code compliance | 5/7/2020 | 5/8/2020 | 5/8/2020 | A | PART |
Tell Riley
|
|
|
Firewall insulation Inspection requested via web by Carl Funk//fire separation walls only//per plans//
|
BLD-Framing/Rough-in | 5/7/2020 | 5/8/2020 | 5/8/2020 | A | PART |
Tell Riley
|
|
|
Firewall Inspection requested via web by Carl Funk//fire separation wall only//Corrections made//need rating information for ele heater box in rated wall(all Units)//
|
BLD-Framing/Rough-in | 5/7/2020 | 5/7/2020 | 5/7/2020 | A | FAIL |
Tell Riley
|
|
|
Fore blocking firewall Phone #: ###-#### Inspection requested via web by Carl Funk/framing for fire walls ONLY//add nuts and bolts in areas noted//add studs in areas noted//add fire blocking in areas noted//see details for truss connections at fire walls//complete air seal//
|
BLD-Energy code compliance | 5/7/2020 | 5/7/2020 | 5/7/2020 | A | NR |
Tell Riley
|
|
|
Insulation firewall
Phone #: ###-#### Inspection requested via web by Carl Funk
|
BLD-Energy code compliance | 5/5/2020 | 5/5/2020 | 5/5/2020 | A | NR |
Tell Riley
|
|
|
Firewall insulation Phone #: ###-#### Inspection requested via web by Carl Funk/needs framing inspeciton completed on separation walls prior to insulation//will reschedule when insulation is removed//
|
Routing - MECHANICAL | 3/26/2020 | | 3/26/2020 | | PASS |
Troy James
|
|
|
Resubmitted ACCA report
|
BLD-Wall Bracing | 3/19/2020 | 3/20/2020 | 3/20/2020 | A | PART |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Carl Funk
|
BLD-Wall Bracing | 3/16/2020 | 3/17/2020 | 3/17/2020 | A | FAIL |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Carl Funk//need to add nails, fix hold downs nails//did walk through with carl//add hold downs where needed//
|
OVERRIDE | | | 2/18/2020 | | |
|
|
|
|
Plan assigned to (RDP) | 2/11/2020 | 2/11/2020 | 2/18/2020 | | DONE |
Rob Patrick
|
|
|
02/17 Plan Mod
|
Routing - PLAN CHECK | 2/18/2020 | | 2/18/2020 | | PASS |
Rob Patrick
|
|
|
1 Hour Plan Review Charge
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/18/2020 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 2/18/2020 | | DONE |
|
|
|
**DO NOT REISSUE - PLAN MOD** Fees assessed on BLD19-03180
|
CHANGE STATUS TO (ISS) | | | 2/18/2020 | | DONE |
|
|
|
plan mod
|
Plan Modification Accepted | | | 2/11/2020 | | DONE |
|
|
|
2 copies of Sheet A4.4.
|
BLD-Foundation | 12/13/2019 | 12/13/2019 | 12/13/2019 | P | PART |
Tell Riley
|
|
|
Gibert Phone #: ###-####//WIP//still need to install hold downs//
|
BLD-Footing | 12/10/2019 | 12/11/2019 | 12/11/2019 | A | PASS |
Tell Riley
|
|
|
GILBERT Phone #: ###-####//ok per details, site plan and survey pins//
|
Issue PAID IN FULL permit | | | 11/15/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 11/14/2019 | | |
|
|
|
|
Routing - PLAN CHECK | 11/14/2019 | | 11/14/2019 | | PASS |
Jenny Nelson
|
|
|
Per RDP review
|
Case Summary (BLD) | | | 11/14/2019 | | DONE |
Jenny Nelson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/14/2019 | | DONE |
Jenny Nelson
|
|
|
|
Inspection Record Card- Bld | | | 11/14/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/14/2019 | | DONE |
|
|
|
met
|
Plan assigned to (RDP) | 8/20/2019 | | 11/14/2019 | | DONE |
Rob Patrick
|
|
|
09/06 sfd L2 PAPER...09/17 Failed...11/7 Failed
|
Routing - PLAN CHECK | 11/7/2019 | | 11/7/2019 | | FAIL |
Rob Patrick
|
|
|
Correction on sheet A4.4
|
Routing - PLANNING | 11/1/2019 | | 11/1/2019 | | PASS |
David Moser
|
|
|
|
Plan resubmittals received | | | 10/25/2019 | | DONE |
|
|
|
Applicant dropped off 2 copies of resubmittal. Sheets: A1.0, A2.1, A2.3, A4.1, S2.1, S2.2A, S2.3A, S2.4A, S2.6, S2.9, S3.0
|
Routing - FIRE | 9/6/2019 | 9/6/2019 | 9/17/2019 | | PASS |
Lee G Meredith
|
|
|
09/11-13A2 7755 W Crestwood Residential Paper 402
Sprinklers are not required.
|
1st review completed | | | 9/17/2019 | | FAIL |
Rob Patrick
|
|
|
Corrections Req'd
|
Plan resubmittals received | | | 9/17/2019 | | DONE |
|
|
|
2 large plan- A4.4, S2.1, S2.2, S2.6, S2.7 and S2.8
and 16 RES-Checks
Taken to Rob
|
Routing - PLAN CHECK | 8/20/2019 | | 9/17/2019 | | FAIL |
Rob Patrick
|
|
|
Corrections Req'd
|
Routing - PUBLIC WORKS | 8/20/2019 | | 9/10/2019 | | PASS |
Angela Hardy
|
|
|
|
Plan Reviewer's activity | | | 9/10/2019 | | |
|
|
|
Took entire package to Public Works.
|
Plan Reviewer's activity | | | 9/6/2019 | | |
|
|
|
Received pacjage late in the review timeframe. Started review on due date but it will still need to be sent to Fire and PW.
|
Plan resubmittals received | | | 8/28/2019 | | DONE |
|
|
|
Two copies each of Landscaping plans stamped and taken to plan reviewer
|
Routing - MECHANICAL | 8/20/2019 | | 8/27/2019 | | PASS |
Chad Schwendiman
|
|
|
|
Routing - PLANNING | 8/20/2019 | | 8/26/2019 | | FAIL |
David Moser
|
|
|
Need to submit a Landscape Plan
|
Routing - Design Review | 8/23/2019 | | 8/26/2019 | | PASS |
Katelyn Menuge
|
|
|
Redlined facade and landscape changes.
|
Route to Impact Fee Review | 8/21/2019 | 8/24/2019 | 8/22/2019 | | PASS |
Shannon Cade
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 8/20/2019 | | 8/22/2019 | | PASS |
Doug Chausow
|
|
|
|
Telephone call | | | 8/20/2019 | | DONE |
|
|
|
Spoke with Carl, he informed me that he is going to submit paper instead of Eplan.
|
Plans ACCEPTED BY PLAN TECH | | | 8/20/2019 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/20/2019 | | DONE |
|
|
|
|
Intake Approval | | | 8/20/2019 | | PASS |
|
|
|
|
Application received | | | 8/19/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 19 2019 9:47PM
|