BLD-Final | 6/12/2020 | 6/15/2020 | 6/15/2020 | A | PASS |
Tony Young
|
|
|
Screened- Duplex- please if possible call at least an hour ahead(was informed that it may not be possible)-Crysta Phone #: ###-####
|
DOC - Permit Finaled | 6/15/2020 | 6/15/2020 | 6/15/2020 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 6/11/2020 | 6/11/2020 | 6/15/2020 | P | PEND |
Tony Young
|
|
|
Screened- Duplex- please if possible call at least an hour ahead(was informed that it may not be possible)-Crysta Phone #: ###-####
|
Zoning Approval | 6/15/2020 | 6/15/2020 | 6/15/2020 | | DONE |
Ethan Mansfield
|
|
|
|
BLD-Final | 6/11/2020 | 6/12/2020 | 6/12/2020 | A | PEND |
Tony Young
|
|
|
Screened- Duplex- please if possible call at least an hour ahead(was informed that it may not be possible)-Crysta Phone #: ###-####// ok pending zoning pass
|
BLD-Blower Door Test Results | 6/11/2020 | 6/12/2020 | 6/12/2020 | A | DONE |
Tony Young
|
|
|
Screened- Duplex- please if possible call at least an hour ahead(was informed that it may not be possible)-Crysta Phone #: ###-####// 4.9
|
BLD-Framing/Rough-in | 4/8/2020 | 4/9/2020 | 4/10/2020 | P | PASS |
Tony Young
|
|
|
Re-inspection for framing.
Thanks Phone #: ###-#### Inspection requested via web by Krista Caldwell
|
BLD-Energy code compliance | 4/9/2020 | 4/10/2020 | 4/10/2020 | A | PASS |
Tony Young
|
|
|
Re-inspection for framing also.
Thanks Phone #: ###-#### Inspection requested via web by Krista Caldwell
|
BLD-Wall Bracing | 4/6/2020 | 4/7/2020 | 4/7/2020 | A | PASS |
Tony Young
|
|
|
wall bracing, .
Thanks Phone #: ###-#### Inspection requested via web by Krista Caldwell
|
BLD-Framing/Rough-in | 4/6/2020 | 4/6/2020 | 4/6/2020 | P | PART |
Tony Young
|
|
|
Please inspect at or after 4 PM. Also we have a partial on the wall bracing, if we could get a sign off on that as well, that would be great.
Thanks Phone #: ###-#### Inspection requested via web by Krista Caldwell// most ok,, need to verrify hanger size in the main room on south unit
|
BLD-Framing/Rough-in | 4/2/2020 | 4/2/2020 | 4/2/2020 | P | PART |
Tony Young
|
|
|
If at all possible, I would like to attend the walk through. I will need a minimum of 30 minutes notice. 1 hour notice preferred.
Thank you Phone #: ###-#### Inspection requested via web by Krista Caldwell,, minor fixes needed,, truss bracing, tempered glass,, etc. see paint,, ok to insulate
|
BLD-Wall Bracing | 3/5/2020 | 3/5/2020 | 3/5/2020 | P | PART |
Tony Young
|
|
|
Inspection request for after 3:30 today. Phone #: ###-#### Inspection requested via web by Krista Caldwell.. exterior ok to cover
|
BLD-Foundation | 2/20/2020 | 2/21/2020 | 2/21/2020 | A | PASS |
Tony Young
|
|
|
Krista; Phone #: ###-####
|
BLD-Conference | 2/20/2020 | 2/20/2020 | 2/20/2020 | P | PASS |
Tony Young
|
|
|
Krista; Phone #: ###-####// recieved letter from SITE ( Bob Arnold) engineering of approval of soils testing
|
BLD-Footing | 2/3/2020 | 2/4/2020 | 2/4/2020 | A | PEND |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Krista Caldwell///setbacks appears ok,, on site at 12pm,, pouring,, about 1/2 way done,, ground apparently was not covered through the night,, tested a few areas for temp,, readings indicated that the soils were frozen around 11 - 14 degree F.,, needs engineer approval
|
BLD-Conference | 1/24/2020 | 1/27/2020 | 1/27/2020 | P | DONE |
Mike Jordan
|
|
|
This is my first building in Boise, and I would like a quick break down of the inspections required. Phone #: ###-#### Inspection requested via web by Krista Caldwell. Reviewed required inspections and informed Kristi that property pins for lot are required.
|
BLD-Foundation | 1/24/2020 | 1/27/2020 | 1/27/2020 | P | CANC |
Mike Jordan
|
|
|
If you need me to be onsite. Please give me a call 1 hour prior.
Thank you Phone #: ###-#### Inspection requested via web by Krista Caldwell
|
BLD-Footing | 1/27/2020 | 1/27/2020 | 1/27/2020 | P | PART |
Mike Jordan
|
|
|
If you need me to be onsite. Please give me a call 1 hour prior.
Thank you Phone #: ###-#### Inspection requested via web by Krista Caldwell. Contacted Krista Caldwell at provided number. Needs to have surveyor come out and provide pins for property lines.
|
Issue PAID IN FULL permit | | | 1/6/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/6/2020 | | DONE |
|
|
|
|
OVERRIDE | | | 12/16/2019 | | |
|
|
|
|
Plan assigned to (J_N) | 11/6/2019 | 11/6/2019 | 12/16/2019 | | DONE |
Jenny Nelson
|
|
|
11/19 sfd L1 ePlan. 1st complete, questions on fire rated assembly
|
Routing - PLAN CHECK | 12/16/2019 | | 12/16/2019 | | PASS |
Jenny Nelson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/16/2019 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 12/16/2019 | | DONE |
|
|
|
met
|
1st review completed | | | 11/26/2019 | | DONE |
Jenny Nelson
|
|
|
|
Routing - PLAN CHECK | 11/6/2019 | | 11/26/2019 | | FAIL |
Jenny Nelson
|
|
|
Common wall fire rated assembly
|
Route to Impact Fee Review | 11/6/2019 | 11/9/2019 | 11/7/2019 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PUBLIC WORKS | 11/6/2019 | | 11/7/2019 | | PASS |
Candy A. Nichols
|
|
|
7###-#### DUPLEX
|
Routing - MECHANICAL | 11/6/2019 | | 11/6/2019 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 11/6/2019 | | 11/6/2019 | | PASS |
Ethan Mansfield
|
|
|
|
Routing - Addressing | 11/6/2019 | | 11/6/2019 | | PASS |
Doug Chausow
|
|
|
7468 and 7454 N Gardner Ln
|
Plans ACCEPTED BY PLAN TECH | | | 11/6/2019 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/6/2019 | | DONE |
|
|
|
|
Intake Approval | | | 11/4/2019 | | FAIL |
|
|
|
1st Prescreen- Plans mus be uploaded as individual sheets. Allow for stamp area. Plans sheets must be a minimum of 24x18. Drawing file names must include the first characters of the discipline name, followed by the sheet number and name. Example: A2.0_Floor Plan
|
Intake Approval | | | 11/4/2019 | | PASS |
|
|
|
|
Application received | | | 10/28/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 28 2019 12:25PM
|