Second Notice | | 3/15/2020 | 3/19/2020 | | DONE |
|
|
|
This permit finaled on the web by Brian McCoy
|
First Notice | | 2/14/2020 | 3/5/2020 | | DONE |
|
|
|
mailed 3-6-20
|
FIRE-Final Inspection | 2/3/2020 | 2/4/2020 | 2/4/2020 | A | PASS |
Jim Page
|
|
|
Final life fire safety inspection for area of work is complete.
please call 20 before thanks Phone #: ###-#### Inspection requested via web by Todd Landvatter
|
Permanent Occupancy | | | 2/4/2020 | | DONE |
|
|
|
|
BLD-Final | 1/27/2020 | 1/28/2020 | 1/28/2020 | A | PASS |
Dave Hannah
|
|
|
fire will give temp CofO today in the AM. Phone #: ###-#### Inspection requested via web by Todd Landvatter ok for tco ok for perm co after fire oks for perm co (spoke with Dave H on the phone, ok for perm occ since fire signed off, changed from pending to pass 2-4-20)
|
FIRE-Final Inspection | 1/27/2020 | 1/28/2020 | 1/28/2020 | A | PART |
Jim Page
|
|
|
Partial final inspection for life fire safety complete, no fire sprinkler modifications, fire alarm inspection is complete, fire extinguishers are placed with current inspection tags. Lobby doors now comply with 1010.1.9.8 of the 2015 IFC, west stairwell door will be getting new hardware, plans are to be submitted to verify new hardware is code compliant. 30 day TCO authorized for life fire safety per conversation with Joe Bruce, Fire Section Supervisor. Last remaining item too inspect will be door hardware/access control on west stairwell door after hardware is approved and inspected for compliance.
Phone #: ###-#### Inspection requested via web by Todd Landvatter
|
Extend Permit 90/180 days | 1/27/2020 | 1/28/2020 | 1/27/2020 | A | CANC |
Jim Page
|
|
|
Phone #: ###-#### Inspection requested via web by Todd Landvatter
|
FIRE-Final Inspection | 1/27/2020 | 1/27/2020 | 1/27/2020 | A | CANC |
Jim Page
|
|
|
Phone #: ###-#### Inspection requested via web by Todd Landvatter
|
BLD-Final | 1/24/2020 | 1/27/2020 | 1/27/2020 | A | NR |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Todd Landvatter needs fire finaled first
|
FIRE-Final Inspection | 1/24/2020 | 1/27/2020 | 1/27/2020 | A | FAIL |
Jim Page
|
|
|
Electromagnetically locked doors in lobby does not comply with 1010.1.9.9, note 1. Door needs to comply with 1010.1.9.8 due to the door being electrically locked, required criteria is listed under section 1010.1.9.8 of the 2015 IFC. Door hardware on hallway egress door to stairwell is to be changed to access controilled type hardware, city approved plans need to reflect hardware change, plans currently show hardware being existing.
Phone #: ###-#### Inspection requested via web by Todd Landvatter
|
BLD-Framing/Rough-in | 12/9/2019 | 12/9/2019 | 12/9/2019 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Todd Landvatter
|
Telephone call | | | 11/21/2019 | | DONE |
|
|
|
send email with fees due to -office@sl-builders.com
|
Issue PAID IN FULL permit | | | 11/21/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/21/2019 | | DONE |
|
|
|
|
Plan assigned to (JG) | 10/23/2019 | 10/23/2019 | 11/5/2019 | | PASS |
Javier Guzman
|
|
|
10/28 L1 Agricultural Research Service ePlan
|
Routing - PLAN CHECK | 10/23/2019 | | 11/5/2019 | | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 11/5/2019 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/5/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/5/2019 | | DONE |
|
|
|
ALL MET- NEED
GC FORM
REVISED VALUE
|
Routing - Addressing | 10/23/2019 | | 10/24/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 10/23/2019 | | 10/23/2019 | | PASS |
Morgan Webb
|
|
|
|
Intake Approval | | | 10/22/2019 | | PASS |
Javier Guzman
|
|
|
|
Application received | | | 10/18/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 18 2019 7:54AM
|