Permanent Occupancy | | | 7/29/2020 | | DONE |
|
|
|
|
Permanent Occupancy | | | 7/29/2020 | | DONE |
|
|
|
|
BLD-Final | 5/27/2020 | 5/28/2020 | 5/28/2020 | A | PASS |
Brandon Shaw
|
|
|
screened // Paul Phone #: ###-####
|
DOC - Permit Finaled | 5/28/2020 | 5/28/2020 | 5/28/2020 | P | PASS |
Brandon Shaw
|
|
|
|
Temporary Occupancy | 5/18/2020 | 8/16/2020 | 5/18/2020 | | DONE |
Judith Amador
|
|
|
|
BLD-Final | 5/14/2020 | 5/15/2020 | 5/15/2020 | P | PART |
Mike Jordan
|
|
|
Paul Phone #: ###-####. Ok for temp occ. Needs to provide ADA POS.
|
FIRE-Final Inspection | 5/13/2020 | 5/14/2020 | 5/14/2020 | A | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, curtian that was causing fire sprinkler blockage has been removed, no fire sprinkler modifications, no fire alarm modifications, fire extinguishers are in common areas with current inspection tags. Final life fire safety inspection is complete, signatures provided on permit sign off card.
Paul *screened* Phone #: ###-####
|
FIRE-Final Inspection | 3/9/2020 | 3/10/2020 | 3/10/2020 | A | FAIL |
Jim Page
|
|
|
Fire sprinkler modifications are required in area of work, fire sprinkler modifications will reuqire a seperate permit. Entry door hardware does not comply with 1010.1.9.1 of the 2015 International Fire Code. Provide annual inspection on fire extinguishers and wall mount fire extinguishers as discussed, extinguishers are not to be placed on the floor per code requirements, extinguisher must be mounted, not less than 4 inches off of the floor and not more than 48 inches to extinguisher mechanism.
Paul- please call for access Phone #: ###-####
|
FIRE-Final Inspection | 3/4/2020 | 3/6/2020 | 3/6/2020 | A | FAIL |
Jim Page
|
|
|
Could not access space due to being locked, provide code compliant door hardware on main entry.
Paul Phone #: ###-####
|
BLD-Final | 3/2/2020 | 3/4/2020 | 3/4/2020 | A | NR |
Brandon Shaw
|
|
|
Need Fire/life...
|
Print Occupancy Form | | | 3/4/2020 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/12/2020 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 2/12/2020 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 2/10/2020 | | DONE |
Javier Guzman
|
|
|
uploaded into ePlan the 302 form, the revised certificate of value and the owner letter of self-tenant improvements from owner.
|
Telephone call | | | 2/10/2020 | | DONE |
|
|
|
Email Paul requesting to correct the Certificate of Value because there was a letter of his name missing.
|
Route to Impact Fee Review | 10/2/2019 | 10/5/2019 | 10/2/2019 | | PASS |
Shannon Cade
|
|
|
Review requested for Commercial Permit
|
Plan assigned to (M_H) | 9/27/2019 | | 10/2/2019 | | DONE |
Michael Hanson
|
|
|
10/02 #518 L1 ePlan - Fidelity Building: source T.I.
|
Routing - PLAN CHECK | 9/27/2019 | | 10/2/2019 | | PASS |
Michael Hanson
|
|
|
|
1st review completed | | | 10/2/2019 | | DONE |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/2/2019 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 10/2/2019 | | DONE |
|
|
|
ALL MET NEED
GC
Revised Certificate of Value
|
Routing - Addressing | 9/27/2019 | | 10/1/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 9/27/2019 | | 9/27/2019 | | PASS |
Morgan Webb
|
|
|
NO NEW PLUMBING
|
Intake Approval | | | 9/26/2019 | | PASS |
Javier Guzman
|
|
|
|
Application received | | | 9/24/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 24 2019 11:58AM
|