BLD-Blower Door Test Results | 5/1/2020 | 5/1/2020 | 5/1/2020 | P | DONE |
Tell Riley
|
|
|
2.96 ACH 50
|
BLD-Final | 4/30/2020 | 5/1/2020 | 5/1/2020 | A | PASS |
Tell Riley
|
|
|
Screened-Christina Phone #: ###-####
|
DOC - Permit Finaled | 5/1/2020 | 5/1/2020 | 5/1/2020 | P | PASS |
Tell Riley
|
|
|
|
BLD-Energy code compliance | 2/27/2020 | 2/28/2020 | 2/28/2020 | A | PASS |
Tell Riley
|
|
|
Chrisitna Phone #: ###-####
|
BLD-Framing/Rough-in | 2/25/2020 | 2/26/2020 | 2/26/2020 | A | PASS |
Tell Riley
|
|
|
Christina Phone #: ###-####
|
BLD-Wall Bracing | 2/10/2020 | 2/11/2020 | 2/11/2020 | A | PASS |
Tell Riley
|
|
|
Christina Phone #: ###-####//shear nailing ok//check interior hold down connections at framing//
|
BLD-Wall Bracing | 12/26/2019 | 12/27/2019 | 12/27/2019 | A | PASS |
Tell Riley
|
|
|
concrete at 11 pm // Brian Phone #: ###-####//setbacks per plan//wall ok to pour//blankets onsite// frost protection required//
|
BLD-Footing | 12/23/2019 | 12/23/2019 | 12/23/2019 | P | PART |
Tell Riley
|
|
|
Brian Phone #: ###-####//WIP//blankets onsite//setbacks measured per plans//
|
Issue PAID IN FULL permit | | | 12/6/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/6/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 11/19/2019 | | |
|
|
|
|
Permit Ready to Issue | | | 11/19/2019 | | DONE |
|
|
|
met
|
Plan assigned to (JAB) Josh | 11/18/2019 | 11/18/2019 | 11/18/2019 | | PASS |
Josh Bogle
|
|
|
11/04 sfd L1 ePlan
|
Plan assigned to (RDP) | 10/22/2019 | 10/22/2019 | 11/18/2019 | | DEFR |
Rob Patrick
|
|
|
11/4 sfd L1 ePlan
|
Routing - PLAN CHECK | 10/22/2019 | | 11/18/2019 | | PASS |
Rob Patrick
|
|
|
|
1st review completed | | | 11/18/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/18/2019 | | DONE |
Josh Bogle
|
|
|
|
Routing - PLANNING | 10/22/2019 | | 10/30/2019 | | PASS |
Leon Letson
|
|
|
|
Route to Impact Fee Review | 10/22/2019 | 10/25/2019 | 10/23/2019 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PUBLIC WORKS | 10/22/2019 | | 10/23/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing - Addressing | 10/22/2019 | | 10/22/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - MECHANICAL | 10/22/2019 | | 10/22/2019 | | PASS |
Troy James
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/22/2019 | | DONE |
|
|
|
|
Intake Approval | | | 10/22/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/22/2019 | | DONE |
|
|
|
|
Application received | | | 10/21/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 21 2019 3:36PM
|