BLD-Final | 3/12/2020 | 3/13/2020 | 3/13/2020 | A | PASS |
Tell Riley
|
|
|
Garage code 3162 Phone #: ###-#### Inspection requested via web by Kelly Stover//need to update insulation values on permit, kelly will take care of//ok otherwise//
|
DOC - Permit Finaled | 3/13/2020 | 3/13/2020 | 3/13/2020 | P | PASS |
Tell Riley
|
|
|
|
BLD-Final | 3/10/2020 | 3/11/2020 | 3/11/2020 | A | NR |
Tell Riley
|
|
|
Garage code 3162 Phone #: ###-#### Inspection requested via web by Kelly Stover//plans show r49 attic insulation, tag shows r 38 installed//
|
BLD-Blower Door Test Results | 3/11/2020 | 3/11/2020 | 3/11/2020 | A | DONE |
Tell Riley
|
|
|
2.92 ACH 50
|
BLD-Other | 1/7/2020 | 1/8/2020 | 1/8/2020 | A | PASS |
Tell Riley
|
|
|
Soffit fire barrier Phone #: ###-#### Inspection requested via web by Kelly Stover//ok per plans//
|
BLD-Wall Bracing | 1/2/2020 | 1/2/2020 | 1/2/2020 | P | PASS |
Tell Riley
|
|
|
corrections made//
|
BLD-Framing/Rough-in | 1/1/2020 | 1/2/2020 | 1/2/2020 | A | PASS |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Kelly Stover//corrections made//
|
BLD-Energy code compliance | 1/1/2020 | 1/2/2020 | 1/2/2020 | A | PASS |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Kelly Stover
|
BLD-Framing/Rough-in | 12/27/2019 | 12/27/2019 | 12/27/2019 | P | PART |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Kelly Stover//ok to insulate,, check bathroom doorway header, hangers at landing//CN posted//
|
BLD-Wall Bracing | 11/25/2019 | 11/27/2019 | 11/27/2019 | A | FAIL |
Tell Riley
|
|
|
Mark Phone #: ###-####/need to add blocking on first story at all panel edges at shear locations(some vertical blocking will be needed)//Let GC know about eaves that will need to be 24 inches from PL//re-inspection required//
|
BLD-Foundation | 10/25/2019 | 10/28/2019 | 10/28/2019 | P | PART |
Tell Riley
|
|
|
wall... 2 if possible // Mark Phone #: ###-####//ok per plans//blankets are the way//confirmed with Mark//
|
BLD-Footing | 10/24/2019 | 10/25/2019 | 10/25/2019 | P | PASS |
Tell Riley
|
|
|
about 2 it will be ready // mark Phone #: ###-####//per plans//
|
Inspection Record Card- Bld | | | 10/22/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/22/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 10/4/2019 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/4/2019 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 10/4/2019 | | DONE |
|
|
|
met
|
Plan assigned to (J_N) | 9/23/2019 | 9/23/2019 | 10/3/2019 | | DONE |
Jenny Nelson
|
|
|
10/04 sfd L1 ePlan
|
Routing - PLAN CHECK | 9/23/2019 | | 10/3/2019 | | PASS |
Jenny Nelson
|
|
|
|
1st review completed | | | 10/3/2019 | | DONE |
Jenny Nelson
|
|
|
|
Routing - MECHANICAL | 9/23/2019 | | 9/25/2019 | | PASS |
Chad Schwendiman
|
|
|
|
Route to Impact Fee Review | 9/23/2019 | 9/26/2019 | 9/24/2019 | | PASS |
Shannon Cade
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PLANNING | 9/23/2019 | | 9/23/2019 | | PASS |
Sue Cummings
|
|
|
The front of the lot is 25 ft. wide. A common area abuts the street side so there is no oppertuity for access there. There is no way 50 ft. from the corner to the driveway will ever happen. Since the City approved the plat, I will pass the permit. Sue Cummings 9/23/19
|
Routing - Addressing | 9/23/2019 | | 9/23/2019 | | PASS |
Doug Chausow
|
|
|
Corrected address: 9678 W Macaw St
|
Routing - PUBLIC WORKS | 9/23/2019 | | 9/23/2019 | | PASS |
Morgan Webb
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/23/2019 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/23/2019 | | DONE |
|
|
|
|
Intake Approval | | | 9/23/2019 | | PASS |
|
|
|
|
Application received | | | 9/17/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 17 2019 9:51AM
|
Intake Approval | | | 9/17/2019 | | FAIL |
|
|
|
Address does not match what is on the manual j and plans to the address on the application/lot and block.
|