BLD-Framing/Rough-in | 8/12/2020 | 8/12/2020 | 8/12/2020 | P | PASS |
Jim Storey
|
|
|
Chris *screened Phone #: ###-#### bathrooms 2nd floor ok to cover// gyp ceillings 2nd floor ok to cover// wall framing 1st floor ok
|
BLD-Framing/Rough-in | 7/30/2020 | 7/31/2020 | 7/31/2020 | A | PASS |
Jim Storey
|
|
|
Screened- Jeff Phone #: ###-#### walls/soffts and hard lids ok to cover 1st floor phase 2
|
BLD-Framing/Rough-in | 7/21/2020 | 7/21/2020 | 7/21/2020 | P | PASS |
Jim Storey
|
|
|
Nate - */Screened no symptoms in the last 2 weeks per Nate. Able to wear masks*/ Phone #: ###-####
|
BLD-Framing/Rough-in | 7/6/2020 | 7/6/2020 | 7/6/2020 | P | PASS |
Jim Storey
|
|
|
Nate Phone #: ###-#### center space.
|
BLD-Framing/Rough-in | 6/26/2020 | 6/26/2020 | 6/26/2020 | P | PASS |
Jim Storey
|
|
|
Nathan Phone #: ###-#### 2nd floor ok
|
BLD-Final | 5/27/2020 | 5/28/2020 | 5/28/2020 | A | PASS |
Jim Storey
|
|
|
screened // Nathan Phone #: ###-#### temp ok 1st floor phase one// conf rm on hold until haedware and sinage complet.
|
FIRE-Final Inspection | 5/21/2020 | 5/27/2020 | 5/27/2020 | P | PART |
Jim Page
|
|
|
Final life fire safety inspection for TCO phase 1 level 1 is complete, signature for TCO phase 1 level 1 provided on permit sign off card.
Screened- Nathan Phone #: ###-####
|
BLD-Final | 5/13/2020 | 5/14/2020 | 5/14/2020 | A | PASS |
Jim Storey
|
|
|
Nate - requesting TCO Phone #: ###-#### phase 1 2nd floor ok for occupance.
|
FIRE-Final Inspection | 5/11/2020 | 5/13/2020 | 5/13/2020 | P | PART |
Jim Page
|
|
|
Final life fire safety inspection for TCO phase 1 is complete, signature for TCO phase 1 provided on permit sign off card.
Nathan - phase one level 2 Phone #: ###-####
|
FIRE-Alarm Testing | 5/13/2020 | 5/13/2020 | 5/13/2020 | P | CANC |
Jim Page
|
|
|
Fire alarm testing notes have been entered under FIR20-00166, this request is cancelled.
Nathan Phone #: ###-####
|
BLD-Conference | 5/6/2020 | 5/7/2020 | 5/7/2020 | A | PART |
Jim Storey
|
|
|
screened // Nate Phone #: ###-#### east 90 min fire door needs latch / remove office door.
|
Print Occupancy Form | | | 5/6/2020 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 4/28/2020 | 4/29/2020 | 4/29/2020 | P | PASS |
Jim Storey
|
|
|
Nate Phone #: ###-#### exterior south vestabui.
|
Permit Ready to Issue | | | 4/29/2020 | | DONE |
|
|
|
**DO NOT REISSUE - PLAN MOD**
|
CHANGE STATUS TO (ISS) | | | 4/29/2020 | | DONE |
|
|
|
|
Plan assigned to (CDM) | 4/7/2020 | 4/7/2020 | 4/28/2020 | | PASS |
Carl D Madsen
|
|
|
Plan Modification
Per APP Sheets Altered: see bulletin #3 and #4
G07.00, A02.01A, A04.01A, A12.20, S1.01, S4.01, S5.31
C02.00, A07.01, A07.10, S4.01, S4.03, S5.02
|
Routing - PLAN CHECK | 4/17/2020 | | 4/28/2020 | | PASS |
Carl D Madsen
|
|
|
|
BLD-Ceiling Grid Inspection | 4/13/2020 | 4/14/2020 | 4/14/2020 | A | PART |
Jim Storey
|
|
|
Nate Phone #: ###-####
|
Plan Modification Accepted | | | 4/7/2020 | | DONE |
|
|
|
Michelle @ Micron requesting to open workflow for Plan Mod.
Per APP Sheets Altered: see bulletin #3 and #4
G07.00, A02.01A, A04.01A, A12.20, S1.01, S4.01, S5.31
C02.00, A07.01, A07.10, S4.01, S4.03, S5.02
|
FIRE-Conference | 3/23/2020 | 3/23/2020 | 3/23/2020 | P | DONE |
Jim Page
|
|
|
Fire conference is complete.
Kevin Phone #: ###-####
|
BLD-Framing/Rough-in | 3/6/2020 | 3/9/2020 | 3/9/2020 | A | PASS |
Jim Storey
|
|
|
Nate Phone #: ###-#### hardlids 1st floor ok// beam in conf. rm ok.
|
BLD-Foundation | 3/5/2020 | 3/6/2020 | 3/6/2020 | A | PASS |
Jim Storey
|
|
|
Nate Phone #: ###-#### si report pending
|
BLD-Framing/Rough-in | 3/3/2020 | 3/4/2020 | 3/4/2020 | P | PASS |
Jim Storey
|
|
|
Nate Phone #: ###-#### restarooms phase 3 ok to cover all/ b2 east ceillings ok to fill and hard lids at stair and b2 ok to cover.
|
BLD-Framing/Rough-in | 2/24/2020 | 2/25/2020 | 2/25/2020 | P | PASS |
Jim Storey
|
|
|
Nate Phone #: ###-####// area a2 ceillings hard and drop in ok to cover.
|
BLD-Foundation | 2/24/2020 | 2/25/2020 | 2/25/2020 | A | PASS |
Jim Storey
|
|
|
pouring at 3pm- Nate Phone #: ###-####
|
BLD-Footing | 2/19/2020 | 2/20/2020 | 2/20/2020 | A | PASS |
Jim Storey
|
|
|
rebar-Nathan Phone #: ###-####
|
BLD-Framing/Rough-in | 1/30/2020 | 1/31/2020 | 1/31/2020 | P | PASS |
Jim Storey
|
|
|
Nathan Phone #: ###-#### restarooms backing ft ok to cover//
|
CHANGE STATUS TO (ISS) | | | 1/13/2020 | | DONE |
|
|
|
change status to ISS per Tisha, send inspection card and released Eplan
|
Print Occupancy Form | | | 1/13/2020 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/10/2020 | | DONE |
|
|
|
met Need
Cert of Value
|
Routing - FIRE | 12/3/2019 | 12/3/2019 | 1/9/2020 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Routing - PLAN CHECK | 12/3/2019 | | 12/13/2019 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - MECHANICAL | 12/12/2019 | | 12/12/2019 | | PASS |
Troy James
|
|
|
|
BLD-Framing/Rough-in | 12/6/2019 | 12/9/2019 | 12/9/2019 | A | PASS |
Jim Storey
|
|
|
Nate Phone #: ###-#### walls and soffits 1st and 2nd floors phase 1 ok
|
Routing - PLANNING | 12/3/2019 | | 12/6/2019 | | PASS |
Karla Nelson
|
|
|
|
Routing - PUBLIC WORKS | 12/3/2019 | | 12/5/2019 | | PASS |
Morgan Webb
|
|
|
CONSUMPTION PURCHASED.
|
Routing - Design Review | 12/3/2019 | | 12/4/2019 | | PASS |
Josh Wilson
|
|
|
|
Routing PW Sewer Design | 12/4/2019 | | 12/4/2019 | | PASS |
DeAnn Brown
|
|
|
Connecting to on-site sewer main.
|
Routing - Addressing | 12/3/2019 | | 12/3/2019 | | PASS |
Laura Hunter
|
|
|
|
Routing - MECHANICAL | 12/3/2019 | | 12/3/2019 | | FAIL |
Troy James
|
|
|
Need commissioning form 308 uploaded and completed.
|
Routing - PLUMBING | 12/3/2019 | | 12/3/2019 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Issue & PRINT to be Invoiced | | | 10/23/2019 | | DONE |
|
|
|
|
MISC ACTIONS | | | 10/23/2019 | | DONE |
|
|
|
Only Early Start permit issued. In eplan, sent plans back to applicant to upload full set of plans when ready to start review for full scope of work for permit.
|
Route to Impact Fee Review | 10/21/2019 | 10/24/2019 | 10/21/2019 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Plan assigned to (CDM) | 10/15/2019 | 10/15/2019 | 10/21/2019 | | PASS |
Carl D Madsen
|
|
|
Micron Early Start
|
Routing - PLAN CHECK | 10/15/2019 | | 10/21/2019 | | PASS |
Carl D Madsen
|
|
|
|
1st review completed | | | 10/21/2019 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/21/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/21/2019 | | DONE |
|
|
|
met
Need: GC Form
|
Intake Approval | | | 10/11/2019 | | PASS |
|
|
|
|
Intake Approval | | | 9/27/2019 | | FAIL |
|
|
|
Architects stamp required.
Remove not for construction stamp.
|
Application received | | | 9/13/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 13 2019 11:31AM
|
Routing - PLAN CHECK | 4/7/2020 | | | | |
Carl D Madsen
|
|
|
|