Permit Information
Permit NumberBLD19-03480
StatusFinaled
Name DEBELLOY CONSTRUCTION
Site Address 5602 W STATE ST
Project NameGyro Shack
Customer Number 
ePlanReviewYes
Description
(GYRO SHACK – KITCHEN EQUIPMENT) //3-17-2020 PLAN MODIFICATION TO RELOCATE SELECT KITCHEN EQUIPMENT TO PROVIDE CLEARENCE AT HOOD. Jg// Permit is to remodel an existing 382 sq. ft. drive-up coffee shop building. Approval is contingent upon adhering to the approved plans on file and attached engineering. Work to include: removal of select kitchen equipment, removal of select rooftop hvac equipment, select new structural roof modification for new roof equipment per design engineering, new type 1 hood, select new kitchen equipment, new rooftop MAU and adding a vertical grab bar within existing restroom, electrical work, mechanical work and interior finishes in compliance with Ch. 8 of the 2015 IBC. This building is Not Fire Sprinklered. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled  5/8/2020 DONE
Letter of compliance/Occupancy  5/8/2020 DONE
BLD-Final4/21/20204/21/20204/21/2020PPASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by kevin debelloy
FIRE-Final Inspection4/21/20204/21/20204/21/2020PPASS
DetailsJim Page
Permit for hood suppression is finaled, final inspection for life fire safety is complete.
Fees Due Hold4/21/2020 4/21/2020 DONE
Details
BLD-Final4/19/20204/20/20204/20/2020PCANC
DetailsTony Young
>> Inspection requested via web by kevin debelloy Inspection cancelled from web by: kevin debelloy
FIRE-Final Inspection4/19/20204/20/20204/20/2020AFAIL
DetailsJim Page
FIR permit for commercial hood fire suppression system must be finaled before life fire safety inspection can be complete, hood suppression inspection resulted in a failure, notes entered under FIR20-00140., a re-inspection fee has been added to permit due too 2 failures on permit.
Inspection requested via web by kevin debelloy
FIRE-Final Inspection4/17/20204/17/20204/17/2020ACANC
DetailsJim Page
Phone #: ###-#### >> Inspection requested via web by kevin debelloy Inspection cancelled from web by: kevin debelloy
BLD-Final4/17/20204/17/20204/17/2020PCANC
DetailsTony Young
Phone #: ###-#### >> Inspection requested via web by kevin debelloy Inspection cancelled from web by: kevin debelloy
FIRE-Final Inspection4/9/20204/14/20204/14/2020AFAIL
DetailsJim Page
FIR permit (FIR20-00140) for hood suppression system needs to be finaled before life fire safety can be completed.

Inspector please call 30 minutes before arrival Phone #: ###-#### Inspection requested via web by kevin debelloy
BLD-Framing/Rough-in4/9/20204/13/20204/13/2020ADONE
DetailsTony Young
Inspector please call 30 minutes before arrival Phone #: ###-#### Inspection requested via web by kevin debelloy// nothing needed per contractor and engineer
BLD-Final4/9/20204/13/20204/9/2020PCANC
DetailsTony Young
Inspector please call 30 minutes before arrival Phone #: ###-#### >> Inspection requested via web by kevin debelloy Inspection cancelled from web by: kevin debelloy
CHANGE STATUS TO (ISS)  3/27/2020 DONE
plan mod
Telephone call  3/26/2020 DONE
Emailed GC the 306 form to update the values for this plan mod.
Plan assigned to (JG)3/12/20203/12/20203/25/2020 PASS
DetailsJavier Guzman
03/20 Plan Mod Gyro Shack ePlan
Routing - PLAN CHECK3/17/2020 3/25/2020 PASS
DetailsJavier Guzman
Routing PW Environmental3/17/2020 3/25/2020 PASS
DetailsZach Conde
Signed off in ePlan by PW Enviormental Zach Conde-NOTE FROM ZACH-This one we failed back in December for not having grease abatement. They submitted GT specs directly to me. Passed on ePlan with this comment:
Permit Ready to Issue  3/25/2020 DONE
*PLAN MOD - DO NOT REISSUE**
Need
Revised Value (Plan mod application states the value is being affected)
Routing - FIRE3/17/20203/17/20203/24/2020 PASS
DetailsErika Akin
Plan Mod to relocate kitchen equipment. No change to previous comments.
Routing - MECHANICAL3/17/2020 3/20/2020 PASS
DetailsTroy James
Routing - PUBLIC WORKS3/17/2020 3/17/2020 PASS
DetailsRita DeYoung
BLD-Conference3/12/20203/12/20203/12/2020PDONE
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by kevin debelloy
Plan Modification Accepted  3/12/2020 DONE
adjustment to hood location for ADA egress clearance at hood
Release Hold on Job  1/27/2020 DONE
waiting for signed permit
Telephone call  1/27/2020 DONE
Emailed a reminder to the GC and applicant that we still need the permit to be signed before we can release the approved plans.
Issue PAID IN FULL permit  1/23/2020 DONE
Inspection Record Card- Bld  1/23/2020 DONE
Plan assigned to (JG)11/20/201911/20/201912/13/2019 PASS
DetailsJavier Guzman
12/19 2nd rev comp, 12/02 L2 Gyro Shack ePlan, pend PW envior
Routing - PLAN CHECK12/13/2019 12/13/2019 PASS
DetailsJavier Guzman
Routing PW Environmental12/13/2019 12/13/2019 PASS
DetailsJavier Guzman
signed off in ePlan by PW Pre-Treatment Zach Conde

PLANS/APPL TAKEN TO FRONT DESK  12/13/2019 DONE
Permit Ready to Issue  12/13/2019 DONE
all met: jeff@hatchda.com

Need
GC Form
Revised Cert of Value
Route to Impact Fee Review12/4/201912/7/201912/5/2019 PASS
DetailsTravis P Black
Review requested for Commercial Permit
Routing - PLAN CHECK11/20/2019 12/4/2019 PASS
DetailsJavier Guzman
Routing Off Site - C.D.H11/20/2019 12/4/2019 PASS
DetailsJavier Guzman
Signed off in ePlan by Central District Health Department Scott Paradis

1st review completed  12/4/2019 FAIL
DetailsJavier Guzman
Routing - FIRE11/20/201911/20/201912/3/2019 PASS
DetailsErika Akin
Attached comments to case
Routing - MECHANICAL11/20/2019 11/25/2019 PASS
DetailsTroy James
Routing - PUBLIC WORKS11/20/2019 11/20/2019 PASS
DetailsMorgan Webb
NO ADDITION OF CUSTOMER SERVICE AREA
Routing - Addressing11/20/2019 11/20/2019 PASS
DetailsDoug Chausow
Routing PW Environmental11/20/2019 11/20/2019 FAIL
DetailsRick Christenson
No grease abatement shown. Suitable and adequate grease abatement must be provided. Contact Zach Conde ###-####
Routing - Design Review11/20/2019 11/20/2019 PASS
DetailsKatelyn Menuge
Intake Approval  11/19/2019 PASS
DetailsJavier Guzman
Intake Approval  9/11/2019 FAIL
DetailsJavier Guzman
For prescreen review provide and upload the following per checklist:
• Per checklist mechanical plans are required stamped and signed by an Idaho licensed engineer.
• With the new 839 lbs. MAU provide engineering calculations to show existing roof can support the new equipment load
• Provide DR letter of approval for the new exterior rooftop equipment or provide email transcript stating no approval letter is required.
Application received  9/7/2019 DONE
Application submitted via PDS Online on Sep 7 2019 1:20PM