BLD-Final | 3/9/2020 | 3/10/2020 | 3/10/2020 | A | PASS |
Brandon Shaw
|
|
|
Greg Phone #: ###-####
|
DOC - Permit Finaled | 3/10/2020 | 3/10/2020 | 3/10/2020 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Final | 3/6/2020 | 3/9/2020 | 3/9/2020 | A | FAIL |
Brandon Shaw
|
|
|
R308.4.6. Glazing adjacent to stairs...to be tempered. R311.7.8.2 Handrail continuity...
|
BLD-Final | 3/5/2020 | 3/6/2020 | 3/6/2020 | A | NH |
Brandon Shaw
|
|
|
No access...
|
FIRE-Final Inspection | 3/5/2020 | 3/5/2020 | 3/5/2020 | P | CANC |
Jim Page
|
|
|
Permit details shows signature not required for fire life safety, this request is cancelled, point of contact has been notified.
Craig Phone #: ###-####
|
BLD-Framing/Rough-in | 2/18/2020 | 2/19/2020 | 2/19/2020 | A | DEFR |
Jim Storey
|
|
|
Greg Phone #: ###-#### to mech for pm insp.
|
BLD-Conference | 2/18/2020 | 2/18/2020 | 2/18/2020 | P | DONE |
Jim Storey
|
|
|
Greg Phone #: ###-#### Please call when on your way mech to resolve
|
BLD-Energy code compliance | 11/13/2019 | 11/14/2019 | 11/14/2019 | A | PASS |
Brandon Shaw
|
|
|
Corrections SAT... OK to cover...
|
BLD-Framing/Rough-in | 11/11/2019 | 11/12/2019 | 11/12/2019 | A | PART |
Jim Storey
|
|
|
there is a lock box on the back door of the house please call to get access code to get in. Mechanical, plumbing and electric have all passed I just need to get approval to insulate and cover. ###-#### Phone #: ###-#### Inspection requested via web by Greg Loehr header at fireplace/saftey glass at stair landing/ fire blk 2 nnd floor mech chase// ok to insulate.
|
Routing - MECHANICAL | 11/6/2019 | | 11/6/2019 | | PASS |
Troy James
|
|
|
Revised manual j report
|
Routing Walk-In (BLD) | 9/18/2019 | 9/18/2019 | 9/18/2019 | P | PASS |
Jenny Nelson
|
|
|
|
Plan assigned to (JAB) Josh | 9/10/2019 | 9/10/2019 | 9/18/2019 | | PASS |
Josh Bogle
|
|
|
09/13 fire fix, paper - 1st done
|
Inspection Record Card- Bld | | | 9/18/2019 | | DONE |
Jenny Nelson
|
|
|
|
Case Summary (BLD) | | | 9/18/2019 | | DONE |
Jenny Nelson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/18/2019 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 9/18/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/18/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/16/2019 | | 9/17/2019 | | FAIL |
Josh Bogle
|
|
|
need legibel floor plans
|
1st review completed | | | 9/17/2019 | | FAIL |
Josh Bogle
|
|
|
|
Routing - MECHANICAL | 9/10/2019 | | 9/16/2019 | | PASS |
Troy James
|
|
|
|
Routing Walk-In (BLD) | 9/10/2019 | 9/10/2019 | 9/10/2019 | P | PASS |
Josh Bogle
|
|
|
took in as a level two and routed
|
Application received | | 9/10/2019 | | | |
|
|
|
|