Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD19-04195
StatusFinaled
Name GREEN TEAM CONSTRUCTION LLC
Site Address 2480 N MAPLE GROVE RD
Project NameNUKIC VEHICLE DAMAGE REPAIR
Customer Number 
ePlanReviewNo
Description
Permit for a repair due to vehicle collision. Work to include: Complete replacement of 3 exterior walls, structural engineering provided which indicates one joist and one beam will need to be added as well as a sistered joist. All work per plans, notations, attachments, engineering, local codes & ordinances. Separate electrical & mechanical permits required. **MDH**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/10/201912/10/201912/10/2019PPASS
DetailsTell Riley
Lucas Phone #: ###-####//step added//smoke and CO detectors installed//final complete//
DOC - Permit Finaled12/10/201912/10/201912/10/2019PPASS
DetailsTell Riley
Override - Parcel Holds12/10/20191/1/190012/10/2019  
this parcel hold applies to any future permits
BLD-Final12/6/201912/9/201912/9/2019AFAIL
DetailsTell Riley
Lucas - please call 30 min prior Phone #: ###-####//need to add step on side door//need to add smoke and combo detectors//CN posted//
Override - Parcel Holds12/6/20191/1/190012/6/2019  
final inspection on this permit BLD19-04195 can be schedule per Rock's parcel tag, but NO future permits until corrections are see MIS19-00391
BLD-Energy code compliance11/13/201911/14/201911/14/2019APASS
DetailsTell Riley
Lucas Phone #: ###-####
BLD-Energy code compliance11/12/201911/13/201911/13/2019AFAIL
DetailsTell Riley
Lucas Garcia Phone #: ###-####//wall with new door due to damage is not insulated//
BLD-Framing/Rough-in11/6/201911/7/201911/7/2019PPART
DetailsTell Riley
Lucas Phone #: ###-####//need airseal-will check at energy inspection discussed with contractor//
BLD-Wall Bracing10/25/201910/25/201910/25/2019PPASS
DetailsTell Riley
nailing ok//will frame in above window //
BLD-Framing/Rough-in10/23/201910/25/201910/25/2019ANR
DetailsTell Riley
LUCAS Phone #: ###-####//left message with contact//will need electrical rough in and mechanical rough in passed per description of project//re inspection for framing will need to be scheduled//
BLD-Footing10/21/201910/22/201910/22/2019APASS
DetailsTell Riley
Lucas Phone #: ###-####//added pier supports and beam per engineering//floor joists fixed as per engineering//
Routing Walk-In (Zoning)10/21/201910/21/201910/21/2019PPASS
DetailsEthan Mansfield
repair of structure due to calamity (car crash). Value of repair is less than 50% of total value.
Routing Walk-In (BLD)10/21/201910/21/201910/21/2019PPASS
DetailsMichael Hanson
Routing - PLAN CHECK10/21/2019 10/21/2019 PASS
DetailsMichael Hanson
1st review completed  10/21/2019 DONE
DetailsMichael Hanson
PLANS/APPL TAKEN TO FRONT DESK  10/21/2019 DONE
DetailsMichael Hanson
Inspection Record Card- Bld  10/21/2019 DONE
DetailsMichael Hanson
Case Summary (BLD)  10/21/2019 DONE
DetailsMichael Hanson
Permit Ready to Issue  10/21/2019 DONE
Issue PAID IN FULL permit  10/21/2019 DONE
Application received 10/21/2019