BLD-Final | 3/12/2020 | 3/13/2020 | 3/13/2020 | P | PEND |
Mike Jordan
|
|
|
Taylor Phone #: ###-####. Needs test data for PVC ceiling tile.
|
FIRE-Final Inspection | 3/12/2020 | 3/13/2020 | 3/13/2020 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Taylor Phone #: ###-####
|
FIRE-Conference | 2/18/2020 | 2/19/2020 | 2/19/2020 | A | DONE |
Troy Cobbley
|
|
|
Conference was over the door hardware for the escape rooms. The hardware operation needs to meet Chapter 10 of the fire and building codes. It appears that sections 1010.1.9.8 and 1010.1.9.9 would be the applicable code sections. Also a fire alarm permit is required for the fire alarm interconnect required per the drawings and IFC section 1010.1.9.8. Also the project related fire sprinkler permit needs finaled.
Taylor Phone #: ###-####
|
BLD-Final | 2/14/2020 | 2/18/2020 | 2/18/2020 | P | NR |
Mike Jordan
|
|
|
call for access- Taylor Phone #: ###-####
|
FIRE-Final Inspection | 2/14/2020 | 2/18/2020 | 2/18/2020 | A | CANC |
Troy Cobbley
|
|
|
Need the project related fire sprinkler permit addressed and a separate FIR permit is needed for the alarm work.
call for access- Taylor Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 1/8/2020 | 1/8/2020 | 1/8/2020 | P | PASS |
Mike Jordan
|
|
|
Taylor Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 1/7/2020 | 1/8/2020 | 1/8/2020 | A | FAIL |
Mike Jordan
|
|
|
Taylor Phone #: ###-####
|
BLD-Framing/Rough-in | 11/12/2019 | 11/13/2019 | 11/13/2019 | A | PASS |
Brandon Shaw
|
|
|
Bathroom walls, ok to cover pending trades aprroval... All other areas, ok to cover...
|
BLD-Framing/Rough-in | 11/7/2019 | 11/8/2019 | 11/7/2019 | A | CANC |
Mike Jordan
|
|
|
Escape Rooms Phone #: ###-#### >> Inspection requested via web by Blake Neeser Inspection cancelled from web by: Blake Neeser
|
Issue PAID IN FULL permit | | | 10/10/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/10/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/9/2019 | | 10/9/2019 | | PASS |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/9/2019 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 10/9/2019 | | DONE |
|
|
|
ALL MET
Need GC
Need rev cert of val
|
Plan assigned to (M_H) | 9/5/2019 | | 10/9/2019 | | DONE |
Michael Hanson
|
|
|
1st review completed - 10/02 #520 L3 ePlan - Escape The Room - BTS #1051
|
Route to Impact Fee Review | 10/2/2019 | 10/5/2019 | 10/3/2019 | | PASS |
Shannon Cade
|
|
|
Review requested for Commercial Permit
|
Routing - PLAN CHECK | 9/5/2019 | | 10/2/2019 | | FAIL |
Michael Hanson
|
|
|
See changemarks in ePlan for corrections required.
|
1st review completed | | | 10/2/2019 | | FAIL |
Michael Hanson
|
|
|
|
Routing - FIRE | 9/5/2019 | 9/5/2019 | 9/30/2019 | | PASS |
Mark Stumbaugh
|
|
|
10/02-BTS #1051 Escape the Room TI 520
|
Telephone call | | | 9/24/2019 | | DONE |
|
|
|
cusotmer called wanting conference inspeciton-told him the permit had to be issued before we could schedule and inspection
|
Routing - MECHANICAL | 9/5/2019 | | 9/10/2019 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 9/5/2019 | | 9/6/2019 | | PASS |
Dan Ediger
|
|
|
Per plans and ISPC
|
Routing - Addressing | 9/5/2019 | | 9/6/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 9/5/2019 | | 9/6/2019 | | PASS |
Angela Hardy
|
|
|
|
Intake Approval | | | 9/5/2019 | | PASS |
Javier Guzman
|
|
|
Prescreen approved by JG.
|
Intake Approval | | | 8/30/2019 | | FAIL |
Javier Guzman
|
|
|
The ComCheck was not found on plan sheet E3.0 as noted on checklist
|
Intake Approval | | | 8/29/2019 | | FAIL |
Javier Guzman
|
|
|
This is a assembly change in use project provide and upload a completed 520 application and 520 checklist with any additional items requested from the checklist
|
Application received | | | 8/28/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 28 2019 2:53PM
|